Construction of lighting supplied by renewable energy in the municipality of Suzec (Q123695): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The object of the project is the construction of a 40 kW hybrid street lighting in the municipality of Suzac in a quantity of 101. Each lamp will be powered by a photovoltaic module and a wind turbine. The lamps will be installed on the steel poles with a height of 9,5 mb, on the basis of a prefabricated headline rate., remove_old_english_translation)
(‎Created claim: summary (P836): The subject of the project is the construction of hybrid street lighting up to 40 kW in the municipality of Suszec in the amount of 101 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on a prefabricated foundation alloy., translated_summary)
Property / summary
 
The subject of the project is the construction of hybrid street lighting up to 40 kW in the municipality of Suszec in the amount of 101 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on a prefabricated foundation alloy. (English)
Property / summary: The subject of the project is the construction of hybrid street lighting up to 40 kW in the municipality of Suszec in the amount of 101 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on a prefabricated foundation alloy. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the construction of hybrid street lighting up to 40 kW in the municipality of Suszec in the amount of 101 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on a prefabricated foundation alloy. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:37, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of lighting supplied by renewable energy in the municipality of Suzec
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    1,361,955.0 zloty
    0 references
    326,869.2 Euro
    13 January 2020
    0 references
    1,602,300.0 zloty
    0 references
    384,552.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 October 2017
    0 references
    30 November 2018
    0 references
    GMINA SUSZEC
    0 references
    0 references

    50°2'16.8"N, 18°47'17.9"E
    0 references
    Przedmiotem projektu jest budowa oświetlenia ulicznego hybrydowego o mocy do 40kW na terenie Gminy Suszec w ilości 101 szt. Każda lampa będzie zasilana modułem fotowoltaicznym i turbiną wiatrową. Lampy będą zainstalowane na stalowych słupach o wysokości 9,5 mb, posadowione na prefabrykowanej stopie fundamentowej. (Polish)
    0 references
    The subject of the project is the construction of hybrid street lighting up to 40 kW in the municipality of Suszec in the amount of 101 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on a prefabricated foundation alloy. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.04.01.01-24-02B2/16
    0 references