Thermal modernisation of the three public buildings, including the replacement of the source of heat and the installation of renewable energy sources in the municipality of the Radmno (Q118681): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The main objective of the project is a reduction in final/primary energy consumption, a reduction in the cost of generating heat and electricity in the construction project, the production of electricity from RES and the reduction of atmospheric pollutants. ZS in Laami, ZS in Ostrów, ZS Korczowa building in Młnachch.In ZS, in Łazko, is designed to heat up the floor to 482.00 m² — for heating — 482.00 m² — for heating the floor on land — 524.6 ...)
(‎Created claim: summary (P836): The main objective of the project is to reduce final/primary energy consumption, reduce the costs of heat and electricity generation in the buildings covered by the project, generation of electricity/warm energy from RES and reduce the amount of pollutants into the atmosphere. In the ZS in Łazy it is planned:-increasing floor warming under the attic-482.00 m²-warming of the outer walls.-524.6 m²-increase of flooring on the ground-482.00 m²-moder...)
Property / summary
 
The main objective of the project is to reduce final/primary energy consumption, reduce the costs of heat and electricity generation in the buildings covered by the project, generation of electricity/warm energy from RES and reduce the amount of pollutants into the atmosphere. In the ZS in Łazy it is planned:-increasing floor warming under the attic-482.00 m²-warming of the outer walls.-524.6 m²-increase of flooring on the ground-482.00 m²-modernisation of inst. heating together with the installation of a boiler for biomass 64 sq.m. 112,82 m² and doors with total area. 17.84 m²-assembly of PV panels with a capacity of 3.08kWW ZS in Ostrów is planned for:-exchange of windows with total area. 308,62 m² and doors with total area. 20.20 m² floor warming in the area of 63.50 m²-conditioning of the roofs-696.5 m²-warming of the outer walls.-1452.20 m²-heated floor warming on land-1083.50 m²-upgrading of the heating in 17.2 sq. of energy with assembly of the cascade of 2 condensation boilers, each with a power 100 kW-assembly of PV panels of 4,20 kW-inst. (English)
Property / summary: The main objective of the project is to reduce final/primary energy consumption, reduce the costs of heat and electricity generation in the buildings covered by the project, generation of electricity/warm energy from RES and reduce the amount of pollutants into the atmosphere. In the ZS in Łazy it is planned:-increasing floor warming under the attic-482.00 m²-warming of the outer walls.-524.6 m²-increase of flooring on the ground-482.00 m²-modernisation of inst. heating together with the installation of a boiler for biomass 64 sq.m. 112,82 m² and doors with total area. 17.84 m²-assembly of PV panels with a capacity of 3.08kWW ZS in Ostrów is planned for:-exchange of windows with total area. 308,62 m² and doors with total area. 20.20 m² floor warming in the area of 63.50 m²-conditioning of the roofs-696.5 m²-warming of the outer walls.-1452.20 m²-heated floor warming on land-1083.50 m²-upgrading of the heating in 17.2 sq. of energy with assembly of the cascade of 2 condensation boilers, each with a power 100 kW-assembly of PV panels of 4,20 kW-inst. (English) / rank
 
Normal rank
Property / summary: The main objective of the project is to reduce final/primary energy consumption, reduce the costs of heat and electricity generation in the buildings covered by the project, generation of electricity/warm energy from RES and reduce the amount of pollutants into the atmosphere. In the ZS in Łazy it is planned:-increasing floor warming under the attic-482.00 m²-warming of the outer walls.-524.6 m²-increase of flooring on the ground-482.00 m²-modernisation of inst. heating together with the installation of a boiler for biomass 64 sq.m. 112,82 m² and doors with total area. 17.84 m²-assembly of PV panels with a capacity of 3.08kWW ZS in Ostrów is planned for:-exchange of windows with total area. 308,62 m² and doors with total area. 20.20 m² floor warming in the area of 63.50 m²-conditioning of the roofs-696.5 m²-warming of the outer walls.-1452.20 m²-heated floor warming on land-1083.50 m²-upgrading of the heating in 17.2 sq. of energy with assembly of the cascade of 2 condensation boilers, each with a power 100 kW-assembly of PV panels of 4,20 kW-inst. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:51, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the three public buildings, including the replacement of the source of heat and the installation of renewable energy sources in the municipality of the Radmno
Project in Poland financed by DG Regio

