(‎Removed claim: summary (P836): The investment consists of the purchase and installation of a micro-PV. The project is part of the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar installations (e.g. solar collectors, photovoltaic) — up to 2 MWe/MWth. Installations will serve specific needs and will be connected to the grid, but due to the power of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Act (Journal of La...)
(‎Created claim: summary (P836): The investment consists of the purchase and installation of photovoltaic micro-installations. The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for action 4.1 – solar energy installations (e.g. solar collectors, photovoltaics) – up to 2 MWe/MWth. Installations will serve their own needs and will be connected to the grid, however due to the capacity of the installation (up to 40 kW) in accordance with Article 5 of...)
Property / summary
 
The investment consists of the purchase and installation of photovoltaic micro-installations. The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for action 4.1 – solar energy installations (e.g. solar collectors, photovoltaics) – up to 2 MWe/MWth. Installations will serve their own needs and will be connected to the grid, however due to the capacity of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Sources Act (Journal of Laws 2015 item. 478) and Article 7. 8d with stamp 4-9 of the Act – Energy Law (Journal of Laws, Journal of Laws 1997 No. 54, item. 348. they will be made on the basis of a notification without the need for the beneficiary to have valid technical conditions for connection to the network. The applicant currently has connections where the contractual power is 20 kW. The project meets all the shore conditions specified in the Shoop. This project assumes the delivery and installation of a photovoltaic roof installation – 55 (polycrystalline) panels with a power of 16.22 kW with inverter (1 units with a power of 18 kW), necessary wiring and fittings in m. Olecko, ul. Noczniki 11, Dz. No. 1614/16. Pv panels use photovoltaic phenomena to convert solar radiation into electricity. By means of cable connections, they transmit energy to the inverter, where the direct current changes to alternating current. The power plant will be connected to the grid, but there will be no need to install batteries and charging regulators, as the network is able to absorb all the energy produced. The energy produced will be used for own use and any surplus will be put into the grid. The project will be completed within 1 from the signing of the grant agreement. The applicant has concluded an agreement with the social body on a local energy initiative aimed at promoting RES activities among residents. After the investment, the applicant’s photovoltaic system will be used for promotional purposes. (English)
Property / summary: The investment consists of the purchase and installation of photovoltaic micro-installations. The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for action 4.1 – solar energy installations (e.g. solar collectors, photovoltaics) – up to 2 MWe/MWth. Installations will serve their own needs and will be connected to the grid, however due to the capacity of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Sources Act (Journal of Laws 2015 item. 478) and Article 7. 8d with stamp 4-9 of the Act – Energy Law (Journal of Laws, Journal of Laws 1997 No. 54, item. 348. they will be made on the basis of a notification without the need for the beneficiary to have valid technical conditions for connection to the network. The applicant currently has connections where the contractual power is 20 kW. The project meets all the shore conditions specified in the Shoop. This project assumes the delivery and installation of a photovoltaic roof installation – 55 (polycrystalline) panels with a power of 16.22 kW with inverter (1 units with a power of 18 kW), necessary wiring and fittings in m. Olecko, ul. Noczniki 11, Dz. No. 1614/16. Pv panels use photovoltaic phenomena to convert solar radiation into electricity. By means of cable connections, they transmit energy to the inverter, where the direct current changes to alternating current. The power plant will be connected to the grid, but there will be no need to install batteries and charging regulators, as the network is able to absorb all the energy produced. The energy produced will be used for own use and any surplus will be put into the grid. The project will be completed within 1 from the signing of the grant agreement. The applicant has concluded an agreement with the social body on a local energy initiative aimed at promoting RES activities among residents. After the investment, the applicant’s photovoltaic system will be used for promotional purposes. (English) / rank
 
Normal rank
Property / summary: The investment consists of the purchase and installation of photovoltaic micro-installations. The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for action 4.1 – solar energy installations (e.g. solar collectors, photovoltaics) – up to 2 MWe/MWth. Installations will serve their own needs and will be connected to the grid, however due to the capacity of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Sources Act (Journal of Laws 2015 item. 478) and Article 7. 8d with stamp 4-9 of the Act – Energy Law (Journal of Laws, Journal of Laws 1997 No. 54, item. 348. they will be made on the basis of a notification without the need for the beneficiary to have valid technical conditions for connection to the network. The applicant currently has connections where the contractual power is 20 kW. The project meets all the shore conditions specified in the Shoop. This project assumes the delivery and installation of a photovoltaic roof installation – 55 (polycrystalline) panels with a power of 16.22 kW with inverter (1 units with a power of 18 kW), necessary wiring and fittings in m. Olecko, ul. Noczniki 11, Dz. No. 1614/16. Pv panels use photovoltaic phenomena to convert solar radiation into electricity. By means of cable connections, they transmit energy to the inverter, where the direct current changes to alternating current. The power plant will be connected to the grid, but there will be no need to install batteries and charging regulators, as the network is able to absorb all the energy produced. The energy produced will be used for own use and any surplus will be put into the grid. The project will be completed within 1 from the signing of the grant agreement. The applicant has concluded an agreement with the social body on a local energy initiative aimed at promoting RES activities among residents. After the investment, the applicant’s photovoltaic system will be used for promotional purposes. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:10, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a micro PV by “Wojciech Makowski and Bogusław Milewski” — Public company
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    88,995.0 zloty
    0 references
    21,358.8 Euro
    13 January 2020
    0 references
    104,700.0 zloty
    0 references
    25,128.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    21 March 2016
    0 references
    30 September 2017
    0 references
    "WOJCIECH MAKOWSKI I BOGUSŁAW MILEWSKI"-SPÓŁKA JAWNA
    0 references
    0 references

