PV installation for INTOP Tarnobrzeg Sp. z o.o (Q118558): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The objectives of the project are 1. Increase of electricity production by 177 531 Kwh/year in 2019 from the newly built RES installation in Stale by the installation of a 179,2 kWp photovoltaic installation in 2018. 2. Reduction of CO2 emissions by 146,46 tonnes/year in 2019 The project concerns the construction of a photovoltaic power plant on the roofs of the Applicant’s buildings: the power of a photovoltaic power plant: 179,2 kWipQuantity...) |
||
Property / summary | |||
Property / summary: The objectives of the project are 1. Increase of electricity production by 177 531 Kwh/year in 2019 from the newly built RES installation in Stale by the installation of a 179,2 kWp photovoltaic installation in 2018. 2. Reduction of CO2 emissions by 146,46 tonnes/year in 2019 The project concerns the construction of a photovoltaic power plant on the roofs of the Applicant’s buildings: the power of a photovoltaic power plant: 179,2 kWipQuantity of electricity produced: 177 531 Kw.. basic characteristics of the photovoltaic power plant: 1. Polycrystalline panels 640 unit 2. structure supports 180 kpl.3. Inverter 6 t.4. cabling DC 2300 b5. Switchboard DC 6 unit 6. Switchboard AC 6 unit 7. Installation of ground 6 space (8). Cabling AC 1 kpl.Project includes the construction of an NN (internal cable line on the NN PV line — the existing cable connector on the Applicant). (English) / rank | |||
Revision as of 16:31, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | PV installation for INTOP Tarnobrzeg Sp. z o.o |
Project in Poland financed by DG Regio |
Statements
666,416.99 zloty
0 references
784,020.0 zloty
0 references
85.0 percent
0 references
1 August 2017
0 references
30 June 2020
0 references
INTOP TARNOBRZEG SP. Z O.O.
0 references
Celami projektu są:1. Zwiększenie produkcji energii elektrycznej o 177 531 Kwh/rok w 2019r. z nowo wybudowanej instalacji wykorzystującej OZE w miejscowości Stale poprzez montaż instalacji fotowoltaicznej o mocy 179,2 kWp w 2018r. 2. Zmniejszenie emisji CO2 o 146,46 tony/rok w 2019r.Projekt dotyczy budowy elektrowni fotowoltaicznej na dachach budynków Wnioskodawcy:Moc elektrowni fotowoltaicznej: 179,2 kWpIlość produkowanej energii elektrycznej: 177 531 Kwh/rok.Podstawowe parametry elektrowni fotowoltaicznej:1. Panele polikrystaliczne 640 szt.2. konstrukcja wsporcza 180 kpl.3. Falownik 6 szt.4. okablowanie DC 2300 mb5. Rozdzielnica DC 6 szt.6. Rozdzielnica AC 6 szt.7. Instalacja uziemiająca 6 szt.8. Okablowanie AC 1 kpl.Projekt obejmuje budowę przyłącza nN (wewnętrznej kablowej linii zasilającej na trasie rozdzielnia nN PV – istniejące u Wnioskodawcy złącze kablowe). (Polish)
0 references
Identifiers
RPPK.03.01.00-18-0409/17
0 references