Introduction of an innovative vacuum drainage service with high pressure Upstream technology using high speed mostupdays and evidence-based filters based on the results of R & D (Q118320): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: summary (P836): As a result of the project, an innovative sub-pressurised water drainage service using an advanced needle-fitting technology and based on the results of R & D performed by the applicant will be introduced into the firm’s bid. The project consists of the purchase of three fixed assets, such as: a crawler excavator, vibrating hammer and the filter aggregate in a sound-absorbent housing with an installation. The service will be innovative on a gl...) |
||
Property / summary | |||
Property / summary: As a result of the project, an innovative sub-pressurised water drainage service using an advanced needle-fitting technology and based on the results of R & D performed by the applicant will be introduced into the firm’s bid. The project consists of the purchase of three fixed assets, such as: a crawler excavator, vibrating hammer and the filter aggregate in a sound-absorbent housing with an installation. The service will be innovative on a global scale. (English) / rank | |||
Revision as of 15:58, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Introduction of an innovative vacuum drainage service with high pressure Upstream technology using high speed mostupdays and evidence-based filters based on the results of R & D |
Project in Poland financed by DG Regio |
Statements
1,025,375.0 zloty
0 references
1,577,500.0 zloty
0 references
65.0 percent
0 references
1 March 2017
0 references
30 June 2017
0 references
PRZEDSIĘBIORSTWO PRODUKCYJNO-USŁUGOWO-HANDLOWE "ARBUD" ARTUR CZAPKA
0 references
W wyniku realizacji projektu do oferty firmy wprowadzona zostanie innowacyjna usługa odwadniania głębokich wykopów metodą podciśnieniową z wykorzystaniem zaawansowanej technologii montażu igłostudni i igłofiltrów opartej na wynikach prac B+R przeprowadzonych przez wnioskodawcę. Projekt polega na zakupie trzech środków trwałych takich jak: koparka gąsienicowa, młot wibracyjny oraz agregat głofiltrowy w obudowie dźwiękochłonnej wraz z instalacją. Wprowadzona usługa cechować się będzie innowacyjnością w skali światowej. (Polish)
0 references
Identifiers
RPPK.01.04.01-18-0546/16
0 references