Energy renovation of public buildings in the municipality of Chmielnik (Q118664): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: summary (P836): The project aims to improve the energy efficiency of public buildings, i.e. SZK. In the Chmielnik subst in Chmielnik, TSO’s remnant of the faulty system, SZK. In the Willi Rakovski House of the People’s House in Wola Rakovski, SZK. Zabbrautówka Deputy, and Zakampitówka House. The project will insulate the thermal insulation of the walls of the walls into all/in the buildings with a view to energy efficiency and a set of micro-renewable energy...)
Property / summary
The project aims to improve the energy efficiency of public buildings, i.e. SZK. In the Chmielnik subst in Chmielnik, TSO’s remnant of the faulty system, SZK. In the Willi Rakovski House of the People’s House in Wola Rakovski, SZK. Zabbrautówka Deputy, and Zakampitówka House. The project will insulate the thermal insulation of the walls of the walls into all/in the buildings with a view to energy efficiency and a set of micro-renewable energy sources, a photovoltaic installation, will be installed. In addition, in the budget. SZK. The roof in the Chmielnik — your roof will be carried out, moderated by the existing heating example, together with the boiler, and the doors of the boiler will be replaced. In the budget. The TSO of the BMSc is projected to have an isolated floor on the ground, on the ground, on the floor on the floor, the replacement of windows, the barrels of the doors and gates of the garage. BAT. SZK. The Rakforist, W., will be the doors and windows of the doors and windows will be replaced. What together with the boiler, the floor pages above the basement, the lot and the link. BAT. There are plans to remove the floor on the ground, the insulation of the ceiling of the basement and the attire and the sleepness of the interior. Which, together with the installation of a boiler. SZK. In Zabłatówka, the ceiling on the ceiling, the doors will be replaced and the doors will be moderated. What together with the boiler. The building of the Strażek in Zabłatyce-, the floor on the ground, the floor of the ‘subshadow’ and the costume of the roof will be tightened. CWU and CO together with the boiler assembly shall be also replaced by an external door and a garage door. As a result of the project, the conditions for the construction of the project will improve and the air quality will be improved and the cost of supply will also be reduced. As part of the project, 6 buildings will be modernised, 6 RES electricity generation units will be built and 6 heat generators will be modernised. (English)
 
Property / summary: The project aims to improve the energy efficiency of public buildings, i.e. SZK. In the Chmielnik subst in Chmielnik, TSO’s remnant of the faulty system, SZK. In the Willi Rakovski House of the People’s House in Wola Rakovski, SZK. Zabbrautówka Deputy, and Zakampitówka House. The project will insulate the thermal insulation of the walls of the walls into all/in the buildings with a view to energy efficiency and a set of micro-renewable energy sources, a photovoltaic installation, will be installed. In addition, in the budget. SZK. The roof in the Chmielnik — your roof will be carried out, moderated by the existing heating example, together with the boiler, and the doors of the boiler will be replaced. In the budget. The TSO of the BMSc is projected to have an isolated floor on the ground, on the ground, on the floor on the floor, the replacement of windows, the barrels of the doors and gates of the garage. BAT. SZK. The Rakforist, W., will be the doors and windows of the doors and windows will be replaced. What together with the boiler, the floor pages above the basement, the lot and the link. BAT. There are plans to remove the floor on the ground, the insulation of the ceiling of the basement and the attire and the sleepness of the interior. Which, together with the installation of a boiler. SZK. In Zabłatówka, the ceiling on the ceiling, the doors will be replaced and the doors will be moderated. What together with the boiler. The building of the Strażek in Zabłatyce-, the floor on the ground, the floor of the ‘subshadow’ and the costume of the roof will be tightened. CWU and CO together with the boiler assembly shall be also replaced by an external door and a garage door. As a result of the project, the conditions for the construction of the project will improve and the air quality will be improved and the cost of supply will also be reduced. As part of the project, 6 buildings will be modernised, 6 RES electricity generation units will be built and 6 heat generators will be modernised. (English) / rank
Normal rank
 

Revision as of 16:51, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy renovation of public buildings in the municipality of Chmielnik
Project in Poland financed by DG Regio

    Statements

    0 references
    1,804,299.75 zloty
    0 references
    433,031.94 Euro
    13 January 2020
    0 references
    2,122,705.62 zloty
    0 references
    509,449.35 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    31 March 2017
    0 references
    29 December 2017
    0 references
    GMINA CHMIELNIK
    0 references
    0 references
    Celem projektu jest poprawa efektywności energetycznej budynków użyteczności publicznej tj. Szk. Podst. w Chmielniku, Remizy OSP w Błędowej Tyczyńskiej, Szk. Podst. w Woli Rafałowskiej, Domu Ludowego w Woli Rafałowskiej, Szk. Podst. w Zabratówce oraz Domu Strażaka w Zabratówce. W ramach projektu we wszystkich w/w budynkach wyk. zostanie izolacja termiczna przegród ścian zew., wymienione zostanie oświetlenie na energooszczędne oraz zamontowany zostanie zestaw mikroźródła OZE -instalacja fotowoltaiczna. Ponadto, w bud. Szk. Podst. w Chmielniku - wykonana zostanie dociep. dachu, moder. istniejącej ins. grzewczej wraz z wym. kotła oraz wymienione zostaną drzwi zew. W bud. OSP w Błędowej Tyczyńskiej planuje się wyk. izol. podłogi na gruncie, doc. stropu wew. poddasza, wymianę okien, luksferów drzwi i bramy garaż., syst. grzewczego na CO i CWU. Bud. Szk. Podst. w W. Rafałowskiej - zostaną wymienione drzwi zew. i okna, zmoder. zostanie inst. CO wraz z wym. kotła, doc. stropy wew. nad piwnicą, poddaszem oraz w łączniku. Bud. Domu Ludowego w W. Rafałowskiej – planuje się wyk. izol. podłogi na gruncie, docieplenie stropu nad piwnicą i poddaszem oraz śc. wew. wymianę drzwi zew. oraz modern. ins. CO wraz montażem kotła. Szk. Podst. w Zabratówce – doc. strop wew. pod poddaszem, wymienione zostaną drzwi zew. a także zmoder. zostanie inst. CO wraz z wym. kotła. Dom Strażaka w Zabratówce-, dociep. podłogi na gruncie, stropu podcienia oraz stropodachu, wyk. zostanie modern. ins. CWU i CO wraz z mont. kotła a także wymienione zostaną drzwi zewnętrzne oraz bramę garażową. W wyniku realizacji projektu nastąpi poprawa warunków użytkowania w/w bud. oraz poprawa jakości powietrza, redukcji ulegną także koszty zaopatrzenia bud. w energię. W ramach projektu zmodernizowane zostanie 6 budynków, wybudowane zostanie 6 jednostek wytwarzania energii elektrycznej z OZE, oraz zmodernizowane zostanie 6 źródeł ciepła. (Polish)
    0 references

    Identifiers

    RPPK.03.02.00-18-0031/16
    0 references