Improving the energy efficiency of PHU IR-MAR s.c (Q132206): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The main objective of the project: “Improvement of the energy efficiency of PHU IR-MAR s.c” is to achieve the best environmental parameters. Poland, as a Member State of the EU, is required to pursue the best possible environmental parameters (reductions in greenhouse gases, suspended particulates, restrictions on the use of raw materials). It is therefore important to take preventive action today. The project takes into account the following...)
(‎Created claim: summary (P836): The main objective of the project “Improving the energy efficiency of PHU IR-MAR s.c” is to achieve the best environmental parameters possible. As an EU Member State, Poland is obliged to achieve the best environmental parameters (reducing greenhouse gas emissions, particulate matter, reducing the consumption of natural resources). It is therefore important to take preventive action today. The project takes into account the following scope of mo...)
Property / summary
 
The main objective of the project “Improving the energy efficiency of PHU IR-MAR s.c” is to achieve the best environmental parameters possible. As an EU Member State, Poland is obliged to achieve the best environmental parameters (reducing greenhouse gas emissions, particulate matter, reducing the consumption of natural resources). It is therefore important to take preventive action today. The project takes into account the following scope of modernisation work: • modernisation of the CO system with heat exchange • modernisation of the CWU system, • modernisation of the lighting system, • modernisation of the ventilation system • replacement of the convection and steam furnace • modernisation of the power installation (assembly of photovoltaic panels with a power of 27.06 kW). The project fits into the assumption specified in the SzOOP RPO WiM for 4. Priority axis: — Renewable energy consumption index – 95.92 %, – Increased energy efficiency – 60.09 %, – CO2-91.48 % reduction, – avoided CO2-21.103 Mg/year emissions. Thus, the project creates a list of direct result indicators presented by the Shoop, which we can include: — production of electricity from newly built RES installations – 29,602 MWhe/year, – production of heat from newly built RES installations – 39,98 MWht/year, – the amount of electricity saved – 9,57 MWh/year, – the amount of thermal energy saved – 47,87 GJ/year. The implementation of the new technology will reduce final energy from 344.17 GJ/year to 137.37 GJ/year. The maintenance costs of the facility in the existing state amount to PLN 35 342.29, after modernisation will amount to PLN 2 703.85. (English)
Property / summary: The main objective of the project “Improving the energy efficiency of PHU IR-MAR s.c” is to achieve the best environmental parameters possible. As an EU Member State, Poland is obliged to achieve the best environmental parameters (reducing greenhouse gas emissions, particulate matter, reducing the consumption of natural resources). It is therefore important to take preventive action today. The project takes into account the following scope of modernisation work: • modernisation of the CO system with heat exchange • modernisation of the CWU system, • modernisation of the lighting system, • modernisation of the ventilation system • replacement of the convection and steam furnace • modernisation of the power installation (assembly of photovoltaic panels with a power of 27.06 kW). The project fits into the assumption specified in the SzOOP RPO WiM for 4. Priority axis: — Renewable energy consumption index – 95.92 %, – Increased energy efficiency – 60.09 %, – CO2-91.48 % reduction, – avoided CO2-21.103 Mg/year emissions. Thus, the project creates a list of direct result indicators presented by the Shoop, which we can include: — production of electricity from newly built RES installations – 29,602 MWhe/year, – production of heat from newly built RES installations – 39,98 MWht/year, – the amount of electricity saved – 9,57 MWh/year, – the amount of thermal energy saved – 47,87 GJ/year. The implementation of the new technology will reduce final energy from 344.17 GJ/year to 137.37 GJ/year. The maintenance costs of the facility in the existing state amount to PLN 35 342.29, after modernisation will amount to PLN 2 703.85. (English) / rank
 
Normal rank
Property / summary: The main objective of the project “Improving the energy efficiency of PHU IR-MAR s.c” is to achieve the best environmental parameters possible. As an EU Member State, Poland is obliged to achieve the best environmental parameters (reducing greenhouse gas emissions, particulate matter, reducing the consumption of natural resources). It is therefore important to take preventive action today. The project takes into account the following scope of modernisation work: • modernisation of the CO system with heat exchange • modernisation of the CWU system, • modernisation of the lighting system, • modernisation of the ventilation system • replacement of the convection and steam furnace • modernisation of the power installation (assembly of photovoltaic panels with a power of 27.06 kW). The project fits into the assumption specified in the SzOOP RPO WiM for 4. Priority axis: — Renewable energy consumption index – 95.92 %, – Increased energy efficiency – 60.09 %, – CO2-91.48 % reduction, – avoided CO2-21.103 Mg/year emissions. Thus, the project creates a list of direct result indicators presented by the Shoop, which we can include: — production of electricity from newly built RES installations – 29,602 MWhe/year, – production of heat from newly built RES installations – 39,98 MWht/year, – the amount of electricity saved – 9,57 MWh/year, – the amount of thermal energy saved – 47,87 GJ/year. The implementation of the new technology will reduce final energy from 344.17 GJ/year to 137.37 GJ/year. The maintenance costs of the facility in the existing state amount to PLN 35 342.29, after modernisation will amount to PLN 2 703.85. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:59, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the energy efficiency of PHU IR-MAR s.c
Project in Poland financed by DG Regio

