Modernisation of the production line of the company Ivory Ceramics sp. z o.o. (Q132219): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project consists of an upgrading of the production line in the company Ivory sp. z o.o., consisting of an exchange of an existing electric tunnel for the decoration of ceramics and glass on a new device with better technical parameters with recovery of technological heat and with reduced electricity demand. The efficiency of the currently used electric furnace for decoration is low, as the hydraulic system and the control system have force...) |
(Created claim: summary (P836): The project consists of the modernisation of the production line in the company Ivory sp. z o.o., which consists of replacing the existing tunnel kiln for decoration with ceramics and glass for a new device with better technical parameters with recovery of technological heat and less demand for electricity. The efficiency of the electric kiln currently used for decoration is low, as the hydraulic system and the control system forces the continuo...) |
||||||||||||||
Property / summary | |||||||||||||||
The project consists of the modernisation of the production line in the company Ivory sp. z o.o., which consists of replacing the existing tunnel kiln for decoration with ceramics and glass for a new device with better technical parameters with recovery of technological heat and less demand for electricity. The efficiency of the electric kiln currently used for decoration is low, as the hydraulic system and the control system forces the continuous operation of electric motors, and the low insulation of the furnace partitions forces additional work of electric heaters, which results in significant electricity consumption, thus reducing the total efficiency of the device. The system is energy-intensive because there is not sufficient thermal insulation of the furnace partitions separating the production part (heating tunnel), in addition it is not equipped with a heat recovery system in the form of heat recovery from secondary circulation air and therefore requires continuous operation of high-power electric heaters, resulting from measurements made. Electric motors, conveyor belts are largely exploited, and the device itself has used up technology. The project contributes to solving all identified key stakeholders’ problems in the project area. The project started in the first quarter of 2018 and will be completed in the fourth quarter of 2019. The project will be implemented in one stage. The work schedule will ensure the implementation of the project within 1 from the signing of the co-financing agreement. The project fits into the assumptions of the SzOOP RPO WiM 2014-2020 by improving the energy efficiency of the company. The objective of the project is directly in line with the objective of sub-measure 4.2 ‘Energy energy efficiency in enterprises’. Thanks to the modernisation of the line, the company will save an estimated 71786.72 kWh of final energy per year, while the avoided CO2 emissions will amount to 24.969 MgCO2. (English) | |||||||||||||||
Property / summary: The project consists of the modernisation of the production line in the company Ivory sp. z o.o., which consists of replacing the existing tunnel kiln for decoration with ceramics and glass for a new device with better technical parameters with recovery of technological heat and less demand for electricity. The efficiency of the electric kiln currently used for decoration is low, as the hydraulic system and the control system forces the continuous operation of electric motors, and the low insulation of the furnace partitions forces additional work of electric heaters, which results in significant electricity consumption, thus reducing the total efficiency of the device. The system is energy-intensive because there is not sufficient thermal insulation of the furnace partitions separating the production part (heating tunnel), in addition it is not equipped with a heat recovery system in the form of heat recovery from secondary circulation air and therefore requires continuous operation of high-power electric heaters, resulting from measurements made. Electric motors, conveyor belts are largely exploited, and the device itself has used up technology. The project contributes to solving all identified key stakeholders’ problems in the project area. The project started in the first quarter of 2018 and will be completed in the fourth quarter of 2019. The project will be implemented in one stage. The work schedule will ensure the implementation of the project within 1 from the signing of the co-financing agreement. The project fits into the assumptions of the SzOOP RPO WiM 2014-2020 by improving the energy efficiency of the company. The objective of the project is directly in line with the objective of sub-measure 4.2 ‘Energy energy efficiency in enterprises’. Thanks to the modernisation of the line, the company will save an estimated 71786.72 kWh of final energy per year, while the avoided CO2 emissions will amount to 24.969 MgCO2. