(‎Removed claim: summary (P836): The project aims at generating energy from renewable sources in order to increase the production of electricity from renewable sources and thus to reduce the greenhouse gas emissions to the atmosphere. The detailed objectives of the project are set out in Part 2.1 of the Feasibility Study. The project aims to build new infrastructure on the basis of existing buildings and land owned by the project partners’ companies. However, the project conc...)
(‎Created claim: summary (P836): The aim of the project is to generate energy from renewable sources The general objective of the project is to increase the production of electricity from renewable sources and thus reduce greenhouse gas emissions into the atmosphere. Detailed objectives of the project are presented in section 2.1 of the Feasibility Study. The object of the project is the construction of new infrastructure, however, based on existing buildings and land belonging...)
Property / summary
 
The aim of the project is to generate energy from renewable sources The general objective of the project is to increase the production of electricity from renewable sources and thus reduce greenhouse gas emissions into the atmosphere. Detailed objectives of the project are presented in section 2.1 of the Feasibility Study. The object of the project is the construction of new infrastructure, however, based on existing buildings and land belonging to the companies of the partners of the project. The project concerns the construction of new infrastructure, however, based on existing properties owned by the partners of the project. These properties are located in the municipalities of Mielec, Tuszyn Narodowy and Kolbuszowa. The subject of the project is the assembly of systems consisting of polycrystalline modules for the production of electricity (with a total installed capacity of 0,19 MW). The planned installation consists of a total of 697 modules of photovoltaic panel modules with a single 280 W panel, together with support structure, all necessary accessories and wiring. A total of six installations will be created for five entities. The installations will be connected to the existing power grid. The basic elements of the planned installation are: — Photovoltaic modules, inverters, mounting systems – roof and ground, wiring, electric switchgear, hermetic housings, monitoring system. The total installed power is the sum of the power of each installation, which in turn represents the product of the number of panels and the power of a single panel. RSM – Number of modules (140x 285 W= 39.9 kWp). Miel MET – Number of modules (123 x 325 W = 39,97kWp). Bakery Necessary – Number of modules (134 x 285 W= 38.19kWp). Hook – Number of modules (70 x 285 W = 19.95 kWp). The carcass: Installation No 1 – Number of modules (116 x 325 W = 37.70 kWp), Installation No 2 – Number of modules (61 x 325 W= 19,82 kWp). All of the installations are micro-installations. They will be connected to the energetic network within the existing connections for the property. Completion of the implementation is planned at 31.05. (English)
Property / summary: The aim of the project is to generate energy from renewable sources The general objective of the project is to increase the production of electricity from renewable sources and thus reduce greenhouse gas emissions into the atmosphere. Detailed objectives of the project are presented in section 2.1 of the Feasibility Study. The object of the project is the construction of new infrastructure, however, based on existing buildings and land belonging to the companies of the partners of the project. The project concerns the construction of new infrastructure, however, based on existing properties owned by the partners of the project. These properties are located in the municipalities of Mielec, Tuszyn Narodowy and Kolbuszowa. The subject of the project is the assembly of systems consisting of polycrystalline modules for the production of electricity (with a total installed capacity of 0,19 MW). The planned installation consists of a total of 697 modules of photovoltaic panel modules with a single 280 W panel, together with support structure, all necessary accessories and wiring. A total of six installations will be created for five entities. The installations will be connected to the existing power grid. The basic elements of the planned installation are: — Photovoltaic modules, inverters, mounting systems – roof and ground, wiring, electric switchgear, hermetic housings, monitoring system. The total installed power is the sum of the power of each installation, which in turn represents the product of the number of panels and the power of a single panel. RSM – Number of modules (140x 285 W= 39.9 kWp). Miel MET – Number of modules (123 x 325 W = 39,97kWp). Bakery Necessary – Number of modules (134 x 285 W= 38.19kWp). Hook – Number of modules (70 x 285 W = 19.95 kWp). The carcass: Installation No 1 – Number of modules (116 x 325 W = 37.70 kWp), Installation No 2 – Number of modules (61 x 325 W= 19,82 kWp). All of the installations are micro-installations. They will be connected to the energetic network within the existing connections for the property. Completion of the implementation is planned at 31.05. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to generate energy from renewable sources The general objective of the project is to increase the production of electricity from renewable sources and thus reduce greenhouse gas emissions into the atmosphere. Detailed objectives of the project are presented in section 2.1 of the Feasibility Study. The object of the project is the construction of new infrastructure, however, based on existing buildings and land belonging to the companies of the partners of the project. The project concerns the construction of new infrastructure, however, based on existing properties owned by the partners of the project. These properties are located in the municipalities of Mielec, Tuszyn Narodowy and Kolbuszowa. The subject of the project is the assembly of systems consisting of polycrystalline modules for the production of electricity (with a total installed capacity of 0,19 MW). The planned installation consists of a total of 697 modules of photovoltaic panel modules with a single 280 W panel, together with support structure, all necessary accessories and wiring. A total of six installations will be created for five entities. The installations will be connected to the existing power grid. The basic elements of the planned installation are: — Photovoltaic modules, inverters, mounting systems – roof and ground, wiring, electric switchgear, hermetic housings, monitoring system. The total installed power is the sum of the power of each installation, which in turn represents the product of the number of panels and the power of a single panel. RSM – Number of modules (140x 285 W= 39.9 kWp). Miel MET – Number of modules (123 x 325 W = 39,97kWp). Bakery Necessary – Number of modules (134 x 285 W= 38.19kWp). Hook – Number of modules (70 x 285 W = 19.95 kWp). The carcass: Installation No 1 – Number of modules (116 x 325 W = 37.70 kWp), Installation No 2 – Number of modules (61 x 325 W= 19,82 kWp). All of the installations are micro-installations. They will be connected to the energetic network within the existing connections for the property. Completion of the implementation is planned at 31.05. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:22, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of PV installations and associated infrastructure in the project partners’ enterprises.
Project in Poland financed by DG Regio