    Statements

    0 references
    532,957.11 zloty
    0 references
    127,909.71 Euro
    13 January 2020
    0 references
    627,008.36 zloty
    0 references
    150,482.01 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 June 2018
    0 references
    31 March 2020
    0 references
    PRZEDSIĘBIORSTWO HANDLOWO USŁUGOWE IR-MAR S.C
    0 references
    0 references

    54°4'56.6"N, 21°21'54.7"E
    0 references
    Głównym celem projektu pt. „Poprawa efektywności energetycznej przedsiębiorstwa PHU IR-MAR s.c" jest osiągnięcie jak najlepszych parametrów środowiskowych. Polska jako kraj członkowski UE jest zobligowana do dążenia osiągnięcia jak najlepszych parametrów środowiskowych (zmniejszenia emisji gazów cieplarnianych, pyłów zawieszonych, ograniczenia zużycia surowców naturalnych). Dlatego istotną rzeczą jest już dziś podjęcie działań zapobiegawczych. W projekcie uwzględniono następujący zakres prac modernizacyjnych: • modernizacja instalacji CO wraz z wymianą źródła ciepła • modernizacja instalacji CWU, • modernizacja instalacji oświetlenia, • modernizacja systemu wentylacji • wymiana pieca konwekcyjno-parowego • modernizacja instalacji elektroenergetycznej (montaż paneli fotowoltaicznych o mocy 27,06 kW). Projekt wpisuje się w założenia określonej w SzOOP RPO WiM dla 4. Osi Priorytetowej: - Wskaźnik wykorzystania energii odnawialnej – 95,92 %, - Zwiększona efektywność energetyczna – 60,09%, - Redukcja CO2 – 91,48%, - Uniknięta emisja zanieczyszczeń CO2 – 21,103 Mg/rok. Tym samym projekt kreuje listę wskaźniki rezultatu bezpośredniego, którą prezentuje SzOOP, do której możemy zaliczyć: - produkcję energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE – 29,602 MWhe/rok, - produkcję energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE – 39,98 MWht/rok, - ilość zaoszczędzonej energii elektrycznej – 9,57 MWh/rok, - ilość zaoszczędzonej energii cieplnej – 47,87 GJ/rok. Dzięki wdrożeniu nowej technologii zmniejszeniu ulegnie energia końcowa z 344,17 GJ/rok do poziomu 137,37 GJ/rok. Koszty utrzymania obiektu w stanie istniejącym wynoszą 35 342,29 zł, po modernizacji będą wynosić 2 703,85zł. (Polish)
    0 references
    The main objective of the project “Improving the energy efficiency of PHU IR-MAR s.c” is to achieve the best environmental parameters possible. As an EU Member State, Poland is obliged to achieve the best environmental parameters (reducing greenhouse gas emissions, particulate matter, reducing the consumption of natural resources). It is therefore important to take preventive action today. The project takes into account the following scope of modernisation work: • modernisation of the CO system with heat exchange • modernisation of the CWU system, • modernisation of the lighting system, • modernisation of the ventilation system • replacement of the convection and steam furnace • modernisation of the power installation (assembly of photovoltaic panels with a power of 27.06 kW). The project fits into the assumption specified in the SzOOP RPO WiM for 4. Priority axis: — Renewable energy consumption index – 95.92 %, – Increased energy efficiency – 60.09 %, – CO2-91.48 % reduction, – avoided CO2-21.103 Mg/year emissions. Thus, the project creates a list of direct result indicators presented by the Shoop, which we can include: — production of electricity from newly built RES installations – 29,602 MWhe/year, – production of heat from newly built RES installations – 39,98 MWht/year, – the amount of electricity saved – 9,57 MWh/year, – the amount of thermal energy saved – 47,87 GJ/year. The implementation of the new technology will reduce final energy from 344.17 GJ/year to 137.37 GJ/year. The maintenance costs of the facility in the existing state amount to PLN 35 342.29, after modernisation will amount to PLN 2 703.85. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.02.00-28-0065/18
    0 references