Drainage of the city of Brusy (Q122524): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The object of the project is the design and implementation of the drainage of the western parts of Brus and ul. Kalwarna. The area is now built and planned for future construction and covers areas west of ul. Gdansk, in the direction of the River Niewraki, as well as the land located on the Kalwartown Street. The main objective of the project is therefore to prevent environmental risks and minimise the adverse effects of their effects on the l...)
(‎Created claim: summary (P836): The aim of the project is to design and execute drainage of the western part of Brus and ul. It’s a Calvary. The area is now built and planned for future buildings and covers the area west of the street. Danzig towards the Niechwaszcz river and the areas at Kalwarjna Street. The main objective of the project is therefore to prevent environmental risks and reduce the adverse impact of their effects on the level of safety in the city and the munic...)
Property / summary
 
The aim of the project is to design and execute drainage of the western part of Brus and ul. It’s a Calvary. The area is now built and planned for future buildings and covers the area west of the street. Danzig towards the Niechwaszcz river and the areas at Kalwarjna Street. The main objective of the project is therefore to prevent environmental risks and reduce the adverse impact of their effects on the level of safety in the city and the municipality of Brusy, by developing a system for the collection and purification of rainwater and meltwater within its limits. This goal will be achieved by carrying out comprehensive works on the construction of 2.778 km of rainwater drainage and the construction of 11115.00 m³ storage tanks together with accompanying infrastructure, so that 5 149 people (who are residents of Brus) will benefit from flood protection measures. The planned project fulfils the assumptions of Measure 11.1 of the WP ROP for the years 2014-2020. (English)
Property / summary: The aim of the project is to design and execute drainage of the western part of Brus and ul. It’s a Calvary. The area is now built and planned for future buildings and covers the area west of the street. Danzig towards the Niechwaszcz river and the areas at Kalwarjna Street. The main objective of the project is therefore to prevent environmental risks and reduce the adverse impact of their effects on the level of safety in the city and the municipality of Brusy, by developing a system for the collection and purification of rainwater and meltwater within its limits. This goal will be achieved by carrying out comprehensive works on the construction of 2.778 km of rainwater drainage and the construction of 11115.00 m³ storage tanks together with accompanying infrastructure, so that 5 149 people (who are residents of Brus) will benefit from flood protection measures. The planned project fulfils the assumptions of Measure 11.1 of the WP ROP for the years 2014-2020. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to design and execute drainage of the western part of Brus and ul. It’s a Calvary. The area is now built and planned for future buildings and covers the area west of the street. Danzig towards the Niechwaszcz river and the areas at Kalwarjna Street. The main objective of the project is therefore to prevent environmental risks and reduce the adverse impact of their effects on the level of safety in the city and the municipality of Brusy, by developing a system for the collection and purification of rainwater and meltwater within its limits. This goal will be achieved by carrying out comprehensive works on the construction of 2.778 km of rainwater drainage and the construction of 11115.00 m³ storage tanks together with accompanying infrastructure, so that 5 149 people (who are residents of Brus) will benefit from flood protection measures. The planned project fulfils the assumptions of Measure 11.1 of the WP ROP for the years 2014-2020. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:41, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Drainage of the city of Brusy
Project in Poland financed by DG Regio

    Statements

    0 references
    6,382,448.11 zloty
    0 references
    1,531,787.55 Euro
    13 January 2020
    0 references
    9,117,783.02 zloty
    0 references
    2,188,267.92 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    25 September 2017
    0 references
    31 December 2020
    0 references
    GMINA BRUSY
    0 references
    0 references
    Przedmiotem realizacji projektu jest zaprojektowanie i wykonanie odwodnienia zachodniej części Brus oraz ul. Kalwaryjnej. Obszar ten jest obecnie zabudowany oraz przewidziany pod przyszłą zabudowę i obejmuje tereny na zachód od ul. Gdańskiej w kierunku rzeki Niechwaszcz oraz tereny przy ulicy Kalwaryjnej. Celem głównym projektu jest zatem zapobieganie zagrożeniom środowiska i ograniczenia niekorzystnego wpływu ich skutków na poziom bezpieczeństwa na terenie miasta i gminy Brusy, poprzez rozwój systemu odbioru i oczyszczania wód opadowych i roztopowych w jego granicach. Cel ten zostanie osiągnięty poprzez wykonanie kompleksowych prac z zakresu budowy 2,778 km kanalizacji deszczowej oraz budowy zbiorników retencyjnych o pojemności 11 115,00 m3 wraz z infrastrukturą towarzyszącą, dzięki czemu 5 149 osób (będących mieszkańcami Brus) odniesie korzyści ze środków ochrony przeciwpowodziowej. Tak zaplanowany projekt wypełnia założenia Działania 11.1 RPO WP na lata 2014-2020. (Polish)
    0 references
    The aim of the project is to design and execute drainage of the western part of Brus and ul. It’s a Calvary. The area is now built and planned for future buildings and covers the area west of the street. Danzig towards the Niechwaszcz river and the areas at Kalwarjna Street. The main objective of the project is therefore to prevent environmental risks and reduce the adverse impact of their effects on the level of safety in the city and the municipality of Brusy, by developing a system for the collection and purification of rainwater and meltwater within its limits. This goal will be achieved by carrying out comprehensive works on the construction of 2.778 km of rainwater drainage and the construction of 11115.00 m³ storage tanks together with accompanying infrastructure, so that 5 149 people (who are residents of Brus) will benefit from flood protection measures. The planned project fulfils the assumptions of Measure 11.1 of the WP ROP for the years 2014-2020. (English)
    21 October 2020
    0 references

    Identifiers

    RPPM.11.01.00-22-0025/16
    0 references