“Thermal upgrading of public utility buildings — Station No 6 in Stalowa Wola” (Q118636): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The main purpose of the project is to improve the energy efficiency of the building No 6 of the Stalowa Wola building with a usable surface area of 1 257.35 m². The building tool is a powerful tool for achieving this goal and will reduce energy consumption. Achievement of objectives shall be measured by means of indicators: The amount of heat energy saved 532,19 GJ/year, the electricity saved 4.12 MWh/year, the estimated annual decrease in gre...)
Property / summary
The main purpose of the project is to improve the energy efficiency of the building No 6 of the Stalowa Wola building with a usable surface area of 1 257.35 m². The building tool is a powerful tool for achieving this goal and will reduce energy consumption. Achievement of objectives shall be measured by means of indicators: The amount of heat energy saved 532,19 GJ/year, the electricity saved 4.12 MWh/year, the estimated annual decrease in greenhouse gas emissions (CI34) 43.93 t CO2/rok.Zakres of the project includes: the modernisation of the heating system carried out in 2017 (installation of steel pipes, plate radiators, valves), a planned thermal modernisation covering the insulation of the roof and walls, including the replacement of windows and external doors and the upgrading of lighting inside the building (replacement of LED bulbs). heat — systemic heat — is not being mired. (English)
 
Property / summary: The main purpose of the project is to improve the energy efficiency of the building No 6 of the Stalowa Wola building with a usable surface area of 1 257.35 m². The building tool is a powerful tool for achieving this goal and will reduce energy consumption. Achievement of objectives shall be measured by means of indicators: The amount of heat energy saved 532,19 GJ/year, the electricity saved 4.12 MWh/year, the estimated annual decrease in greenhouse gas emissions (CI34) 43.93 t CO2/rok.Zakres of the project includes: the modernisation of the heating system carried out in 2017 (installation of steel pipes, plate radiators, valves), a planned thermal modernisation covering the insulation of the roof and walls, including the replacement of windows and external doors and the upgrading of lighting inside the building (replacement of LED bulbs). heat — systemic heat — is not being mired. (English) / rank
Normal rank
 

Revision as of 16:33, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Thermal upgrading of public utility buildings — Station No 6 in Stalowa Wola”
Project in Poland financed by DG Regio

    Statements

    0 references
    543,257.44 zloty
    0 references
    130,381.79 Euro
    13 January 2020
    0 references
    639,126.43 zloty
    0 references
    153,390.34 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    27 October 2017
    0 references
    30 November 2019
    0 references
    GMINA STALOWA WOLA
    0 references
    0 references
    Celem głównym projektu jest poprawa efektywności energetycznej budynku Przychodni nr 6 w Stalowej Woli o powierzchni użytkowej 1257,35 m2. Narzędziem osiągania tego celu jest głęboka termomodernizacja budynku, która pozwoli na zmniejszenie zużycia energii. Osiąganie celów mierzone będzie poprzez wskaźniki: Ilość zaoszczędzonej energii cieplnej 532,19 GJ/rok, Ilość zaoszczędzonej energii elektrycznej 4,12 MWh/rok, Szacowany roczny spadek emisji gazów cieplarnianych (CI34) 43,93 t CO2/rok.Zakres przedsięwzięcia obejmuje: zrealizowaną w 2017 r. modernizację instalacji grzewczej (instalacja z rur stalowych, grzejniki płytowe, zawory), planowaną termomodernizację obejmującą docieplenie stropodachu oraz ścian wraz z wymianą okien i drzwi zewnętrznych oraz modernizację oświetlenia wewnątrz budynku (wymiana świetlówek na LED).Źródło ciepła – ciepło systemowe – nie ulega zmianie.Zadaniom rzeczowym towarzyszą zadania związane z przygotowaniem audytu energetycznego powykonawczego, dwóch ekspertyz ornitologicznych i chiropterologicznych oraz promocją projektu. (Polish)
    0 references

    Identifiers

    RPPK.03.02.00-18-0012/18
    0 references