Organisation of a selective municipal waste collection centre for residents of the town and municipality of Skashewy (Q122525): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project involves the setting up of a separate municipal waste collection centre in M and G. The PSZOK is the place in which the residents of the MIG Skarzew will be able to leave their own, separately collected municipal waste. A point of urgency is planned, taking into account the easy access to the point for all inhabitants. The main aim of the project is to reduce the environmental impact of waste generated by creating the conditions fo...)
Property / summary
The project involves the setting up of a separate municipal waste collection centre in M and G. The PSZOK is the place in which the residents of the MIG Skarzew will be able to leave their own, separately collected municipal waste. A point of urgency is planned, taking into account the easy access to the point for all inhabitants. The main aim of the project is to reduce the environmental impact of waste generated by creating the conditions for the collection and storage of waste. The product will be the creation of 1 PSZOK, which will result in the full collection of waste being extended to all residents. The project involves the renovation work. Budow. (replacement of the roof, insulation of the building, renovation of the floor, the renovation of the interior lighting, the installation of an entrance., the paving of a square surrounding the building cube and the installation of the wind), the purchase of fixed assets, equipment and equipment and ferry operations. (English)
 
Property / summary: The project involves the setting up of a separate municipal waste collection centre in M and G. The PSZOK is the place in which the residents of the MIG Skarzew will be able to leave their own, separately collected municipal waste. A point of urgency is planned, taking into account the easy access to the point for all inhabitants. The main aim of the project is to reduce the environmental impact of waste generated by creating the conditions for the collection and storage of waste. The product will be the creation of 1 PSZOK, which will result in the full collection of waste being extended to all residents. The project involves the renovation work. Budow. (replacement of the roof, insulation of the building, renovation of the floor, the renovation of the interior lighting, the installation of an entrance., the paving of a square surrounding the building cube and the installation of the wind), the purchase of fixed assets, equipment and equipment and ferry operations. (English) / rank
Normal rank
 

Revision as of 09:41, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Organisation of a selective municipal waste collection centre for residents of the town and municipality of Skashewy
Project in Poland financed by DG Regio

    Statements

    0 references
    338,673.72 zloty
    0 references
    81,281.69 Euro
    13 January 2020
    0 references
    398,580.36 zloty
    0 references
    95,659.29 Euro
    13 January 2020
    0 references
    84.97 percent
    0 references
    1 July 2017
    0 references
    31 May 2018
    0 references
    GMINNE PRZEDSIĘBIORSTWO KOMUNALNE SP. Z O.O.
    0 references
    0 references
    Projekt obejmuje utworzenie na terenie M i G Skarszewy Punktu Selektywnej Zbiórki Odpadów Komunalnych. PSZOK to miejsce, w którym mieszkańcy MiG Skarszew, będą mogli zostawić wytwarzane przez siebie, selektywnie zebrane odpady komunalne. Zaplanowano punkt o charakterze stacjonarnym z uwzględnieniem łatwego dostępu do przedmiotowego punktu dla wszystkich mieszkańców. Celem głównym projektu jest ograniczenie negatywnego wpływu na środowisko wytwarzanych odpadów poprzez stworzenie warunków do prowadzenia działalności zbiórki i magazynowania odpadów. Produktem będzie utworzenie 1 PSZOK, rezultatem objęcie wszystkich mieszkańców selektywnym zbieraniem odpadów. Projekt obejmuje prace remont. – budow. (wymiana pokrycia dachu, docieplenie budynku, remont posadzki, remont oświetlenia wewnętrznego, montaż oświetlenia zewn., utwardzenie placu wokół budynku kostką polbrukową oraz montaż wiaty), zakup środków trwałych, urządzeń i sprzętu oraz przepro. działań prom. i eduk. w ramach instr. elast. (Polish)
    0 references

    Identifiers

    RPPM.11.02.00-22-0001/16
    0 references