(Removed claim: summary (P836): The investment planned for the implementation of the investment is linked to the construction of the energy generation from the sun. Power design power of the solar plant on 2/8 The Podforest, city of Dobre, is 999.9 kW. The electricity produced by the plant will be supplied to the electricity network SN 15 kV — ENERGA Operator SA via a transformer station n/SN. For the purpose of accounting for the reception of electricity, a measuring and bi...) |
(Created claim: summary (P836): The planned investment is connected with the construction of a RES installation producing energy from the sun. Power of the design solar power plant on plot 2/8 r. Podeśna, gm. Good City, is 999.9 kW. The electricity produced by the power plant will be supplied to the power grid SN 15 kV – ENERGA Operator SA via the nn/SN transformer station followed by the SN cable line. The measurement and settlement system on the SN side of the transformer wi...) |
||||||||||||||
Property / summary | |||||||||||||||
The planned investment is connected with the construction of a RES installation producing energy from the sun. Power of the design solar power plant on plot 2/8 r. Podeśna, gm. Good City, is 999.9 kW. The electricity produced by the power plant will be supplied to the power grid SN 15 kV – ENERGA Operator SA via the nn/SN transformer station followed by the SN cable line. The measurement and settlement system on the SN side of the transformer will be built in order to settle the electricity collection. The installation is expected to produce electricity at the level of: 1017 MWh/y. All energy will be for sale. The investment is planned to be carried out entirely on land used agriculturally defined in the register of land and buildings as Class V and VI. The nearest building is located at a distance of approx. 170 m to the south-east of the border (the fence) of the planned photovoltaic farm. The installation will consist of the following elements: • Photovoltaic modules in the amount of 3636 pcs. (275 In each) and total electrical power of 999.9 kW, • Support structure of photovoltaic panels – two-support, type Corab WS007 • Inverters (inverters) in the amount of 22 pieces, • Technical building which includes transformer station nn/SN with transformer, control room with electrical devices and energy meters, • Low and medium voltage terrestrial wiring system and teleinformation network (English) | |||||||||||||||
Property / summary: The planned investment is connected with the construction of a RES installation producing energy from the sun. Power of the design solar power plant on plot 2/8 r. Podeśna, gm. Good City, is 999.9 kW. The electricity produced by the power plant will be supplied to the power grid SN 15 kV – ENERGA Operator SA via the nn/SN transformer station followed by the SN cable line. The measurement and settlement system on the SN side of the transformer will be built in order to settle the electricity collection. The installation is expected to produce electricity at the level of: 1017 MWh/y. All energy will be for sale. The investment is planned to be carried out entirely on land used agriculturally defined in the register of land and buildings as Class V and VI. The nearest building is located at a distance of approx. 170 m to the south-east of the border (the fence) of the planned photovoltaic farm. The installation will consist of the following elements: • Photovoltaic modules in the amount of 3636 pcs. (275 In each) and total electrical power of 999.9 kW, • Support structure of photovoltaic panels – two-support, type Corab WS007 • Inverters (inverters) in the amount of 22 pieces, • Technical building which includes transformer station nn/SN with transformer, control room with electrical devices and energy meters, • Low and medium voltage terrestrial wiring system and teleinformation network (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The planned investment is connected with the construction of a RES installation producing energy from the sun. Power of the design solar power plant on plot 2/8 r. Podeśna, gm. Good City, is 999.9 kW. The electricity produced by the power plant will be supplied to the power grid SN 15 kV – ENERGA Operator SA via the nn/SN transformer station followed by the SN cable line. The measurement and settlement system on the SN side of the transformer will be built in order to settle the electricity collection. The installation is expected to produce electricity at the level of: 1017 MWh/y. All energy will be for sale. The investment is planned to be carried out entirely on land used agriculturally defined in the register of land and buildings as Class V and VI. The nearest building is located at a distance of approx. 