Energy renovation of public buildings in the municipality of Orneta (Q132291): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project consists of the thermal refurbishment of the public buildings of the Municipality of Orneta and will be carried out within its borders, including in areas such as: • Primary school at ul. Highlands 17a, 11-130 Orneta (dz. No 113/1, 114/1; 114/2 rim 2, Orneta, Orneta municipality,• Pre-school no. 1 at Ornecie located at ul. Kopernika 4, 11-130 Orneta (dz. 149/3, strip 3, City of Orneta),• City House of Culture in Orléans, ul. 1 May...) |
||
Property / summary | |||
Property / summary: The project consists of the thermal refurbishment of the public buildings of the Municipality of Orneta and will be carried out within its borders, including in areas such as: • Primary school at ul. Highlands 17a, 11-130 Orneta (dz. No 113/1, 114/1; 114/2 rim 2, Orneta, Orneta municipality,• Pre-school no. 1 at Ornecie located at ul. Kopernika 4, 11-130 Orneta (dz. 149/3, strip 3, City of Orneta),• City House of Culture in Orléans, ul. 1 May 45, 11-130 Orneta (dz. No 305, 187/12, 187/52, 188/2, 1° Orneta). The implementation of this project consists of a comprehensive energy modernisation of the above-mentioned public buildings of the Municipality of Orneta, taking into account: replacement of wiring, insulation of roof and roof, insulation of external walls, replacement of old windows and doors, replacement of the radiators by new thermoadjustable radiator valves, assembly of the vents on the rails and adjustment of the installation. The detailed scope of this work, broken down by individual building, is to be found in Chapter 2. Project identification, feasibility study. The project will result in a 60.40 % reduction in the consumption of the public buildings in the municipality of Orneta of energy, while reducing their energy consumption costs by PLN 112 907,21 per year, and reducing the pollutant emissions generated by these plants, including the reduction of CO2 emissions by 63.95 %, as a result of which it fits in with the objective of sub-measure 4.3.1 ROP WiM 2014-2020: “A major energy efficiency in public buildings”. All preparatory activities for the implementation of the project, as well as those already related to its execution and settlement, will be carried out or supervised by the staff of the Municipal Office in Orney. (English) / rank | |||
Revision as of 17:11, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy renovation of public buildings in the municipality of Orneta |
Project in Poland financed by DG Regio |
Statements
1,398,158.8 zloty
0 references
1,827,658.57 zloty
0 references
76.5 percent
0 references
29 December 2016
0 references
31 August 2021
0 references
GMINA ORNETA
0 references
Przedmiotowe przedsięwzięcie polega na termomodernizacji budynków użyteczności publicznej Gminy Orneta i realizowane będzie w jej granicach, w tym w takich miejscach, jak: • Szkoła Podstawowa w Bażynach zlokalizowana przy ul. Bażyny 17a, 11-130 Orneta (dz. Nr 113/1, 114/1; 114/2 obręb 2 Bażyny, gmina Orneta), • Przedszkole nr 1 w Ornecie zlokalizowane przy ul. Kopernika 4, 11-130 Orneta (dz. Nr 149/3, obręb 3, Miasto Orneta), • Miejski Dom Kultury w Ornecie zlokalizowany przy ul. 1 maja 45, 11-130 Orneta (dz. Nr 305, 187/12, 187/52, 188/2, obręb 1 Orneta). Realizacja niniejszego projektu polega na wykonanie kompleksowej modernizacji energetycznej ww. budynków użyteczności publicznej Gminy Orneta, uwzględniającej: wymianę przewodów instalacji, docieplenie stropodachu i dachu, docieplenie ścian zewnętrznych, wymianę starych okien i drzwi, wymianę grzejników na nowe z zaworami termostatycznymi przygrzejnikowymi, montaż odpowietrzników na pionach oraz regulacja instalacji. Szczegółowy zakres niniejszych prac w podziale na poszczególne budynki znajduje się w rozdziale 2. Identyfikacja projektu, Studium Wykonalności. Efektem tak zaplanowanego przedsięwzięcia będzie redukcja zużycia przez przedmiotowe budynki użyteczności publicznej Gminy Orneta energii o 60,40%, zmniejszając przy tym koszty ich utrzymania z zakresu zużycia energii o 112 907,21 zł/ rok, a także redukując emisję zanieczyszczeń generowanych przez obiekty te, w tym ograniczenie emisji CO2 o 63,95%, dzięki czemu wpisuje się ono w swoich założeniach w cel Poddziałania 4.3.1 RPO WiM 2014-2020, jakim jest: „Zwiększona efektywność energetyczna budynków użyteczności publicznej". Wszelkie czynności przygotowawcze do realizacji przedmiotowego przedsięwzięcia, a także te związane już z samym jego wykonaniem oraz rozliczeniem, będą prowadzone lub nadzorowane przez pracowników Urzędu Miejskiego w Ornecie. (Polish)
0 references
Identifiers
RPWM.04.03.01-28-0045/18
0 references