    Statements

    0 references
    2,238,155.41 zloty
    0 references
    537,157.30 Euro
    13 January 2020
    0 references
    2,633,124.08 zloty
    0 references
    631,949.78 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 December 2015
    0 references
    31 December 2017
    0 references
    GMINA RADYMNO
    0 references
    0 references
    Głównym celem realizacji projektu jest zmniejszenie zużycia energii końcowej/pierwotnej, obniżenie kosztów wytwarzania energii cieplnej oraz energii elektr. w bud. objętych przedmiotowym projektem, wytwarzanie energii elektr./cieplnej z OZE oraz zmniejszenie ilości zanieczyszczeń do atmosfery.Projekt dot. termomodernizacji wraz z wymianą źródła ciepła oraz montażem OZE 3 bud. użyt. publ.: ZS w Łazach, ZS w Ostrowie, ZS Korczowa budynek w Młynach.W ZS w Łazach zaplanowano:-docieplenie stropu pod nieogrz. poddaszem-482,00m2-docieplenie ścian zewn.-524,6m2-docieplenie podłóg na gruncie-482,00m2-modernizację inst. ogrzewania wraz z montażem kotła na biomasę o mocy 100kW-wymianę okien o łącznej pow.181,64m2 i drzwi o łącznej pow.11,60m2-montaż paneli PV o mocy 3,36kWW ZS Korczowa, bud. w Młynach zaplanowano:-docieplenie stropu pod nieogrz. poddaszem-443,00m2-docieplenie ścian zewn.-611,60m2-docieplenie podłóg na gruncie-405,80m2-modernizację inst. ogrzewania wraz z montażem kotła na biomasę o mocy 60kW-wymianę okien o łącznej pow. 112,82m2 i drzwi o łącznej pow. 17,84m2-montaż paneli PV o mocy 3,08kWW ZS w Ostrowie zaplanowano:-wymianę okien o łącznej pow. 308,62m2 i drzwi o łącznej pow. 13,51m2-docieplenie stropu pod nieogrz. poddaszem-472,3m2-docieplenie dachów-696,5m2-docieplenie ścian zewn.-1452,20m2-docieplenie podłóg na gruncie-1083,50m2-modernizację inst. ogrzewania wraz z montażem kaskady 2 kotłów gazowych kondensacyjnych, każdy o mocy 100kW-montaż paneli PV o mocy 4,20kW-inst. kol. słon. o mocy 6,61kWRealizacja inwest. pozwoli na uzyskanie:a)w ZS w Łazach wskaźnika EP na poziomie 47,55kWh/(m2*rok)oraz zostanie zmniejszone zapotrzeb. na zużycie energii o 60,79%b)w ZS w Korczowej, budynek w Młynach wskaźnika EP na poziomie 59,93kWh/(m2*rok) oraz zostanie zmniejszone zapotrzeb. na zużycie energii o 63,17%c)w ZS w Ostrowie wskaźnika EP na poziomie 80,62kWh/(m2*rok) oraz zostanie zmniejszone zapotrzebowanie na zużycie energii o 55,69% (Polish)
    0 references
    The main objective of the project is to reduce final/primary energy consumption, reduce the costs of heat and electricity generation in the buildings covered by the project, generation of electricity/warm energy from RES and reduce the amount of pollutants into the atmosphere. In the ZS in Łazy it is planned:-increasing floor warming under the attic-482.00 m²-warming of the outer walls.-524.6 m²-increase of flooring on the ground-482.00 m²-modernisation of inst. heating together with the installation of a boiler for biomass 64 sq.m. 112,82 m² and doors with total area. 17.84 m²-assembly of PV panels with a capacity of 3.08kWW ZS in Ostrów is planned for:-exchange of windows with total area. 308,62 m² and doors with total area. 20.20 m² floor warming in the area of 63.50 m²-conditioning of the roofs-696.5 m²-warming of the outer walls.-1452.20 m²-heated floor warming on land-1083.50 m²-upgrading of the heating in 17.2 sq. of energy with assembly of the cascade of 2 condensation boilers, each with a power 100 kW-assembly of PV panels of 4,20 kW-inst. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.02.00-18-0047/16
    0 references