(Removed claim: summary (P836): The purpose of the investment is to extend the section of the ‘G’ class of road (ul. Klechev — part of the provincial road 264) from the planned roundabout at the intersection of Konin at the border of Konin to the junction with ul. Hostage/Szymanowski, long 2.086 km (including 0.642 km following the new footprint), together with an accompanying infrastructure. The scope of the investment includes, inter alia, the following: — carriageway of p...) |
(Created claim: summary (P836): The subject of the investment is the extension of the section of the G class road (ul. Kleczewska – a fragment of the Voivodeship Road 264) from the design roundabout according to a separate study on the border of the city of Konin to the intersection with ul. Szymanowski’s company, d. 2.086 km (including 0.642 km after the new track), along with accompanying infrastructure. The scope of the investment includes, among others, — the road of the v...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the investment is the extension of the section of the G class road (ul. Kleczewska – a fragment of the Voivodeship Road 264) from the design roundabout according to a separate study on the border of the city of Konin to the intersection with ul. Szymanowski’s company, d. 2.086 km (including 0.642 km after the new track), along with accompanying infrastructure. The scope of the investment includes, among others, — the road of the voivodeship road No. 264 with bituminous surface with a capacity of 115 kN/axis, – extension of the section of ul. Paderewski (lit. 0.217 km – to the extent necessary for the implementation of the investment – extension of ul. Kleczewska), – construction of additional roadways, – reconstruction and construction: intersections, b) pavements, c) cycle paths, d) bus bays, e) parking places, f) exits, g) culverts, h) road lighting, – construction of rainwater drainage, – construction of road safety equipment, – reconstruction or protection of interfering foreign devices, – cutting and planting of greenery. Dehydration will be done by means of designed rainwater drainage and partly road ditches. The planned extension of the road will improve transport conditions, improve traffic along the voivodship road through segregation of main and access road traffic to adjacent properties as well as separation of pedestrian and bicycle traffic. The solutions used will increase road safety. Products (2020 year): Length of reconstructed voivodship roads 1.444 km Length of built voivodship roads 0.642 km Length of supported bicycle infrastructure 1.697 km Length of built or reconstructed walkways 4.637 km Number of built or reconstructed lighting points 198 pieces. Number of intersections built or reconstructed 7 pieces. Number of bus bays built or reconstructed 7 pcs. (English) | |||||||||||||||
Property / summary: The subject of the investment is the extension of the section of the G class road (ul. Kleczewska – a fragment of the Voivodeship Road 264) from the design roundabout according to a separate study on the border of the city of Konin to the intersection with ul. Szymanowski’s company, d. 2.086 km (including 0.642 km after the new track), along with accompanying infrastructure. The scope of the investment includes, among others, — the road of the voivodeship road No. 264 with bituminous surface with a capacity of 115 kN/axis, – extension of the section of ul. Paderewski (lit. 0.217 km – to the extent necessary for the implementation of the investment – extension of ul. Kleczewska), – construction of additional roadways, – reconstruction and construction: intersections, b) pavements, c) cycle paths, d) bus bays, e) parking places, f) exits, g) culverts, h) road lighting, – construction of rainwater drainage, – construction of road safety equipment, – reconstruction or protection of interfering foreign devices, – cutting and planting of greenery. Dehydration will be done by means of designed rainwater drainage and partly road ditches. The planned extension of the road will improve transport conditions, improve traffic along the voivodship road through segregation of main and access road traffic to adjacent properties as well as separation of pedestrian and bicycle traffic. The solutions used will increase road safety. Products (2020 year): Length of reconstructed voivodship roads 1.444 km Length of built voivodship roads 0.642 km Length of supported bicycle infrastructure 1.697 km Length of built or reconstructed walkways 4.637 km Number of built or reconstructed lighting points 198 pieces. Number of intersections built or reconstructed 7 pieces. Number of bus bays built or reconstructed 7 pcs. