Complex wastewater management in the Sosnicowice agglomeration — phase I (Q124198): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project concerns the development of a sewerage network in Łany Wielkie town in the area of the Sośnicowice agglomeration with a size of 3 459 p.e.. The scope of the project consists of the construction of a sewerage system comprising: Primary sanitary sewerage network collectors with a length of 5 207 mb with connections, — collectors of a discharge network for sanitary sewage system with a length of 652 mb, — 3 network pumping stations. A...)
(‎Created claim: summary (P836): The project concerns the extension of the sewage system in Łany Wielkie in the area of the Sośnicowice Agglomeration with a size of 3 459 RLM. The scope of the project includes the construction of sanitary sewerage including: — main collectors of 5207 m long sanitary sewage system with connections, – collectors of 652 m long sanitary drainage system, – 3 network sewage pumping plants. As a result of the project, residential buildings inhabited b...)
Property / summary
 
The project concerns the extension of the sewage system in Łany Wielkie in the area of the Sośnicowice Agglomeration with a size of 3 459 RLM. The scope of the project includes the construction of sanitary sewerage including: — main collectors of 5207 m long sanitary sewage system with connections, – collectors of 652 m long sanitary drainage system, – 3 network sewage pumping plants. As a result of the project, residential buildings inhabited by 737 people will be connected to the sewage system. Waste water from the area covered by the planned sewage system will be treated at the existing sewage treatment plant in Sośnicowice. (English)
Property / summary: The project concerns the extension of the sewage system in Łany Wielkie in the area of the Sośnicowice Agglomeration with a size of 3 459 RLM. The scope of the project includes the construction of sanitary sewerage including: — main collectors of 5207 m long sanitary sewage system with connections, – collectors of 652 m long sanitary drainage system, – 3 network sewage pumping plants. As a result of the project, residential buildings inhabited by 737 people will be connected to the sewage system. Waste water from the area covered by the planned sewage system will be treated at the existing sewage treatment plant in Sośnicowice. (English) / rank
 
Normal rank
Property / summary: The project concerns the extension of the sewage system in Łany Wielkie in the area of the Sośnicowice Agglomeration with a size of 3 459 RLM. The scope of the project includes the construction of sanitary sewerage including: — main collectors of 5207 m long sanitary sewage system with connections, – collectors of 652 m long sanitary drainage system, – 3 network sewage pumping plants. As a result of the project, residential buildings inhabited by 737 people will be connected to the sewage system. Waste water from the area covered by the planned sewage system will be treated at the existing sewage treatment plant in Sośnicowice. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:28, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Complex wastewater management in the Sosnicowice agglomeration — phase I
Project in Poland financed by DG Regio

    Statements

    0 references
    5,035,670.21 zloty
    0 references
    1,208,560.85 Euro
    13 January 2020
    0 references
    6,866,118.03 zloty
    0 references
    1,647,868.33 Euro
    13 January 2020
    0 references
    73.34 percent
    0 references
    30 March 2019
    0 references
    31 January 2021
    0 references
    GMINA SOŚNICOWICE
    0 references

    50°16'20.3"N, 18°31'47.6"E
    0 references
    Projekt dotyczy rozbudowy sieci kanalizacji sanitarnej w miejscowości Łany Wielkie na obszarze Aglomeracji Sośnicowice o wielkości 3 459 RLM. W zakres projektu wchodzi budowa kanalizacji sanitarnej obejmującej: - kolektory główne sieci kanalizacji sanitarnej grawitacyjnej o długości 5 207 mb wraz z przyłączami, - kolektory sieci kanalizacji sanitarnej tłocznej o długości 652 mb, - 3 sieciowych przepompowni ścieków. W wyniku realizacji projektu do kanalizacji zostaną podłączone budynki mieszkalne zamieszkałe przez 737 osób. Ścieki z obszaru objętego planowaną kanalizacją zostaną oczyszczone na istniejącej oczyszczalni ścieków w Sośnicowicach. (Polish)
    0 references
    The project concerns the extension of the sewage system in Łany Wielkie in the area of the Sośnicowice Agglomeration with a size of 3 459 RLM. The scope of the project includes the construction of sanitary sewerage including: — main collectors of 5207 m long sanitary sewage system with connections, – collectors of 652 m long sanitary drainage system, – 3 network sewage pumping plants. As a result of the project, residential buildings inhabited by 737 people will be connected to the sewage system. Waste water from the area covered by the planned sewage system will be treated at the existing sewage treatment plant in Sośnicowice. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.05.01.01-24-06EG/17
    0 references