Preparation of preparatory documentation for the ‘Improvement of capacity on line No 213 Reda — Hel’ (Q122353): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The preparation of the preparatory documentation for the project ‘Improvement of capacity on line No 213 Reda — Hel’, under which a detailed inventory of the line will be carried out, followed by a feasibility study in line with the standards in force (including the scope and cost of the works), the project information sheet, if it is to make a provision on the need to carry out an environmental impact assessment, also an EIA report to make fi...)
(‎Created claim: summary (P836): Preparation of preparatory documentation for the project “Improving capacity on line No.213 Reda – Hel”, where detailed inventory of the line will be carried out, followed by a feasibility study in accordance with the applicable standards (including scope and costs of works), information sheet of the project, if there is a need for environmental impact assessment, also an EIA report in order to take financial and material decisions regarding pla...)
Property / summary
 
Preparation of preparatory documentation for the project “Improving capacity on line No.213 Reda – Hel”, where detailed inventory of the line will be carried out, followed by a feasibility study in accordance with the applicable standards (including scope and costs of works), information sheet of the project, if there is a need for environmental impact assessment, also an EIA report in order to take financial and material decisions regarding planned revitalisation and electrification of the railway line and a functional-use programme will be prepared. (English)
Property / summary: Preparation of preparatory documentation for the project “Improving capacity on line No.213 Reda – Hel”, where detailed inventory of the line will be carried out, followed by a feasibility study in accordance with the applicable standards (including scope and costs of works), information sheet of the project, if there is a need for environmental impact assessment, also an EIA report in order to take financial and material decisions regarding planned revitalisation and electrification of the railway line and a functional-use programme will be prepared. (English) / rank
 
Normal rank
Property / summary: Preparation of preparatory documentation for the project “Improving capacity on line No.213 Reda – Hel”, where detailed inventory of the line will be carried out, followed by a feasibility study in accordance with the applicable standards (including scope and costs of works), information sheet of the project, if there is a need for environmental impact assessment, also an EIA report in order to take financial and material decisions regarding planned revitalisation and electrification of the railway line and a functional-use programme will be prepared. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:34, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Preparation of preparatory documentation for the ‘Improvement of capacity on line No 213 Reda — Hel’
Project in Poland financed by DG Regio

    Statements

    0 references
    1,289,253.88 zloty
    0 references
    309,420.93 Euro
    13 January 2020
    0 references
    1,516,769.28 zloty
    0 references
    364,024.63 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    4 June 2019
    0 references
    30 December 2020
    0 references
    PKP POLSKIE LINIE KOLEJOWE S.A.
    0 references
    Q2515024 (Deleted Item)
    0 references
    Opracowanie dokumentacji przygotowawczej dla projektu „Poprawa przepustowości na linii Nr 213 Reda – Hel”, w ramach której zostanie wykonana szczegółowa inwentaryzacja linii, a następnie studium wykonalności zgodne z obowiązującymi w tym zakresie standardami (uwzględniające zakres i koszty robót), karta informacyjna przedsięwzięcia, jeśli będzie Postanowienie o potrzebie przeprowadzenia oceny oddziaływania na środowisko również raport OOŚ w celu podjęcia decyzji finansowych i rzeczowych w zakresie planowanej rewitalizacji i elektryfikacji linii kolejowej oraz przygotowany zostanie program funkcjonalno – użytkowy. (Polish)
    0 references
    Preparation of preparatory documentation for the project “Improving capacity on line No.213 Reda – Hel”, where detailed inventory of the line will be carried out, followed by a feasibility study in accordance with the applicable standards (including scope and costs of works), information sheet of the project, if there is a need for environmental impact assessment, also an EIA report in order to take financial and material decisions regarding planned revitalisation and electrification of the railway line and a functional-use programme will be prepared. (English)
    21 October 2020
    0 references

    Identifiers

    RPPM.09.02.02-22-0002/18
    0 references