(‎Removed claim: summary (P836): The investment consists of the purchase and assembly in m. Olecko, rim 0002, unit number. 265/5, 266/2, 265/3: — 63KW and 18,27-kW solar photovoltaic installations with 2 inverters, the necessary wiring and fittings. PV panels are used by photovoltaic panels to process radiation to en. electrons. With cable connections, they transmit energy to inverters where alternating current into variable current will be connected to the grid, but due to t...)
(‎Created claim: summary (P836): The investment consists of buying and assembling in Olecko, part 0002, no. 265/5, 266/2, 265/3: — photovoltaic roofing system-63panels (monocrystalline) with a power of 18.27 kW with 2 inverters, necessary wiring and accessories. PV panels use photovolts to convert radiation into en. electr. By means of cable connections, they transfer energy to inverters, where the direct current changes to alternating current, the inst. will be connected to th...)
Property / summary
 
The investment consists of buying and assembling in Olecko, part 0002, no. 265/5, 266/2, 265/3: — photovoltaic roofing system-63panels (monocrystalline) with a power of 18.27 kW with 2 inverters, necessary wiring and accessories. PV panels use photovolts to convert radiation into en. electr. By means of cable connections, they transfer energy to inverters, where the direct current changes to alternating current, the inst. will be connected to the grid, however due to the power of inst. photovolt. (up to 40 kW) according to Article 5 paragraph on renewable energy sources (Journal of Laws 2015 item. 478) and Art. 7 para.8d with stamp 4-9 of the Energy Law (Journal of Laws OJ 1997 No 54, item. 348) they will be made on the basis of the notification without the need for the benef. to have valid techn. conditions for connection to the network. Production. en. will be used for your own needs and any surplus will be uploaded to the network. There will be no need to install batteries and charge regulators, as the network is able to accept the entire driveway. en. The applicant currently has connections where the contractual capacity is 26 kW.The project will be completed within 1 year of signing the grant agreement.As a detailed subdivision. 4.1 indicated: Increased share of renewable energy sources in the overall energy balance of the region. As part of the project, the applicant will launch a new photovoltaic electric electricity for the production of electricity with an annual productivity of 12,14 MWh. In this way, the electricity produced will certainly increase the share of renewable energy sources in the overall energy balance by 12.14 MWh/year. The project meets all the shore conditions specified in the Shoop. After receiving the grant and signing the contract with the contractor will be the purchase and assembly of a photovoltaic installation (according to the project documentation) and the achievement of planned project indicators. (English)
Property / summary: The investment consists of buying and assembling in Olecko, part 0002, no. 265/5, 266/2, 265/3: — photovoltaic roofing system-63panels (monocrystalline) with a power of 18.27 kW with 2 inverters, necessary wiring and accessories. PV panels use photovolts to convert radiation into en. electr. By means of cable connections, they transfer energy to inverters, where the direct current changes to alternating current, the inst. will be connected to the grid, however due to the power of inst. photovolt. (up to 40 kW) according to Article 5 paragraph on renewable energy sources (Journal of Laws 2015 item. 478) and Art. 7 para.8d with stamp 4-9 of the Energy Law (Journal of Laws OJ 1997 No 54, item. 348) they will be made on the basis of the notification without the need for the benef. to have valid techn. conditions for connection to the network. Production. en. will be used for your own needs and any surplus will be uploaded to the network. There will be no need to install batteries and charge regulators, as the network is able to accept the entire driveway. en. The applicant currently has connections where the contractual capacity is 26 kW.The project will be completed within 1 year of signing the grant agreement.As a detailed subdivision. 4.1 indicated: Increased share of renewable energy sources in the overall energy balance of the region. As part of the project, the applicant will launch a new photovoltaic electric electricity for the production of electricity with an annual productivity of 12,14 MWh. In this way, the electricity produced will certainly increase the share of renewable energy sources in the overall energy balance by 12.14 MWh/year. The project meets all the shore conditions specified in the Shoop. After receiving the grant and signing the contract with the contractor will be the purchase and assembly of a photovoltaic installation (according to the project documentation) and the achievement of planned project indicators. (English) / rank
 
