Water and wastewater management improved by construction of the sanitary sewage system in m. School and construction of the water supply in m. Flower (Q124221): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The scope of the investment includes the building of: • a sewerage network in ul. In the field of schooling, in the following areas. The scope of the project covers works: gravity network, press and reconstruction of the existing sewage pumping station• the water supply network in the ul. The flower in the area from post 7 to the junction to the ul. Railway — replacing the existing water supply from steel pipes — the new water supply network f...) |
(Created claim: summary (P836): The scope of the investment includes the construction of: • sanitary sewage networks in ul. High school, in the backyard. The scope of the project includes construction works: gravitational network, pressing with reconstruction of the existing sewage pumping plant • water supply network in ul. Flower in Przystajnia on the section from property no. 7 to the intersection with ul. Rail – which consists of replacing the existing well-maintained wate...) |
||||||||||||||
Property / summary | |||||||||||||||
The scope of the investment includes the construction of: • sanitary sewage networks in ul. High school, in the backyard. The scope of the project includes construction works: gravitational network, pressing with reconstruction of the existing sewage pumping plant • water supply network in ul. Flower in Przystajnia on the section from property no. 7 to the intersection with ul. Rail – which consists of replacing the existing well-maintained water supply made of steel pipes – with the new water supply network from PE pipes and the surge of existing connections to buildings (in a new mileage in road plots). At the same time, the project will provide investor supervision and project promotion. (English) | |||||||||||||||
Property / summary: The scope of the investment includes the construction of: • sanitary sewage networks in ul. High school, in the backyard. The scope of the project includes construction works: gravitational network, pressing with reconstruction of the existing sewage pumping plant • water supply network in ul. Flower in Przystajnia on the section from property no. 7 to the intersection with ul. Rail – which consists of replacing the existing well-maintained water supply made of steel pipes – with the new water supply network from PE pipes and the surge of existing connections to buildings (in a new mileage in road plots). At the same time, the project will provide investor supervision and project promotion. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The scope of the investment includes the construction of: • sanitary sewage networks in ul. High school, in the backyard. The scope of the project includes construction works: gravitational network, pressing with reconstruction of the existing sewage pumping plant • water supply network in ul. Flower in Przystajnia on the section from property no. 7 to the intersection with ul. Rail – which consists of replacing the existing well-maintained water supply made of steel pipes – with the new water supply network from PE pipes and the surge of existing connections to buildings (in a new mileage in road plots). At the same time, the project will provide investor supervision and project promotion. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 12:29, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Water and wastewater management improved by construction of the sanitary sewage system in m. School and construction of the water supply in m. Flower |
Project in Poland financed by DG Regio |
Statements
888,366.14 zloty
0 references
1,045,136.64 zloty
0 references
85.0 percent
0 references
10 March 2017
0 references
31 December 2018
0 references
GMINA PRZYSTAJŃ
0 references
Zakres inwestycji obejmuje budowę: • sieci kanalizacji sanitarnej w ul. Szkolnej, w Przystajni. Zakres przedsięwzięcia obejmuje roboty budowlane: sieć grawitacyjną, tłoczną wraz z przebudową istniejącej przepompowni ścieków • sieci wodociągowej w ul. Kwiatowej w Przystajni na odcinku od posesji nr 7 do skrzyżowania z ul. Kolejową - polegającą na zastąpieniu istniejącego wyeksploatowanego wodociągu wykonanego z rur stalowych - nową siecią wodociągową z rur PE oraz przepięciu do niej istniejących przyłączy do budynków (w nowym przebiegu w działkach drogowych). Jednocześnie w ramach projektu zostanie zapewniony nadzór inwestorski i promocja projektu. (Polish)
0 references
The scope of the investment includes the construction of: • sanitary sewage networks in ul. High school, in the backyard. The scope of the project includes construction works: gravitational network, pressing with reconstruction of the existing sewage pumping plant • water supply network in ul. Flower in Przystajnia on the section from property no. 7 to the intersection with ul. Rail – which consists of replacing the existing well-maintained water supply made of steel pipes – with the new water supply network from PE pipes and the surge of existing connections to buildings (in a new mileage in road plots). At the same time, the project will provide investor supervision and project promotion. (English)
21 October 2020
0 references
Identifiers
RPSL.05.01.02-24-06DC/17
0 references