    54°2'20.8"N, 22°29'37.7"E
    0 references
    Inwestycja polega na zakupie i montażu mikroinstalacji fotowoltaicznej. Projekt wpisuje się w typ projektu wymieniony w SzOOP RPO WiM 2014-2020 dla działania 4.1 - instalacji wykorzystujących energię słońca (np. kolektory słoneczne, fotowoltaika) - do 2 MWe/MWth. Instalacje będą służyły potrzebom własnym i będą podłączone do sieci, jednakże ze względu na moc instalacji (do 40 kW) zgodnie z art. 5 ustawy o odnawialnych źródłach energii (Dz.U. 2015 poz. 478) oraz Art. 7 ust. 8d ze znaczkiem 4-9 ustawy – Prawo energetyczne (Dz.U. Dz.U. 1997 nr 54 poz. 348) będą one dokonywane na podstawie zgłoszenia bez konieczności posiadania przez beneficjenta ważnych technicznych warunków przyłączenia do sieci. Wnioskodawca posiada obecnie przyłącza gdzie moc umowna wynosi 20 kW. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP. Niniejszy projekt zakłada dostawę i montaż dachowej instalacji fotowoltaicznej- 55 paneli (polikrystalicznych) o mocy 16,22 kW z falownikiem (1 szt. o mocy 18kW), niezbędnym okablowaniem i osprzętem w m. Olecko, ul. Nocznickiego 11, dz. nr 1614/16. Panele pv wykorzystują zjawisko fotowoltaiczne do przetwarzania promieniowania słonecznego na energię elektryczną. Za pomocą połączeń kablowych przekazują one energię do falownika, gdzie następuje zmiana prądu stałego w prąd zmienny. Elektrownia będzie podłączona do sieci, natomiast nie będzie potrzeby instalowania akumulatorów oraz regulatorów ładowania, ponieważ sieć jest w stanie przyjąć całą wyprodukowaną energię. Wyprodukowana energia będzie wykorzystywana na potrzeby własne a ewentualna nadwyżka będzie wprowadzona do sieci. Projekt zostanie zakończony w ciągu 1 roku od podpisania um. o dofinansowanie. Wnioskodawca zawarł z podmiotem społecznym porozumienie w sprawie lokalnej inicjatywy energetycznej, mającej na celu popularyzację działań w zakresie OZE wśród mieszkańców. Po zrealizowaniu inwestycji system fotowoltaiczny wnioskodawcy będzie wykorzystywany w celach promocyjnych. (Polish)
    0 references
    The investment consists of the purchase and installation of photovoltaic micro-installations. The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for action 4.1 – solar energy installations (e.g. solar collectors, photovoltaics) – up to 2 MWe/MWth. Installations will serve their own needs and will be connected to the grid, however due to the capacity of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Sources Act (Journal of Laws 2015 item. 478) and Article 7. 8d with stamp 4-9 of the Act – Energy Law (Journal of Laws, Journal of Laws 1997 No. 54, item. 348. they will be made on the basis of a notification without the need for the beneficiary to have valid technical conditions for connection to the network. The applicant currently has connections where the contractual power is 20 kW. The project meets all the shore conditions specified in the Shoop. This project assumes the delivery and installation of a photovoltaic roof installation – 55 (polycrystalline) panels with a power of 16.22 kW with inverter (1 units with a power of 18 kW), necessary wiring and fittings in m. Olecko, ul. Noczniki 11, Dz. No. 1614/16. Pv panels use photovoltaic phenomena to convert solar radiation into electricity. By means of cable connections, they transmit energy to the inverter, where the direct current changes to alternating current. The power plant will be connected to the grid, but there will be no need to install batteries and charging regulators, as the network is able to absorb all the energy produced. The energy produced will be used for own use and any surplus will be put into the grid. The project will be completed within 1 from the signing of the grant agreement. The applicant has concluded an agreement with the social body on a local energy initiative aimed at promoting RES activities among residents. After the investment, the applicant’s photovoltaic system will be used for promotional purposes. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.01.00-28-0171/16
    0 references