Normal rank
Property / summary: The investment consists of buying and assembling in Olecko, part 0002, no. 265/5, 266/2, 265/3: — photovoltaic roofing system-63panels (monocrystalline) with a power of 18.27 kW with 2 inverters, necessary wiring and accessories. PV panels use photovolts to convert radiation into en. electr. By means of cable connections, they transfer energy to inverters, where the direct current changes to alternating current, the inst. will be connected to the grid, however due to the power of inst. photovolt. (up to 40 kW) according to Article 5 paragraph on renewable energy sources (Journal of Laws 2015 item. 478) and Art. 7 para.8d with stamp 4-9 of the Energy Law (Journal of Laws OJ 1997 No 54, item. 348) they will be made on the basis of the notification without the need for the benef. to have valid techn. conditions for connection to the network. Production. en. will be used for your own needs and any surplus will be uploaded to the network. There will be no need to install batteries and charge regulators, as the network is able to accept the entire driveway. en. The applicant currently has connections where the contractual capacity is 26 kW.The project will be completed within 1 year of signing the grant agreement.As a detailed subdivision. 4.1 indicated: Increased share of renewable energy sources in the overall energy balance of the region. As part of the project, the applicant will launch a new photovoltaic electric electricity for the production of electricity with an annual productivity of 12,14 MWh. In this way, the electricity produced will certainly increase the share of renewable energy sources in the overall energy balance by 12.14 MWh/year. The project meets all the shore conditions specified in the Shoop. After receiving the grant and signing the contract with the contractor will be the purchase and assembly of a photovoltaic installation (according to the project documentation) and the achievement of planned project indicators. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:28, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a photovoltaic micro-installation by Grzegorz Wiszniewski
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    88,400.0 zloty
    0 references
    21,216.0 Euro
    13 January 2020
    0 references
    104,000.0 zloty
    0 references
    24,960.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 April 2017
    0 references
    30 April 2020
    0 references
    PRZEDSIĘBIORSTWO USŁUGOWE GRZEGORZ WISZNIEWSKI
    0 references
    0 references

    54°2'20.8"N, 22°29'37.7"E
    0 references
    Inwestycja polega na zakupie i montażu w m. Olecko,obręb 0002, nr dział. 265/5, 266/2, 265/3: - instalacji fotowoltaicznej dachowej–63paneli (monokrystalicznych) o mocy 18,27 kW z 2 falownikami, niezbędnym okablowaniem i osprzętem. Panele PV wykorzystują zjawisko fotowolt. do przetwarzania promieniowania na en. elektr. Za pomocą połączeń kablowych przekazują one energię do falowników, gdzie następuje zmiana prądu stałego w prąd zmienny, inst. będzie podłączona do sieci, jednakże ze względu na moc inst. fotowolt. (do 40 kW) zgodnie z art. 5 ust. o odnawialnych źródłach energii (Dz.U. 2015 poz. 478) oraz art. 7 ust.8d ze znaczkiem 4-9 ustawy – Prawo energetyczne (Dz.U. Dz.U. 1997 nr 54 poz. 348) będą one dokonywane na podst. zgłoszenia bez konieczności posiadania przez benef. ważnych techn. warunków przyłączenia do sieci. Wyproduk. en. będzie wykorzyst. na potrzeby własne a ewentualna nadwyżka będzie wprowadzona do sieci. Nie będzie potrzeby instalowania akumulatorów oraz regulatorów ładowania, ponieważ sieć jest w stanie przyjąć całą wyprod. en. Wnioskodawca posiada obecnie przyłącza gdzie moc umowna wynosi 26 kW.Projekt zostanie zakończony w ciągu 1 roku od podpisania um. o dofinansowanie.Jako cel szczegółowy poddział. 4.1 wskazano: Zwiększony udział odnawialnych źród. energii w ogólnym bilansie energetycznym regionu. W ramach projektu Wnioskodawca uruchomi nową elektr. fotowoltaiczną do produkcji energii elektr. o rocznej produktywności 12,14 MWh. W ten sposób wyprodukowana energia elektr. z całą pewnością wpłynie na zwiększenie udziału odnawialnych źródeł energii w ogólnym bilansie energetycznym o 12,14MWh/rok. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP. Po otrzymaniu dotacji i podpisaniu umowy z wykonawcą będzie zakup i montaż instalacji fotowoltaicznej (zgodny z dokumentacją projektową) oraz osiągnięcie planowanych wskaźników projektu. (Polish)
    0 references
    The investment consists of buying and assembling in Olecko, part 0002, no. 265/5, 266/2, 265/3: — photovoltaic roofing system-63panels (monocrystalline) with a power of 18.27 kW with 2 inverters, necessary wiring and accessories. PV panels use photovolts to convert radiation into en. electr. By means of cable connections, they transfer energy to inverters, where the direct current changes to alternating current, the inst. will be connected to the grid, however due to the power of inst. photovolt. (up to 40 kW) according to Article 5 paragraph on renewable energy sources (Journal of Laws 2015 item. 478) and Art. 7 para.8d with stamp 4-9 of the Energy Law (Journal of Laws OJ 1997 No 54, item. 348) they will be made on the basis of the notification without the need for the benef. to have valid techn. conditions for connection to the network. Production. en. will be used for your own needs and any surplus will be uploaded to the network. There will be no need to install batteries and charge regulators, as the network is able to accept the entire driveway. en. The applicant currently has connections where the contractual capacity is 26 kW.The project will be completed within 1 year of signing the grant agreement.As a detailed subdivision. 4.1 indicated: Increased share of renewable energy sources in the overall energy balance of the region. As part of the project, the applicant will launch a new photovoltaic electric electricity for the production of electricity with an annual productivity of 12,14 MWh. In this way, the electricity produced will certainly increase the share of renewable energy sources in the overall energy balance by 12.14 MWh/year. The project meets all the shore conditions specified in the Shoop. After receiving the grant and signing the contract with the contractor will be the purchase and assembly of a photovoltaic installation (according to the project documentation) and the achievement of planned project indicators. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.01.00-28-0273/17
    0 references