Commissioning of hybrid wind turbines production (Q123381): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: remove_english_label) |
(Changed label, description and/or aliases in 1 language: translated_label) |
||
label / en | label / en | ||
Commissioning of hybrid wind turbines production |
Revision as of 09:59, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Commissioning of hybrid wind turbines production |
Project in Poland financed by DG Regio |
Statements
1,480,275.0 zloty
0 references
3,289,500.0 zloty
0 references
45.0 percent
0 references
1 March 2017
0 references
31 March 2019
0 references
GATNER DARIUSZ FIRMA HANDLOWO-USŁUGOWA "DAREX"
0 references
Projekt zakłada wdrożenie do produkcji typoszeregu hybrydowych turbin wiatrowych w układzie szeregowym o osi poziomej (Polish)
0 references
The project assumes implementation for the production of hybrid wind turbines in serial system with horizontal axis (English)
21 October 2020
0 references
Identifiers
RPSL.03.02.00-24-0278/17
0 references