170 m to the south-east of the border (the fence) of the planned photovoltaic farm. The installation will consist of the following elements: • Photovoltaic modules in the amount of 3636 pcs. (275 In each) and total electrical power of 999.9 kW, • Support structure of photovoltaic panels – two-support, type Corab WS007 • Inverters (inverters) in the amount of 22 pieces, • Technical building which includes transformer station nn/SN with transformer, control room with electrical devices and energy meters, • Low and medium voltage terrestrial wiring system and teleinformation network (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 16:34, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a 1 MW “Good City I” photovoltaic farm |
Project in Poland financed by DG Regio |
Statements
1,984,010.93 zloty
0 references
2,480,013.66 zloty
0 references
80.0 percent
0 references
16 November 2018
0 references
11 March 2019
0 references
PV DOBRE MIASTO SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Planowana do realizacji inwestycja związana jest z budową instalacji OZE produkującej energię ze słońca. Moc projektowej elektrowni słonecznej na działce 2/8 obr. Podleśna, gm. Dobre Miasto, wynosi 999,9 kW. Energia elektryczna produkowana przez elektrownię będzie dostarczana do sieci energetycznej SN 15 kV - ENERGA Operator SA poprzez stację transformatorową nn/SN następnie linię kablową SN. W celu rozliczenia odbioru energii elektrycznej zostanie zabudowany układ pomiarowo-rozliczeniowy po stronie SN transformatora. Przewiduje się, że instalacja będzie produkowała energię elektryczną na poziomie: 1 017 MWh/r. Całość energii kierowana będzie na sprzedaż. Inwestycję zaplanowano do realizacji w całości na gruntach użytkowanych rolniczo określonych w ewidencji gruntów i budynków jako klasy V i VI. Najbliższa zabudowa położona jest w odległości ok. 170 m na południowy-wschód od granicy (ogrodzenia) planowanej farmy fotowoltaicznej. Instalacja złożona będzie z następujących elementów: • Moduły fotowoltaiczne w ilości 3636 szt. (275 W każdy) i łącznej mocy elektrycznej 999,9 kW, • Konstrukcja wsporcza paneli fotowoltaicznych - dwupodporowa, typu Corab WS007 • Falowniki (inwertery) w ilości 22 szt., • Budynek techniczny w skład którego wejdzie stacja transformatorowa nn/SN z transformatorem, pomieszczenie sterowni z urządzeniami elektro-energetycznymi i licznikami energii, • Okablowanie niskiego i średniego napięcia oraz sieć teleinformacyjna, • Ogrodzenie terenu farmy, • System monitoringu wizyjnego oraz światłowód sensoryczny zamontowany na ogrodzeniu, • System Net-Eco – zdalnego zarządzania farmą fotowoltaiczną • Przyłącze do sieci elektro-energetycznej, • Układ pomiarowo-rozliczeniowego na napięciu 15 kV, (Polish)
0 references
The planned investment is connected with the construction of a RES installation producing energy from the sun. Power of the design solar power plant on plot 2/8 r. Podeśna, gm. Good City, is 999.9 kW. The electricity produced by the power plant will be supplied to the power grid SN 15 kV – ENERGA Operator SA via the nn/SN transformer station followed by the SN cable line. The measurement and settlement system on the SN side of the transformer will be built in order to settle the electricity collection. The installation is expected to produce electricity at the level of: 1017 MWh/y. All energy will be for sale. The investment is planned to be carried out entirely on land used agriculturally defined in the register of land and buildings as Class V and VI. The nearest building is located at a distance of approx. 170 m to the south-east of the border (the fence) of the planned photovoltaic farm. The installation will consist of the following elements: • Photovoltaic modules in the amount of 3636 pcs. (275 In each) and total electrical power of 999.9 kW, • Support structure of photovoltaic panels – two-support, type Corab WS007 • Inverters (inverters) in the amount of 22 pieces, • Technical building which includes transformer station nn/SN with transformer, control room with electrical devices and energy meters, • Low and medium voltage terrestrial wiring system and teleinformation network (English)
21 October 2020
0 references
Identifiers
RPWM.04.01.00-28-0339/16
0 references