Photovoltaics — renewable energy source on four public utility sites in the Municipality of Godów (Q123765): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project involves the construction of a renewable installation — a photovoltaic installation for 4 buildings of public interest in the Municipality of Godów: — OK in Gołkowicki — 114 panels of 350W, — power output of 39.9 kW — SP in Gołkowicki — 114 panels of 350 panels of 350 W — installation capacity of 39.9 kW — SP in Skrzyszów — 114 panels of panels of 350 W — capacity of 39,9 kW1 — School and School Group in Godów — 69 panels of W — Po...)
(‎Created claim: summary (P836): The project involves the construction of RES installations – photovoltaic installations on 4 public utility buildings in Godów Municipality: —OK in Gołkowice – 114 panels of 350 W – installation power 39.9 kW -SP in Gołkowice – 114 panels of 350 W – installation power 39.9 kW -SP in Skrzyszów – 114 panels of 350 W – installation power 39.9 kW1 – School and preschool in Godów – 69 panels of 350 W – installation power 24.15 kW Scope of works on bu...)
Property / summary
 
The project involves the construction of RES installations – photovoltaic installations on 4 public utility buildings in Godów Municipality: —OK in Gołkowice – 114 panels of 350 W – installation power 39.9 kW -SP in Gołkowice – 114 panels of 350 W – installation power 39.9 kW -SP in Skrzyszów – 114 panels of 350 W – installation power 39.9 kW1 – School and preschool in Godów – 69 panels of 350 W – installation power 24.15 kW Scope of works on buildings: — installation of photovoltaic panels together with construction – installation of inverter – wiring – connection of inverter and security – lightning protection – necessary overhaul works Panels will be installed on the roof of a building on ballast structures (without damaging the roof) of stainless steel. The mounting structure will consist of a clamp and brackets for the PV panel. The structure will be positioned on the roof without the use of drilling, loaded with concrete blocks resistant to weather conditions. (English)
Property / summary: The project involves the construction of RES installations – photovoltaic installations on 4 public utility buildings in Godów Municipality: —OK in Gołkowice – 114 panels of 350 W – installation power 39.9 kW -SP in Gołkowice – 114 panels of 350 W – installation power 39.9 kW -SP in Skrzyszów – 114 panels of 350 W – installation power 39.9 kW1 – School and preschool in Godów – 69 panels of 350 W – installation power 24.15 kW Scope of works on buildings: — installation of photovoltaic panels together with construction – installation of inverter – wiring – connection of inverter and security – lightning protection – necessary overhaul works Panels will be installed on the roof of a building on ballast structures (without damaging the roof) of stainless steel. The mounting structure will consist of a clamp and brackets for the PV panel. The structure will be positioned on the roof without the use of drilling, loaded with concrete blocks resistant to weather conditions. (English) / rank
 
Normal rank
Property / summary: The project involves the construction of RES installations – photovoltaic installations on 4 public utility buildings in Godów Municipality: —OK in Gołkowice – 114 panels of 350 W – installation power 39.9 kW -SP in Gołkowice – 114 panels of 350 W – installation power 39.9 kW -SP in Skrzyszów – 114 panels of 350 W – installation power 39.9 kW1 – School and preschool in Godów – 69 panels of 350 W – installation power 24.15 kW Scope of works on buildings: — installation of photovoltaic panels together with construction – installation of inverter – wiring – connection of inverter and security – lightning protection – necessary overhaul works Panels will be installed on the roof of a building on ballast structures (without damaging the roof) of stainless steel. The mounting structure will consist of a clamp and brackets for the PV panel. The structure will be positioned on the roof without the use of drilling, loaded with concrete blocks resistant to weather conditions. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 07:23, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Photovoltaics — renewable energy source on four public utility sites in the Municipality of Godów
Project in Poland financed by DG Regio

    Statements

    0 references
    644,798.0 zloty
    0 references
    154,751.52 Euro
    13 January 2020
    0 references
    786,339.03 zloty
    0 references
    188,721.37 Euro
    13 January 2020
    0 references
    82.0 percent
    0 references
    18 September 2018
    0 references
    31 December 2020
    0 references
    GMINA GODÓW
    0 references
    0 references

    49°55'20.3"N, 18°28'41.2"E
    0 references
    Projekt zakłada budowę instalacji OZE - instalacji fotowoltaicznych na 4 budynkach użyteczności publicznej na terenie Gminy Godów: -OK w Gołkowicach - 114 paneli po 350 W – moc instalacji 39,9 kW -SP w Gołkowicach - 114 paneli po 350 W – moc instalacji 39,9 kW -SP w Skrzyszowie - 114 paneli po 350 W – moc instalacji 39,9 kW1 -Zespołu Szkolno-Przedszkolnego w Godowie - 69 paneli po 350 W – moc instalacji 24,15 kW Zakres prac na budynkach: - montaż paneli fotowoltaicznych wraz z konstrukcją - montaż falownika - wykonanie oprzewodowania - podłączenia inwertera wraz z zabezpieczeniami - wykonanie ochrony odgromowej - niezbędne prace remontowe Panele zostaną zamontowane na dachu budynku na konstrukcjach balastowych (bez uszkodzenia pokrycia dachu) ze stali nierdzewnej. Konstrukcja montażowa składać się będzie klem i uchwytów mocujących panel PV. Konstrukcja posadowiona będzie na dachu bez użycia wierceń obciążona bloczkami betonowymi odpornymi na działanie warunków atmosferycznych. (Polish)
    0 references
    The project involves the construction of RES installations – photovoltaic installations on 4 public utility buildings in Godów Municipality: —OK in Gołkowice – 114 panels of 350 W – installation power 39.9 kW -SP in Gołkowice – 114 panels of 350 W – installation power 39.9 kW -SP in Skrzyszów – 114 panels of 350 W – installation power 39.9 kW1 – School and preschool in Godów – 69 panels of 350 W – installation power 24.15 kW Scope of works on buildings: — installation of photovoltaic panels together with construction – installation of inverter – wiring – connection of inverter and security – lightning protection – necessary overhaul works Panels will be installed on the roof of a building on ballast structures (without damaging the roof) of stainless steel. The mounting structure will consist of a clamp and brackets for the PV panel. The structure will be positioned on the roof without the use of drilling, loaded with concrete blocks resistant to weather conditions. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.04.01.02-24-0669/18
    0 references