The development of investment sites in the area of the 650th anniversary of Bartoszyce — Phase I (Q130229): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project is the first phase of the development of the 650th anniversary in Bartoszyce and consists of the construction of a road infrastructure with the provision of road infrastructure along with the development of the road transport infrastructure (water supply, sanitary sewage system, storm water system) designated by Bartoszyce Municipal Council (Bartoszyce Municipal Council No XLV/262/2006 of 30 March 2006). The scope of this project r...) |
(Created claim: summary (P836): The project constitutes the first stage of implementation of the housing estate of 650 years in Bartoszyce and consists of the creation of road infrastructure, together with street lighting for communication services, along with the armament of the areas (construction of water supply, sanitary sewage system, rainwater drainage) marked in the current MPZP of Bartoszyce City Council (BARTOszyce City Council Resolution No. XLV/262/2006 of 30 March...) |
||||||||||||||
Property / summary | |||||||||||||||
The project constitutes the first stage of implementation of the housing estate of 650 years in Bartoszyce and consists of the creation of road infrastructure, together with street lighting for communication services, along with the armament of the areas (construction of water supply, sanitary sewage system, rainwater drainage) marked in the current MPZP of Bartoszyce City Council (BARTOszyce City Council Resolution No. XLV/262/2006 of 30 March 2006). The scope of the project relates to the area identified in the above-mentioned MPZP as 19 UHR Areas of the proposed commercial and craft services. The communication services of this area were determined only from the designed internal street. A detailed description of the project can be found in Annex 5 to the application in the extract from the technical documentation, while the graphic part in the extract and engraving of the MPZP. The project will be implemented by the Bartoszyce City Hall in the field of competence of the Technical and Investment Faculty. The most important stages of project implementation include: — selection of an economic operator in the Public Procurement Law procedure (a contract was signed with the contractor in the first quarter. 2017), – proper implementation in kind and financial of the investment within the period from quarter I. 2017 to III sq. 2018. The project fits into the assumptions set out in the SzOOP RPO WiM fulfilling the objective of sub-measure 1.3.4 Investment areas defined as better conditions for the development of SMEs. Conformity with the type of project is specified in point. 3.7 of the proposal. (English) | |||||||||||||||
Property / summary: The project constitutes the first stage of implementation of the housing estate of 650 years in Bartoszyce and consists of the creation of road infrastructure, together with street lighting for communication services, along with the armament of the areas (construction of water supply, sanitary sewage system, rainwater drainage) marked in the current MPZP of Bartoszyce City Council (BARTOszyce City Council Resolution No. XLV/262/2006 of 30 March 2006). The scope of the project relates to the area identified in the above-mentioned MPZP as 19 UHR Areas of the proposed commercial and craft services. The communication services of this area were determined only from the designed internal street. A detailed description of the project can be found in Annex 5 to the application in the extract from the technical documentation, while the graphic part in the extract and engraving of the MPZP. The project will be implemented by the Bartoszyce City Hall in the field of competence of the Technical and Investment Faculty. The most important stages of project implementation include: — selection of an economic operator in the Public Procurement Law procedure (a contract was signed with the contractor in the first quarter. 2017), – proper implementation in kind and financial of the investment within the period from quarter I. 2017 to III sq. 2018. The project fits into the assumptions set out in the SzOOP RPO WiM fulfilling the objective of sub-measure 1.3.4 Investment areas defined as better conditions for the development of SMEs. Conformity with the type of project is specified in point. 3.7 of the proposal. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project constitutes the first stage of implementation of the housing estate of 650 years in Bartoszyce and consists of the creation of road infrastructure, together with street lighting for communication services, along with the armament of the areas (construction of water supply, sanitary sewage system, rainwater drainage) marked in the current MPZP of Bartoszyce City Council (BARTOszyce City Council Resolution No. XLV/262/2006 of 30 March 2006). The scope of the project relates to the area identified in the above-mentioned MPZP as 19 UHR Areas of the proposed commercial and craft services. The communication services of this area were determined only from the designed internal street. A detailed description of the project can be found in Annex 5 to the application in the extract from the technical documentation, while the graphic part in the extract and engraving of the MPZP. The project will be implemented by the Bartoszyce City Hall in the field of competence of the Technical and Investment Faculty. The most important stages of project implementation include: — selection of an economic operator in the Public Procurement Law procedure (a contract was signed with the contractor in the first quarter. 2017), – proper implementation in kind and financial of the investment within the period from quarter I. 2017 to III sq. 2018. The project fits into the assumptions set out in the SzOOP RPO WiM fulfilling the objective of sub-measure 1.3.4 Investment areas defined as better conditions for the development of SMEs. Conformity with the type of project is specified in point. 3.7 of the proposal. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 12:51, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The development of investment sites in the area of the 650th anniversary of Bartoszyce — Phase I |
Project in Poland financed by DG Regio |
Statements
1,325,077.51 zloty
0 references
1,636,100.15 zloty
0 references
80.99 percent
0 references
15 March 2017
0 references
30 September 2018
0 references
GMINA MIEJSKA BARTOSZYCE
0 references
Przedsięwzięcie stanowi I etap realizacyjny osiedla 650-lecia w Bartoszycach i polega na stworzeniu infrastruktury drogowej wraz z oświetleniem ulicznym do obsługi komunikacyjnej wraz z uzbrojeniem terenów (wykonanie wodociągu, kanalizacji sanitarnej, kanalizacji deszczowej) oznaczonych w obowiązującym MPZP miasta Bartoszyce (Uchwała Rady Miasta Bartoszyce Nr XLV/262/2006 z dnia 30 marca 2006 r.). Zakres przedmiotowego projektu dotyczy obszaru oznaczonego w powyższym MPZP jako 19 UHR Teren projektowanych usług handlowych i rzemieślniczych. Obsługa komunikacyjna tego terenu określona została wyłącznie z projektowanej ulicy wewnętrznej. Szczegółowy opis projektu znajduje się w Załączniku nr 5 do wniosku w wyciągu z dokumentacji technicznej, natomiast część graficzna w wypisie i wyrysie MPZP. Projekt będzie wdrażany przez Urząd Miasta Bartoszyce w zakresie kompetencji Wydziału Techniczno-Inwestycyjnego. Do najważniejszych etapów realizacji projektu należy zaliczyć: - wyłonienie wykonawcy w procedurze Prawa zamówień publicznych (założono podpisanie umowy z wykonawcą w I kw. 2017), - właściwą realizację rzeczową i finansową inwestycji w terminie od I kw. 2017 do III kw. 2018. Projekt wpisuje się w założenia określone w SzOOP RPO WiM realizując cel Poddziałania 1.3.4 Tereny inwestycyjne określony jako Lepsze warunki do rozwoju MŚP. Zgodność z typem projektu określono w pkt. 3.7 wniosku. (Polish)
0 references
The project constitutes the first stage of implementation of the housing estate of 650 years in Bartoszyce and consists of the creation of road infrastructure, together with street lighting for communication services, along with the armament of the areas (construction of water supply, sanitary sewage system, rainwater drainage) marked in the current MPZP of Bartoszyce City Council (BARTOszyce City Council Resolution No. XLV/262/2006 of 30 March 2006). The scope of the project relates to the area identified in the above-mentioned MPZP as 19 UHR Areas of the proposed commercial and craft services. The communication services of this area were determined only from the designed internal street. A detailed description of the project can be found in Annex 5 to the application in the extract from the technical documentation, while the graphic part in the extract and engraving of the MPZP. The project will be implemented by the Bartoszyce City Hall in the field of competence of the Technical and Investment Faculty. The most important stages of project implementation include: — selection of an economic operator in the Public Procurement Law procedure (a contract was signed with the contractor in the first quarter. 2017), – proper implementation in kind and financial of the investment within the period from quarter I. 2017 to III sq. 2018. The project fits into the assumptions set out in the SzOOP RPO WiM fulfilling the objective of sub-measure 1.3.4 Investment areas defined as better conditions for the development of SMEs. Conformity with the type of project is specified in point. 3.7 of the proposal. (English)
21 October 2020
0 references
Identifiers
RPWM.01.03.04-28-0012/16
0 references