Reconstruction of the sewage and water supply system — Agglomeration of Suchedów — Stage IV (Q127799): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The scope of the project involves the reconstruction of ul. Powstańców 1863 and ul. A short existing network of sanitary and water sewerage, existing water connections and sewage connections to the boundaries of the individual sessions and the construction of new water connections and the sanitary sewage system to unarmed parcels. For the implementation of the project: the necessary documentation (Study on feasibility studies) has been develop...)
(‎Created claim: summary (P836): The scope of the project includes reconstruction in ul. Insurgents in 1863 and in ul. A short existing sanitary and water supply network, existing water and sewerage connections to the boundaries of individual properties, and the construction of new water supply and sanitary sewerage to unarmed plots. For the implementation of the project: the necessary documentation (Feasibility Study) has been developed. The construction works will be supervis...)
Property / summary
 
The scope of the project includes reconstruction in ul. Insurgents in 1863 and in ul. A short existing sanitary and water supply network, existing water and sewerage connections to the boundaries of individual properties, and the construction of new water supply and sanitary sewerage to unarmed plots. For the implementation of the project: the necessary documentation (Feasibility Study) has been developed. The construction works will be supervised by investors, they will be purchased information boards about the funding. The project takes into account the costs of operating a bank account created for the implementation of the project. As a result of the project, the following product indicators will be achieved: Length of reconstructed sanitary sewage system 1.29 km (including main network 0.83 km, connections 0.46 km), length of reconstructed water supply network 1.34 km (including main network 0.75 km, connections 0.59 km) The project complies with the specific objectives for priority axis 4 ROP WŚ 2014-2020 and the objective of action 4.3 i.e. an increased percentage of the population using a sewage treatment system in accordance with the directive on municipal waste water. (English)
Property / summary: The scope of the project includes reconstruction in ul. Insurgents in 1863 and in ul. A short existing sanitary and water supply network, existing water and sewerage connections to the boundaries of individual properties, and the construction of new water supply and sanitary sewerage to unarmed plots. For the implementation of the project: the necessary documentation (Feasibility Study) has been developed. The construction works will be supervised by investors, they will be purchased information boards about the funding. The project takes into account the costs of operating a bank account created for the implementation of the project. As a result of the project, the following product indicators will be achieved: Length of reconstructed sanitary sewage system 1.29 km (including main network 0.83 km, connections 0.46 km), length of reconstructed water supply network 1.34 km (including main network 0.75 km, connections 0.59 km) The project complies with the specific objectives for priority axis 4 ROP WŚ 2014-2020 and the objective of action 4.3 i.e. an increased percentage of the population using a sewage treatment system in accordance with the directive on municipal waste water. (English) / rank
 
Normal rank
Property / summary: The scope of the project includes reconstruction in ul. Insurgents in 1863 and in ul. A short existing sanitary and water supply network, existing water and sewerage connections to the boundaries of individual properties, and the construction of new water supply and sanitary sewerage to unarmed plots. For the implementation of the project: the necessary documentation (Feasibility Study) has been developed. The construction works will be supervised by investors, they will be purchased information boards about the funding. The project takes into account the costs of operating a bank account created for the implementation of the project. As a result of the project, the following product indicators will be achieved: Length of reconstructed sanitary sewage system 1.29 km (including main network 0.83 km, connections 0.46 km), length of reconstructed water supply network 1.34 km (including main network 0.75 km, connections 0.59 km) The project complies with the specific objectives for priority axis 4 ROP WŚ 2014-2020 and the objective of action 4.3 i.e. an increased percentage of the population using a sewage treatment system in accordance with the directive on municipal waste water. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:00, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the sewage and water supply system — Agglomeration of Suchedów — Stage IV
Project in Poland financed by DG Regio

    Statements

    0 references
    1,115,705.99 zloty
    0 references
    267,769.44 Euro
    13 January 2020
    0 references
    1,394,632.49 zloty
    0 references
    334,711.8 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    5 January 2017
    0 references
    31 December 2021
    0 references
    GMINA SUCHEDNIÓW
    0 references
    Zakres projektu obejmuje przebudowę w ul. Powstańców 1863 r. i w ul. Krótkiej istniejącej sieci kanalizacji sanitarnej i wodociągowej, istniejących przyłączy wodociągowych i kanalizacyjnych do granic poszczególnych posesji oraz budowę nowych przyłączy wodociągowych i kanalizacji sanitarnej do działek nieuzbrojonych. Na potrzeby realizacji projektu: została opracowana niezbędna dokumentacja (Studium Wykonalności). Nad robotami budowlanymi będzie sprawowany nadzór inwestorski, zostaną zakupione tablice informujące o dofinansowaniu. Projekt uwzględnia koszty obsługi bankowej konta utworzonego na potrzeby realizacji projektu. W wyniku realizacji projektu zostaną osiągnięte następujące wskaźniki produktu: Długość przebudowanej kanalizacji sanitarnej 1,29 km (w tym sieć główna 0,83 km, przyłącza 0,46 km), Długość przebudowanej sieci wodociągowej 1,34 km (w tym sieć główna 0,75 km, przyłącza 0,59 km) Projekt jest zgodny z celami szczegółowymi dla osi priorytetowej 4 RPO WŚ 2014 - 2020 oraz celem działania 4.3 tj. zwiększony odsetek ludności korzystającej z systemu oczyszczania ścieków zgodnego z dyrektywą dotyczącą ścieków komunalnych. (Polish)
    0 references
    The scope of the project includes reconstruction in ul. Insurgents in 1863 and in ul. A short existing sanitary and water supply network, existing water and sewerage connections to the boundaries of individual properties, and the construction of new water supply and sanitary sewerage to unarmed plots. For the implementation of the project: the necessary documentation (Feasibility Study) has been developed. The construction works will be supervised by investors, they will be purchased information boards about the funding. The project takes into account the costs of operating a bank account created for the implementation of the project. As a result of the project, the following product indicators will be achieved: Length of reconstructed sanitary sewage system 1.29 km (including main network 0.83 km, connections 0.46 km), length of reconstructed water supply network 1.34 km (including main network 0.75 km, connections 0.59 km) The project complies with the specific objectives for priority axis 4 ROP WŚ 2014-2020 and the objective of action 4.3 i.e. an increased percentage of the population using a sewage treatment system in accordance with the directive on municipal waste water. (English)
    21 October 2020
    0 references

    Identifiers

    RPSW.04.03.00-26-0038/16
    0 references