Thermo-modernisation of public buildings in the municipality of Italian (Q127658): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project concerns thermal modernisation with modernisation of the heating system and lighting modernisation including the installation of the photovoltaic installation, the installation of individual heat meters, thermostats and sub-vertical valves in the 5-occupied public buildings: ZPO Nos 1 and 2 in Italy, the ZPO in Kudrów, the school and the kindergarten, SP in Czarncy. The investment is a continuation of existing projects aimed at imp...)
Property / summary
The project concerns thermal modernisation with modernisation of the heating system and lighting modernisation including the installation of the photovoltaic installation, the installation of individual heat meters, thermostats and sub-vertical valves in the 5-occupied public buildings: ZPO Nos 1 and 2 in Italy, the ZPO in Kudrów, the school and the kindergarten, SP in Czarncy. The investment is a continuation of existing projects aimed at improving the technical situation and improving the energy efficiency of public utilities. One of the problems diagnosed as a result of the evaluation of the current situation of the Italian municipality is the low energy efficiency of public utilities. The current technical and energy condition of the buildings covered by the project is unsatisfactory. Buildings show a significant loss of thermal energy caused, among other things, by non-insulated walls, ceilings. Lighting is also required. There is no use of renewable energy sources. The main objective is to increase the energy efficiency of public buildings in the Italian municipality by means of a comprehensive thermal renovation of five buildings. It is in line with the objective set for Priority 3 and Action 3.3 of the EAP, i.e. to increase the energy efficiency of public buildings and the residential sector. Indicators will be put in place: Estimated annual decrease in greenhouse gas emissions — 475,07 CO2/rok; Number of energy modernised buildings — 5; Usable surface area of buildings undergoing thermal modernisation — 7 605.37 m²; Reduction of annual primary energy consumption in public buildings — 1 596 726.34 kWh/year; Number of units of generation of electricity produced from RES — 5; Amount of electricity saved: 82.95 MWh/year; Amount of thermal energy saved — 3 826,94 GJ/year; Reduction in final energy consumption as a result of project implementation — 4 317,68 GJ/year. Implementation: 2017-2018. (English)
 
Property / summary: The project concerns thermal modernisation with modernisation of the heating system and lighting modernisation including the installation of the photovoltaic installation, the installation of individual heat meters, thermostats and sub-vertical valves in the 5-occupied public buildings: ZPO Nos 1 and 2 in Italy, the ZPO in Kudrów, the school and the kindergarten, SP in Czarncy. The investment is a continuation of existing projects aimed at improving the technical situation and improving the energy efficiency of public utilities. One of the problems diagnosed as a result of the evaluation of the current situation of the Italian municipality is the low energy efficiency of public utilities. The current technical and energy condition of the buildings covered by the project is unsatisfactory. Buildings show a significant loss of thermal energy caused, among other things, by non-insulated walls, ceilings. Lighting is also required. There is no use of renewable energy sources. The main objective is to increase the energy efficiency of public buildings in the Italian municipality by means of a comprehensive thermal renovation of five buildings. It is in line with the objective set for Priority 3 and Action 3.3 of the EAP, i.e. to increase the energy efficiency of public buildings and the residential sector. Indicators will be put in place: Estimated annual decrease in greenhouse gas emissions — 475,07 CO2/rok; Number of energy modernised buildings — 5; Usable surface area of buildings undergoing thermal modernisation — 7 605.37 m²; Reduction of annual primary energy consumption in public buildings — 1 596 726.34 kWh/year; Number of units of generation of electricity produced from RES — 5; Amount of electricity saved: 82.95 MWh/year; Amount of thermal energy saved — 3 826,94 GJ/year; Reduction in final energy consumption as a result of project implementation — 4 317,68 GJ/year. Implementation: 2017-2018. (English) / rank
Normal rank
 

Revision as of 12:16, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermo-modernisation of public buildings in the municipality of Italian
Project in Poland financed by DG Regio

    Statements

    0 references
    2,822,477.39 zloty
    0 references
    677,394.57 Euro
    13 January 2020
    0 references
    3,320,561.63 zloty
    0 references
    796,934.79 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    9 November 2016
    0 references
    30 November 2018
    0 references
    GMINA WŁOSZCZOWA
    0 references
    Projekt dotyczy termomodernizacji wraz z modernizacją instalacji grzewczej oraz modernizacji oświetlenia wraz z montażem instalacji fotowoltaicznej, instalacji indywidualnych liczników ciepła, termostatów i zaworów podpionowych w 5-u budynkach użyteczności publicznej: ZPO nr 1 i 2 we Włoszczowie, ZPO w Kurzelowie – szkoła i przedszkole, SP w Czarncy. Inwestycja stanowi kontynuację realizowanych dotychczas projektów, mających na celu poprawę stanu technicznego i podniesienie efektywności energetycznej obiektów użyteczności publicznej. Jednym z problemów zdiagnozowanych w wyniku przeprowadzonej oceny aktualnej sytuacji Gminy Włoszczowa jest niska efektywność energetyczna obiektów użyteczności publicznej. Dotychczasowy stan techniczny i energetyczny budynków objętych projektem jest niezadowalający. Budynki wykazują znaczne straty energii cieplnej, co spowodowane jest m.in. nieocieplonymi ścianami, stropami. Modernizacji wymaga także oświetlenie. Brak jest wykorzystania odnawialnych źródeł energii. Cel główny to zwiększenie efektywności energetycznej budynków użyteczności publicznej w Gminie Włoszczowa poprzez kompleksową termomodernizację pięciu budynków. Jest on zgodny z celem wyznaczonym dla Osi priorytetowej 3. i Działania 3.3 RPOWŚ, tj. zwiększeniem efektywności energetycznej budynków publicznych oraz sektora mieszkaniowego. Zrealizowane zostaną wskaźniki: Szacowany roczny spadek emisji gazów cieplarnianych - 475,07 CO2/rok; Liczba zmodernizowanych energetycznie budynków – 5 szt.; Powierzchnia użytkowa budynków poddanych termomodernizacji – 7 605,37 m2; Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych – 1 596 726,34 kWh/rok; Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE – 5 szt.; Ilość zaoszczędzonej energii elektrycznej - 82,95 MWh/rok; Ilość zaoszczędzonej energii cieplnej – 3 826,94 GJ/rok; Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów – 4 317,68 GJ/rok. Realizacja: 2017-2018. (Polish)
    0 references

    Identifiers

    RPSW.03.03.00-26-0052/16
    0 references