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project consists of the modernisation of the production line in the company Ivory sp. z o.o., which consists of replacing the existing tunnel kiln for decoration with ceramics and glass for a new device with better technical parameters with recovery of technological heat and less demand for electricity. The efficiency of the electric kiln currently used for decoration is low, as the hydraulic system and the control system forces the continuous operation of electric motors, and the low insulation of the furnace partitions forces additional work of electric heaters, which results in significant electricity consumption, thus reducing the total efficiency of the device. The system is energy-intensive because there is not sufficient thermal insulation of the furnace partitions separating the production part (heating tunnel), in addition it is not equipped with a heat recovery system in the form of heat recovery from secondary circulation air and therefore requires continuous operation of high-power electric heaters, resulting from measurements made. Electric motors, conveyor belts are largely exploited, and the device itself has used up technology. The project contributes to solving all identified key stakeholders’ problems in the project area. The project started in the first quarter of 2018 and will be completed in the fourth quarter of 2019. The project will be implemented in one stage. The work schedule will ensure the implementation of the project within 1 from the signing of the co-financing agreement. The project fits into the assumptions of the SzOOP RPO WiM 2014-2020 by improving the energy efficiency of the company. The objective of the project is directly in line with the objective of sub-measure 4.2 ‘Energy energy efficiency in enterprises’. Thanks to the modernisation of the line, the company will save an estimated 71786.72 kWh of final energy per year, while the avoided CO2 emissions will amount to 24.969 MgCO2. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 16:59, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of the production line of the company Ivory Ceramics sp. z o.o. |
Project in Poland financed by DG Regio |
Statements
599,908.75 zloty
0 references
705,775.0 zloty
0 references
85.0 percent
0 references
15 March 2018
0 references
31 December 2019
0 references
IVORY CERAMICS SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Projekt polega na modernizacji linii produkcyjnej w przedsiębiorstwie Ivory sp. z o.o. polegającej na wymianie istniejącego pieca elektrycznego tunelowego do dekoracji na ceramice oraz szkle na nowe urządzenie o lepszych parametrach technicznych z odzyskiem ciepła technologicznego i o mniejszym zapotrzebowaniu na energie elektryczną. Sprawność obecnie używanego pieca elektrycznego do dekoracji jest niska, gdyż układ hydrauliczny i system sterowania wymusza pracę ciągłą silników elektrycznych, ponadto niska izolacyjność przegród pieca wymusza dodatkową pracę grzałek elektrycznych, co powoduje znaczne zużycie energii elektrycznej, zmniejszając tym samym sprawność całkowitą urządzenia. System jest energochłonny, ponieważ nie ma dostatecznej izolacji termicznej przegród pieca oddzielających część produkcyjną (tunel grzewczy), ponadto nie jest wyposażony w system odzysku ciepła energii w postaci odzysku ciepła z powietrza wtórnego obiegu i tym samym wymaga ciągłej pracy grzałek elektrycznych o dużej mocy elektrycznej, co wynika z wykonanych pomiarów. Silniki elektryczne, taśmy podawcze są w znacznym stopniu wyeksploatowane, a same urządzenie zużyło się technologicznie. Projekt przyczynia się do rozwiązania wszystkich zdiagnozowanych problemów kluczowych interesariuszy w obszarze objętym projektem. Projekt rozpoczął się w I kwartale 2018 r. a zakończą w IV kwartale 2019r. Projekt będzie realizowany w jednym etapie. Harmonogram prac zapewni realizację projektu w ciągu 1 roku od podpisania umowy o dofinansowanie. Projekt wpisuje się w założenia w SzOOP RPO WiM 2014-2020 poprzez poprawę efektywności energetycznej w przedsiębiorstwie. Cel projektu wpisuje się bezpośrednio w cel poddziałania 4.2 "Zwiększona efektywność energetyczna w przedsiębiorstwach". Spółka dzięki przeprowadzeniu modernizacji linii zaoszczędzi szacunkowo 71 786,72 kWh energii finalnej rocznie, natomiast uniknięta emisja CO2 wyniesie 24,969 MgCO2. (Polish)
0 references
The project consists of the modernisation of the production line in the company Ivory sp. z o.o., which consists of replacing the existing tunnel kiln for decoration with ceramics and glass for a new device with better technical parameters with recovery of technological heat and less demand for electricity. The efficiency of the electric kiln currently used for decoration is low, as the hydraulic system and the control system forces the continuous operation of electric motors, and the low insulation of the furnace partitions forces additional work of electric heaters, which results in significant electricity consumption, thus reducing the total efficiency of the device. The system is energy-intensive because there is not sufficient thermal insulation of the furnace partitions separating the production part (heating tunnel), in addition it is not equipped with a heat recovery system in the form of heat recovery from secondary circulation air and therefore requires continuous operation of high-power electric heaters, resulting from measurements made. Electric motors, conveyor belts are largely exploited, and the device itself has used up technology. The project contributes to solving all identified key stakeholders’ problems in the project area. The project started in the first quarter of 2018 and will be completed in the fourth quarter of 2019. The project will be implemented in one stage. The work schedule will ensure the implementation of the project within 1 from the signing of the co-financing agreement. The project fits into the assumptions of the SzOOP RPO WiM 2014-2020 by improving the energy efficiency of the company. The objective of the project is directly in line with the objective of sub-measure 4.2 ‘Energy energy efficiency in enterprises’. Thanks to the modernisation of the line, the company will save an estimated 71786.72 kWh of final energy per year, while the avoided CO2 emissions will amount to 24.969 MgCO2. (English)
21 October 2020
0 references
Identifiers
RPWM.04.02.00-28-0076/18
0 references