    Statements

    0 references
    646,955.39 zloty
    0 references
    155,269.29 Euro
    13 January 2020
    0 references
    761,124.0 zloty
    0 references
    182,669.76 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2017
    0 references
    31 May 2019
    0 references
    ZAKŁAD PRODUKCJI MASZYN I URZĄDZEŃ RSM SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Celem projektu jest wytwarzanie energii ze źródeł odnawialnych Ogólnym celem projektu jest zwiększenie produkcji energii elektrycznej ze źródeł odnawialnych a przez to zmniejszenie emisji gazów cieplarnianych do atmosfery. Szczegółowe cele projektu zostały przedstawione w części 2.1 Studium Wykonalności. Przedmiotem projektu jest budowa nowej infrastruktury jednak w oparciu o istniejące budynki i grunty należące do firm partnerów projektu. Projekt dotyczy budowy nowej infrastruktury jednak w oparciu o istniejące nieruchomości będących w posiadaniu firm partnerów projektu. Nieruchomości te są położone w gminach Mielec, Tuszyn Narodowy i Kolbuszowa. Przedmiotem projektu jest montaż systemów składających się z modułów polikrystalicznych do produkcji energii elektrycznej (o łącznej mocy zainstalowanej 0,19 MW). W skład planowanej instalacji wchodzi łącznie 697 szt. modułów paneli fotowoltaicznych o mocy pojedynczego panelu 280 W, wraz z konstrukcją wsporczą, całym niezbędnym osprzętem i okablowaniem. Łącznie powstanie sześć instalacji dla pięciu podmiotów. Instalacje zostaną przyłączone do istniejącej sieci energetycznej. Podstawowe elementy planowanej instalacji to: - Moduły fotowoltaiczne, falowniki, systemy montażowe – dachowe i gruntowe, okablowanie, rozdzielnice elektryczne, obudowy hermetyczne, system monitoringu. Łączna moc zainstalowana stanowi sumę moce każdej instalacji, która stanowi z kolei iloczyn liczby paneli i mocy pojedynczego panelu. RSM - Liczba modułów (140x 285W= 39,9 kWp). Miel MET - Liczba modułów (123 x 325W = 39,97kWp). Piekarnia Konieczny - Liczba modułów (134 x 285 W= 38,19kWp). Hoke - Liczba modułów (70 x 285 W= 19,95 kWp). Karkut: Instalacja nr 1 - Liczba modułów (116 x 325 W= 37,70 kWp), Instalacja nr 2 - Liczba modułów (61 x 325 W= 19,82 kWp). Wszystkie z instalacji są mikroinstalacjami. Zostaną przyłączone do sieci energ. w ramach już istniejących dla danej nieruchomości przyłączy. Zakończenie realizacji planowane jest na 31.05. (Polish)
    0 references
    The aim of the project is to generate energy from renewable sources The general objective of the project is to increase the production of electricity from renewable sources and thus reduce greenhouse gas emissions into the atmosphere. Detailed objectives of the project are presented in section 2.1 of the Feasibility Study. The object of the project is the construction of new infrastructure, however, based on existing buildings and land belonging to the companies of the partners of the project. The project concerns the construction of new infrastructure, however, based on existing properties owned by the partners of the project. These properties are located in the municipalities of Mielec, Tuszyn Narodowy and Kolbuszowa. The subject of the project is the assembly of systems consisting of polycrystalline modules for the production of electricity (with a total installed capacity of 0,19 MW). The planned installation consists of a total of 697 modules of photovoltaic panel modules with a single 280 W panel, together with support structure, all necessary accessories and wiring. A total of six installations will be created for five entities. The installations will be connected to the existing power grid. The basic elements of the planned installation are: — Photovoltaic modules, inverters, mounting systems – roof and ground, wiring, electric switchgear, hermetic housings, monitoring system. The total installed power is the sum of the power of each installation, which in turn represents the product of the number of panels and the power of a single panel. RSM – Number of modules (140x 285 W= 39.9 kWp). Miel MET – Number of modules (123 x 325 W = 39,97kWp). Bakery Necessary – Number of modules (134 x 285 W= 38.19kWp). Hook – Number of modules (70 x 285 W = 19.95 kWp). The carcass: Installation No 1 – Number of modules (116 x 325 W = 37.70 kWp), Installation No 2 – Number of modules (61 x 325 W= 19,82 kWp). All of the installations are micro-installations. They will be connected to the energetic network within the existing connections for the property. Completion of the implementation is planned at 31.05. (English)
    20 October 2020
    0 references