Construction of the sanitary sewerage network in the villages of Aleskiniewo and Goskowo (Q135011): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The subject of the investment is the construction of a sewerage network with compressor pipeline and sewage pumping stations in the districts of Rozrynwo and Goskowo, in the agglomeration of Miejska Górka, as indicated in the 5th update of the NUWWTP, in the Radom district of Wlkp. The collected waste water from the mites and the Gook will be collected via a plunger by way of the land area of the Karlovy Vary region of Karolinki and Miejska Gó...) |
(Created claim: summary (P836): The subject of the investment is the construction of a sanitary sewer network, together with a pipeline and sewage pumping plants in Rozstępniewo and Gostkowo villages, in the Miejska Górka agglomeration indicated in the V update of KPOŚK, in the rawic district in wlkp. Collected wastewater from Rozpaniewo and Gostkowa will be drained by a pipeline through the plots of the geodesic area of Karolinka and Miejska Górka (also belonging to the agglo...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the investment is the construction of a sanitary sewer network, together with a pipeline and sewage pumping plants in Rozstępniewo and Gostkowo villages, in the Miejska Górka agglomeration indicated in the V update of KPOŚK, in the rawic district in wlkp. Collected wastewater from Rozpaniewo and Gostkowa will be drained by a pipeline through the plots of the geodesic area of Karolinka and Miejska Górka (also belonging to the agglomeration) to the existing sanitary sewage system in Municipal Górka. The final beneficiary of the project is the Municipality of Górka. The final beneficiaries to whom this project is addressed will be all residents of the municipality, for whom the implementation of the investment will mean improving the environment, increasing investment opportunities by arming new sites into a sewage network and developing rural areas of the municipality. Ultimately, the beneficiaries will also be residents of the region through which the Dąbroczna River flows and the entire water catchment area of the Oder River. As a result of the investment, the number of people operated by the projected sanitary sewer system will amount to 588.The projected construction of sanitary sewage system with sewers is designed to drain economic and household wastewater from households to the existing treatment plant in Karolinki. As part of the planned project, sewage pipelines with a total length of approx. 8.798 km, including the total length of planned sewage connections will be approx. It’s 0,868 miles. 7 sewage pumping plants are also planned.The area where the investment is planned, i.e. the construction of a sanitary sewer system in the towns Rozstępniewo and Gostkowo are: a strip of the district road, strips of communal roads, a strip of private road and a passage under the Dąbroczna riverbed. The route of the planned sewage network will be located in existing communication lines. Product index achieved in 2021:- Length of built sanitary sewage system – 8.798 km. (English) | |||||||||||||||
Property / summary: The subject of the investment is the construction of a sanitary sewer network, together with a pipeline and sewage pumping plants in Rozstępniewo and Gostkowo villages, in the Miejska Górka agglomeration indicated in the V update of KPOŚK, in the rawic district in wlkp. Collected wastewater from Rozpaniewo and Gostkowa will be drained by a pipeline through the plots of the geodesic area of Karolinka and Miejska Górka (also belonging to the agglomeration) to the existing sanitary sewage system in Municipal Górka. The final beneficiary of the project is the Municipality of Górka. The final beneficiaries to whom this project is addressed will be all residents of the municipality, for whom the implementation of the investment will mean improving the environment, increasing investment opportunities by arming new sites into a sewage network and developing rural areas of the municipality. Ultimately, the beneficiaries will also be residents of the region through which the Dąbroczna River flows and the entire water catchment area of the Oder River. As a result of the investment, the number of people operated by the projected sanitary sewer system will amount to 588.The projected construction of sanitary sewage system with sewers is designed to drain economic and household wastewater from households to the existing treatment plant in Karolinki. As part of the planned project, sewage pipelines with a total length of approx. 8.798 km, including the total length of planned sewage connections will be approx. It’s 0,868 miles. 7 sewage pumping plants are also planned.The area where the investment is planned, i.e. the construction of a sanitary sewer system in the towns Rozstępniewo and Gostkowo are: a strip of the district road, strips of communal roads, a strip of private road and a passage under the Dąbroczna riverbed. The route of the planned sewage network will be located in existing communication lines. Product index achieved in 2021:- Length of built sanitary sewage system – 8.798 km. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the investment is the construction of a sanitary sewer network, together with a pipeline and sewage pumping plants in Rozstępniewo and Gostkowo villages, in the Miejska Górka agglomeration indicated in the V update of KPOŚK, in the rawic district in wlkp. Collected wastewater from Rozpaniewo and Gostkowa will be drained by a pipeline through the plots of the geodesic area of Karolinka and Miejska Górka (also belonging to the agglomeration) to the existing sanitary sewage system in Municipal Górka. The final beneficiary of the project is the Municipality of Górka. The final beneficiaries to whom this project is addressed will be all residents of the municipality, for whom the implementation of the investment will mean improving the environment, increasing investment opportunities by arming new sites into a sewage network and developing rural areas of the municipality. Ultimately, the beneficiaries will also be residents of the region through which the Dąbroczna River flows and the entire water catchment area of the Oder River. As a result of the investment, the number of people operated by the projected sanitary sewer system will amount to 588.The projected construction of sanitary sewage system with sewers is designed to drain economic and household wastewater from households to the existing treatment plant in Karolinki. As part of the planned project, sewage pipelines with a total length of approx. 8.798 km, including the total length of planned sewage connections will be approx. It’s 0,868 miles. 7 sewage pumping plants are also planned.The area where the investment is planned, i.e. the construction of a sanitary sewer system in the towns Rozstępniewo and Gostkowo are: a strip of the district road, strips of communal roads, a strip of private road and a passage under the Dąbroczna riverbed. The route of the planned sewage network will be located in existing communication lines. Product index achieved in 2021:- Length of built sanitary sewage system – 8.798 km. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 16:18, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the sanitary sewerage network in the villages of Aleskiniewo and Goskowo |
Project in Poland financed by DG Regio |
Statements
3,637,502.75 zloty
0 references
4,279,415.0 zloty
0 references
85.0 percent
0 references
1 October 2019
0 references
31 May 2021
0 references
GMINA MIEJSKA GÓRKA
0 references
Przedmiotem inwestycji jest budowa sieci kanalizacji sanitarnej wraz z rurociągiem tłocznym i przepompowniami ścieków w miejscowościach Rozstępniewo i Gostkowo, w aglomeracji Miejska Górka wskazanej w V aktualizacji KPOŚK, w powiecie rawickim w woj. wlkp. Zebrane ścieki z Rozstępniewa i Gostkowa odprowadzane będą rurociągiem tłocznym poprzez działki obrębu geodezyjnego Karolinki i Miejska Górka (należące również do aglomeracji) do istniejącej kanalizacji sanitarnej w Miejskiej Górce. Beneficjentem końcowym projektu jest gmina Miejska Górka. Beneficjentami ostatecznymi do których skierowany jest niniejszy projekt, będą wszyscy mieszkańcy gminy, dla których realizacja inwestycji oznaczać będzie poprawę stanu środowiska naturalnego, zwiększenie możliwości inwestycyjnych poprzez uzbrojenie nowych terenów w sieć kanalizacyjną oraz rozwój obszarów wiejskich gminy. Docelowo beneficjentami będą także mieszkańcy regionu przez który przepływa rzeka Dąbroczna i całej zlewni rzeki Odry. W wyniku realizacji inwestycji liczba osób obsługiwanych przez projektowaną sieć kanalizacji sanitarnej wyniesie 588.Projektowana budowa kanalizacji sanitarnej z przykanalikami ma za zadanie odprowadzenie ścieków gospodarczo-bytowych z gospodarstw domowych do istniejącej oczyszczalni w Karolinkach. W ramach planowanego przedsięwzięcia przewiduje się ułożenie rurociągów kanalizacyjnych o łącznej długości ok. 8,798 km, w tym łączna długość planowanych przyłączy kanalizacyjnych wyniesie ok. 0,868 km. Planowane jest również wykonanie 7 przepompowni ścieków.Obszar, na którym planowana jest inwestycja, tj. budowa sieci kanalizacji sanitarnej w miejscowościach Rozstępniewo i Gostkowo stanowią: pas drogi powiatowej, pasy dróg gminnych, pas drogi prywatnej oraz przejście pod korytem rzeki Dąbroczna. Przebieg trasy planowanej sieci kanalizacyjnej zlokalizowany będzie w istniejących ciągach komunikacyjnych. Wskaźnik produktu osiągany w 2021 r.:- Długość wybudowanej kanalizacji sanitarnej - 8,798 km. (Polish)
0 references
The subject of the investment is the construction of a sanitary sewer network, together with a pipeline and sewage pumping plants in Rozstępniewo and Gostkowo villages, in the Miejska Górka agglomeration indicated in the V update of KPOŚK, in the rawic district in wlkp. Collected wastewater from Rozpaniewo and Gostkowa will be drained by a pipeline through the plots of the geodesic area of Karolinka and Miejska Górka (also belonging to the agglomeration) to the existing sanitary sewage system in Municipal Górka. The final beneficiary of the project is the Municipality of Górka. The final beneficiaries to whom this project is addressed will be all residents of the municipality, for whom the implementation of the investment will mean improving the environment, increasing investment opportunities by arming new sites into a sewage network and developing rural areas of the municipality. Ultimately, the beneficiaries will also be residents of the region through which the Dąbroczna River flows and the entire water catchment area of the Oder River. As a result of the investment, the number of people operated by the projected sanitary sewer system will amount to 588.The projected construction of sanitary sewage system with sewers is designed to drain economic and household wastewater from households to the existing treatment plant in Karolinki. As part of the planned project, sewage pipelines with a total length of approx. 8.798 km, including the total length of planned sewage connections will be approx. It’s 0,868 miles. 7 sewage pumping plants are also planned.The area where the investment is planned, i.e. the construction of a sanitary sewer system in the towns Rozstępniewo and Gostkowo are: a strip of the district road, strips of communal roads, a strip of private road and a passage under the Dąbroczna riverbed. The route of the planned sewage network will be located in existing communication lines. Product index achieved in 2021:- Length of built sanitary sewage system – 8.798 km. (English)
21 October 2020
0 references
Identifiers
RPWP.04.03.01-30-0004/18
0 references