Construction of lighting supplied by renewable energy in the municipality of Suzec — stage II (Q123662): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The object of the project is the construction of street lighting in the municipality of Suzac in 48. Each lamp will be powered by a photovoltaic module and a wind turbine. The lamps will be installed on a base rate of 9,5 mb on the steel poles., remove_old_english_translation)
(‎Created claim: summary (P836): The subject of the project is the construction of hybrid street lighting in the area of Suszec commune in the amount of 48 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on the foundation foot., translated_summary)
Property / summary
 
The subject of the project is the construction of hybrid street lighting in the area of Suszec commune in the amount of 48 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on the foundation foot. (English)
Property / summary: The subject of the project is the construction of hybrid street lighting in the area of Suszec commune in the amount of 48 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on the foundation foot. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the construction of hybrid street lighting in the area of Suszec commune in the amount of 48 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on the foundation foot. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:36, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of lighting supplied by renewable energy in the municipality of Suzec — stage II
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    554,115.0 zloty
    0 references
    132,987.6 Euro
    13 January 2020
    0 references
    651,900.0 zloty
    0 references
    156,456.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2019
    0 references
    30 November 2020
    0 references
    GMINA SUSZEC
    0 references
    0 references

    50°2'16.8"N, 18°47'17.9"E
    0 references
    Przedmiotem projektu jest budowa oświetlenia ulicznego hybrydowego na terenie Gminy Suszec w ilości 48 szt. Każda lampa będzie zasilana modułem fotowoltaicznym i turbiną wiatrową. Lampy będą zainstalowane na stalowych słupach o wysokości 9,5 mb, posadowione na stopie fundamentowej. (Polish)
    0 references
    The subject of the project is the construction of hybrid street lighting in the area of Suszec commune in the amount of 48 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on the foundation foot. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.04.01.01-24-0077/19
    0 references