Western Junction to Western Europe A-4 — Straszęcin — Debica (Q119056): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The general objective of the project is to improve communication links and public transport systems in Podkarpackie Province by increasing the communication accessibility of Dębicki District. To this end, the town of Jewish people will be built with a link to the West of A4 Debica — West. The connecting factor will be complemented by deficiencies in the road network, resulting in an increase in traffic flow and availability to the higher road...)
Property / summary
The general objective of the project is to improve communication links and public transport systems in Podkarpackie Province by increasing the communication accessibility of Dębicki District. To this end, the town of Jewish people will be built with a link to the West of A4 Debica — West. The connecting factor will be complemented by deficiencies in the road network, resulting in an increase in traffic flow and availability to the higher road network and safety. the scope of the investment task includes:• construction of a new section of distance around the road. 1.80 km with technical parameters as for Class G and a pavement structure adapted to the movement category KR4, along with the construction of pavements and paths for cycling, street lighting and the road drainage system,• the construction of a roundabout at the points of integration of the proposed connector to the district road No 1180R and interchange of the A4 Dębica-West interchange, and the district road No 1290R with the adjustment of the access to the roundabout,• correction of the road transport road No 1180R (section 0) to the planned roundabout over the length. 990 m (beginning at km 3 + 440): 830 m from the roundabout towards Dęica roundabout, 160 m from the roundabout towards ZJewish,• Adjustment of the road leading to the A4 Dębica-West motorway junction to the planned roundabout over its length. 56 m from the roundabout mean• adjustment of the district road No 1290R to the planned roundabout over the length 405 m (beginning at km 1 + 770,70): by 130 m from the roundabout towards Dęica roundabout, 275 m from the roundabout towards Struszacain.An important factor determining the necessity of the planned project is the creation of the necessary road infrastructure to channel car traffic from the Dębica-West interchange of the A4 motorway, which will improve the traffic organisation and the journey time on the sections covered by the investment. The link will be built with a view to improving road traffic and ensuring its safety, as well as ensuring safety for pedestrians and cyclists. (English)
 
Property / summary: The general objective of the project is to improve communication links and public transport systems in Podkarpackie Province by increasing the communication accessibility of Dębicki District. To this end, the town of Jewish people will be built with a link to the West of A4 Debica — West. The connecting factor will be complemented by deficiencies in the road network, resulting in an increase in traffic flow and availability to the higher road network and safety. the scope of the investment task includes:• construction of a new section of distance around the road. 1.80 km with technical parameters as for Class G and a pavement structure adapted to the movement category KR4, along with the construction of pavements and paths for cycling, street lighting and the road drainage system,• the construction of a roundabout at the points of integration of the proposed connector to the district road No 1180R and interchange of the A4 Dębica-West interchange, and the district road No 1290R with the adjustment of the access to the roundabout,• correction of the road transport road No 1180R (section 0) to the planned roundabout over the length. 990 m (beginning at km 3 + 440): 830 m from the roundabout towards Dęica roundabout, 160 m from the roundabout towards ZJewish,• Adjustment of the road leading to the A4 Dębica-West motorway junction to the planned roundabout over its length. 56 m from the roundabout mean• adjustment of the district road No 1290R to the planned roundabout over the length 405 m (beginning at km 1 + 770,70): by 130 m from the roundabout towards Dęica roundabout, 275 m from the roundabout towards Struszacain.An important factor determining the necessity of the planned project is the creation of the necessary road infrastructure to channel car traffic from the Dębica-West interchange of the A4 motorway, which will improve the traffic organisation and the journey time on the sections covered by the investment. The link will be built with a view to improving road traffic and ensuring its safety, as well as ensuring safety for pedestrians and cyclists. (English) / rank
Normal rank
 

Revision as of 16:11, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Western Junction to Western Europe A-4 — Straszęcin — Debica
Project in Poland financed by DG Regio

    Statements

    0 references
    14,738,153.22 zloty
    0 references
    3,537,156.77 Euro
    13 January 2020
    0 references
    17,339,003.82 zloty
    0 references
    4,161,360.92 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 March 2017
    0 references
    7 December 2018
    0 references
    POWIAT DĘBICKI
    0 references
    Celem ogólnym projektu jest poprawa powiązań komunikacyjnych i systemu komunikacji publicznej w województwie podkarpackim poprzez zwiększenie dostępności komunikacyjnej Powiatu Dębickiego. W tym celu na terenie Gminy Żyraków wybudowany zostanie łącznik do Węzła Zachodniego A4 Dębica – Zachód. Łącznik uzupełni braki w sieci drogowej, przełoży się na wzrost płynności ruchu i dostępności do sieci dróg wyższego rzędu oraz poprawę bezpieczeństwa.Zakres rzeczowy zadania inwestycyjnego obejmuje:• budowę nowego odcinka drogi długości ok. 1,80 km o parametrach technicznych jak dla drogi klasy G i konstrukcji nawierzchni dostosowanej do kategorii ruchu KR4, wraz z budową chodników i ścieżki rowerowej, oświetlenia ulicznego oraz systemu odwodnienia drogi,• budowę skrzyżowań typu rondo w miejscach włączenia projektowanego łącznika do drogi powiatowej nr 1180R i węzła A4 Dębica-Zachód, oraz drogi powiatowej nr 1290R wraz korektą dojazdów do rond,• korekta dojazdu drogi powiatowej nr 1180R (odcinek 0) do projektowanego ronda na długości ok. 990m (początek w km 3+440):o 830m od centrum ronda w kierunku Dębicy,o 160m od centrum ronda w kierunku Żyrakowa,• korekta dojazdu drogi prowadzącej do węzła autostradowego A4 Dębica-Zachód do projektowanego ronda na długości ok. 56m od centrum ronda,• korekta dojazdu drogi powiatowej nr 1290R do projektowanego ronda na długości ok. 405m (początek w km 1+770,70):o 130m od centrum ronda w kierunku Dębicy,o 275m od centrum ronda w kierunku Straszęcina.Istotnym czynnikiem decydującym o konieczności podjęcia planowanego przedsięwzięcia jest stworzenie infrastruktury drogowej niezbędnej do ukierunkowania ruchu samochodowego zjeżdżającego z węzła Dębica-Zachód autostrady A4 co polepszy organizację ruchu i czas przejazdu na odcinkach objętych zakresem inwestycji. Budowa łącznika będzie realizowana z myślą usprawnienia ruchu drogowego oraz zapewnienia jego bezpieczeństwa, a także zapewnienia bezpieczeństwa pieszym i rowerzystom. (Polish)
    0 references

    Identifiers

    RPPK.05.01.00-18-0011/16
    0 references