Construction of lighting supplied by renewable energy in the municipality of Suzec — stage II (Q123662): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The object of the project is the construction of street lighting in the municipality of Suzac in 48. Each lamp will be powered by a photovoltaic module and a wind turbine. The lamps will be installed on a base rate of 9,5 mb on the steel poles., remove_old_english_translation) |
(Created claim: summary (P836): The subject of the project is the construction of hybrid street lighting in the area of Suszec commune in the amount of 48 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on the foundation foot., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the construction of hybrid street lighting in the area of Suszec commune in the amount of 48 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on the foundation foot. (English) | |||||||||||||||
Property / summary: The subject of the project is the construction of hybrid street lighting in the area of Suszec commune in the amount of 48 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on the foundation foot. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the construction of hybrid street lighting in the area of Suszec commune in the amount of 48 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on the foundation foot. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 10:36, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of lighting supplied by renewable energy in the municipality of Suzec — stage II |
Project in Poland financed by DG Regio |
Statements
554,115.0 zloty
0 references
651,900.0 zloty
0 references
85.0 percent
0 references
1 October 2019
0 references
30 November 2020
0 references
GMINA SUSZEC
0 references
Przedmiotem projektu jest budowa oświetlenia ulicznego hybrydowego na terenie Gminy Suszec w ilości 48 szt. Każda lampa będzie zasilana modułem fotowoltaicznym i turbiną wiatrową. Lampy będą zainstalowane na stalowych słupach o wysokości 9,5 mb, posadowione na stopie fundamentowej. (Polish)
0 references
The subject of the project is the construction of hybrid street lighting in the area of Suszec commune in the amount of 48 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on the foundation foot. (English)
21 October 2020
0 references
Identifiers
RPSL.04.01.01-24-0077/19
0 references