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the investment is the extension of the section of the G class road (ul. Kleczewska – a fragment of the Voivodeship Road 264) from the design roundabout according to a separate study on the border of the city of Konin to the intersection with ul. Szymanowski’s company, d. 2.086 km (including 0.642 km after the new track), along with accompanying infrastructure. The scope of the investment includes, among others, — the road of the voivodeship road No. 264 with bituminous surface with a capacity of 115 kN/axis, – extension of the section of ul. Paderewski (lit. 0.217 km – to the extent necessary for the implementation of the investment – extension of ul. Kleczewska), – construction of additional roadways, – reconstruction and construction: intersections, b) pavements, c) cycle paths, d) bus bays, e) parking places, f) exits, g) culverts, h) road lighting, – construction of rainwater drainage, – construction of road safety equipment, – reconstruction or protection of interfering foreign devices, – cutting and planting of greenery. Dehydration will be done by means of designed rainwater drainage and partly road ditches. The planned extension of the road will improve transport conditions, improve traffic along the voivodship road through segregation of main and access road traffic to adjacent properties as well as separation of pedestrian and bicycle traffic. The solutions used will increase road safety. Products (2020 year): Length of reconstructed voivodship roads 1.444 km Length of built voivodship roads 0.642 km Length of supported bicycle infrastructure 1.697 km Length of built or reconstructed walkways 4.637 km Number of built or reconstructed lighting points 198 pieces. Number of intersections built or reconstructed 7 pieces. Number of bus bays built or reconstructed 7 pcs. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 16:40, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of Klechev street in Konin |
Project in Poland financed by DG Regio |
Statements
29,622,670.85 zloty
0 references
44,259,182.52 zloty
0 references
66.93 percent
0 references
30 August 2018
0 references
30 December 2020
0 references
MIASTO KONIN
0 references
Przedmiotem inwestycji jest rozbudowa odcinka drogi klasy G (ul. Kleczewska – fragment drogi wojewódzkiej 264) od projektowanego ronda wg odrębnego opracowania na granicy miasta Konin do skrzyżowania z ul. Zakładową/Szymanowskiego, dł. 2,086 km (w tym 0,642 km po nowym śladzie) , wraz z infrastrukturą towarzyszącą. Zakres inwestycji obejmuje m.in. - jezdnię drogi wojewódzkiej nr 264 o nawierzchni bitumicznej o nośności 115 kN/oś, - rozbudowę odcinka ul. Paderewskiego (dł. 0,217 km - w zakresie niezbędnym do realizacji przedmiotowej inwestycji - rozbudowy ul. Kleczewskiej), - budowę dodatkowych jezdni, - przebudowę i budowę: a) skrzyżowań, b) chodników, c) ścieżek rowerowych, d) zatok autobusowych, e) miejsc postojowych, f) zjazdów, g) przepustów, h) oświetlenia drogowego, - budowę kanalizacji deszczowej, - budowę urządzeń bezpieczeństwa ruchu drogowego, - przebudowę lub zabezpieczenie kolidujących urządzeń obcych, - wycinkę oraz nasadzenia zieleni. Odwodnienie odbywać będzie się za pomocą projektowanej kanalizacji deszczowej oraz częściowo rowów drogowych. Projektowana rozbudowa drogi polepszy warunki komunikacyjne, usprawni ruch w ciągu drogi wojewódzkiej poprzez segregację ruchu samochodowego głównego i dojazdowego do przyległych posesji jak również wydzielenie ruchu pieszego i rowerowego. Zastosowane rozwiązania przyczynią się do zwiększenia bezpieczeństwa ruchu drogowego. Produkty (rok 2020): Długość przebudowanych dróg wojewódzkich 1,444 km Długość wybudowanych dróg wojewódzkich 0,642 km Długość wspartej infrastruktury rowerowej 1,697 km Długość wybudowanych lub przebudowanych chodników 4,637 km Liczba wybudowanych lub przebudowanych punktów oświetleniowych 198 szt. Liczba wybudowanych lub przebudowanych skrzyżowań 7 szt. Liczba wybudowanych lub przebudowanych zatok autobusowych 7 szt. (Polish)
0 references
The subject of the investment is the extension of the section of the G class road (ul. Kleczewska – a fragment of the Voivodeship Road 264) from the design roundabout according to a separate study on the border of the city of Konin to the intersection with ul. Szymanowski’s company, d. 2.086 km (including 0.642 km after the new track), along with accompanying infrastructure. The scope of the investment includes, among others, — the road of the voivodeship road No. 264 with bituminous surface with a capacity of 115 kN/axis, – extension of the section of ul. Paderewski (lit. 0.217 km – to the extent necessary for the implementation of the investment – extension of ul. Kleczewska), – construction of additional roadways, – reconstruction and construction: intersections, b) pavements, c) cycle paths, d) bus bays, e) parking places, f) exits, g) culverts, h) road lighting, – construction of rainwater drainage, – construction of road safety equipment, – reconstruction or protection of interfering foreign devices, – cutting and planting of greenery. Dehydration will be done by means of designed rainwater drainage and partly road ditches. The planned extension of the road will improve transport conditions, improve traffic along the voivodship road through segregation of main and access road traffic to adjacent properties as well as separation of pedestrian and bicycle traffic. The solutions used will increase road safety. Products (2020 year): Length of reconstructed voivodship roads 1.444 km Length of built voivodship roads 0.642 km Length of supported bicycle infrastructure 1.697 km Length of built or reconstructed walkways 4.637 km Number of built or reconstructed lighting points 198 pieces. Number of intersections built or reconstructed 7 pieces. Number of bus bays built or reconstructed 7 pcs. (English)
21 October 2020
0 references
Identifiers
RPWP.05.01.01-30-0017/17
0 references