Energy modernisation of public buildings in Chmielnik Municipality (Q118664): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: remove_english_label) |
(Changed label, description and/or aliases in 1 language: translated_label) |
||
label / en | label / en | ||
Energy modernisation of public buildings in Chmielnik Municipality |
Revision as of 16:51, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy modernisation of public buildings in Chmielnik Municipality |
Project in Poland financed by DG Regio |
Statements
1,804,299.75 zloty
0 references
2,122,705.62 zloty
0 references
85.0 percent
0 references
31 March 2017
0 references
29 December 2017
0 references
GMINA CHMIELNIK
0 references
Celem projektu jest poprawa efektywności energetycznej budynków użyteczności publicznej tj. Szk. Podst. w Chmielniku, Remizy OSP w Błędowej Tyczyńskiej, Szk. Podst. w Woli Rafałowskiej, Domu Ludowego w Woli Rafałowskiej, Szk. Podst. w Zabratówce oraz Domu Strażaka w Zabratówce. W ramach projektu we wszystkich w/w budynkach wyk. zostanie izolacja termiczna przegród ścian zew., wymienione zostanie oświetlenie na energooszczędne oraz zamontowany zostanie zestaw mikroźródła OZE -instalacja fotowoltaiczna. Ponadto, w bud. Szk. Podst. w Chmielniku - wykonana zostanie dociep. dachu, moder. istniejącej ins. grzewczej wraz z wym. kotła oraz wymienione zostaną drzwi zew. W bud. OSP w Błędowej Tyczyńskiej planuje się wyk. izol. podłogi na gruncie, doc. stropu wew. poddasza, wymianę okien, luksferów drzwi i bramy garaż., syst. grzewczego na CO i CWU. Bud. Szk. Podst. w W. Rafałowskiej - zostaną wymienione drzwi zew. i okna, zmoder. zostanie inst. CO wraz z wym. kotła, doc. stropy wew. nad piwnicą, poddaszem oraz w łączniku. Bud. Domu Ludowego w W. Rafałowskiej – planuje się wyk. izol. podłogi na gruncie, docieplenie stropu nad piwnicą i poddaszem oraz śc. wew. wymianę drzwi zew. oraz modern. ins. CO wraz montażem kotła. Szk. Podst. w Zabratówce – doc. strop wew. pod poddaszem, wymienione zostaną drzwi zew. a także zmoder. zostanie inst. CO wraz z wym. kotła. Dom Strażaka w Zabratówce-, dociep. podłogi na gruncie, stropu podcienia oraz stropodachu, wyk. zostanie modern. ins. CWU i CO wraz z mont. kotła a także wymienione zostaną drzwi zewnętrzne oraz bramę garażową. W wyniku realizacji projektu nastąpi poprawa warunków użytkowania w/w bud. oraz poprawa jakości powietrza, redukcji ulegną także koszty zaopatrzenia bud. w energię. W ramach projektu zmodernizowane zostanie 6 budynków, wybudowane zostanie 6 jednostek wytwarzania energii elektrycznej z OZE, oraz zmodernizowane zostanie 6 źródeł ciepła. (Polish)
0 references
The aim of the project is to improve the energy efficiency of public buildings, i.e. It’s a glass. Podst. in Chmielnik, OSP firehouse in Błędowa Tyczyńska, Szk. Podst. in Wola Rafałowska, People’s House in Wola Rafałowska, Szk. Subst. in Zabratówka and the Fireman’s House in Zaratówka. As part of the project, all above-mentioned buildings will be insulated with thermal insulation of the wall partitions, the lighting for energy-saving buildings will be replaced and a set of micro-sources of RES – photovoltaic installation will be installed. In addition, in the building. It’s a glass. Subst. in Chmielnik – roof insulation, moder. of existing heating ins. together with the boiler will be made and the call doors will be replaced. In the bud. OSP in Błędowa Tyczyńska is planned for isolate floor on the ground, doc. ceiling inside the above-mentioned attic, replacement of windows, luxphery doors and garage gates, heating system for CO and CWU. Bud, it’s Bud. It’s a glass. Podst. w W. Rafałowska – the door and windows will be replaced, zmoder. will be inst. Which, together with the boiler, doc. ceilings above the basement, attic and in the connector. Bud, it’s Bud. The People’s House in W. Rafałowska – plans to isolate floor on the ground, warming of the ceiling above the basement and attic, as well as exchanging doors of call and modern ins. Which, together with the installation of the boiler. It’s a glass. Subst. in Zabratówka – doc. ceiling under the attic, the so-called door and zmoder. will be replaced by the inst. What with the boiler. The Fireman’s House in Zabratówka-, the floor on the ground, the ceiling of the arcade and the ceiling, will be modern. ins. CWU and CO together with the boiler assembly and the external doors and garage door will be replaced. As a result of the project, the conditions of use of the above mentioned buildings will be improved and air quality improved, the costs of energy supply will also be reduced. As part of the project, 6 buildings will be modernised, 6 units of electricity generation from RES will be built, and 6 heat sources will be modernised. (English)
20 October 2020
0 references
Identifiers
RPPK.03.02.00-18-0031/16
0 references