Thermal modernisation of the Public Building of Primary School in Karol Śląsk. (Q114900): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project consists of a deep and comprehensive energy renovation of 1 public buildings: A public primary school in Kaisko Śląskie in order to increase energy efficiency. Through the activities of the project, there will be a significant increase in the rationality and use of heat and electricity in the building with the important social role of education. The planned refurbishment of the building includes, but is not limited to: warming of w...) |
(Created claim: summary (P836): The subject of the project is a deep and comprehensive energy modernisation of 1 public utility buildings: Public Primary School in Kamień Śląski to increase energy efficiency. The project will significantly increase the rationality and use of heat and electricity in a building with a significant social role of education. The planned modernisation of the building includes: insulation of walls, ceilings, modernisation of 1 heating and hot water i...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep and comprehensive energy modernisation of 1 public utility buildings: Public Primary School in Kamień Śląski to increase energy efficiency. The project will significantly increase the rationality and use of heat and electricity in a building with a significant social role of education. The planned modernisation of the building includes: insulation of walls, ceilings, modernisation of 1 heating and hot water installations together with the installation of 1RES- heat pump for the purpose of water heating, as well as comprehensive lighting exchange and implementation of the energy management system in the building. The project will increase energy efficiency and reduce energy demand in the building. The energy savings resulting from the energy audit, in relation to the initial state, for final energy shall be: IT’S 63.5 %. As part of the project, the so-called green wall will be installed, which will perform both insulating and educational roles in the field of natural objects. Period of return on investment: 18 and a half years. As a result of the project, there will be a driveway for ON-establishing 1 object tailored to the needs of ON,1 project, where improvements for ON were financed. The material effects of the project measured by specific sizes are as follows: Number of facilities adapted to the needs of people with disabilities: It’s 1 pieces. Number of projects which financed the costs of rational improvement for people with disabilities: It’s 1 pieces. Number of energy-efficient buildings: 1 pcs Number of built units of heat generation from RES: 1 pcs Additional capacity to generate heat from renewable sources: 001 MWt The usable area of the building undergoing the thermal modernisation: 2791,04 m² Number of upgraded heat sources: It’s 1 pieces. (English) | |||||||||||||||
Property / summary: The subject of the project is a deep and comprehensive energy modernisation of 1 public utility buildings: Public Primary School in Kamień Śląski to increase energy efficiency. The project will significantly increase the rationality and use of heat and electricity in a building with a significant social role of education. The planned modernisation of the building includes: insulation of walls, ceilings, modernisation of 1 heating and hot water installations together with the installation of 1RES- heat pump for the purpose of water heating, as well as comprehensive lighting exchange and implementation of the energy management system in the building. The project will increase energy efficiency and reduce energy demand in the building. The energy savings resulting from the energy audit, in relation to the initial state, for final energy shall be: IT’S 63.5 %. As part of the project, the so-called green wall will be installed, which will perform both insulating and educational roles in the field of natural objects. Period of return on investment: 18 and a half years. As a result of the project, there will be a driveway for ON-establishing 1 object tailored to the needs of ON,1 project, where improvements for ON were financed. The material effects of the project measured by specific sizes are as follows: Number of facilities adapted to the needs of people with disabilities: It’s 1 pieces. Number of projects which financed the costs of rational improvement for people with disabilities: It’s 1 pieces. Number of energy-efficient buildings: 1 pcs Number of built units of heat generation from RES: 1 pcs Additional capacity to generate heat from renewable sources: 001 MWt The usable area of the building undergoing the thermal modernisation: 2791,04 m² Number of upgraded heat sources: It’s 1 pieces. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep and comprehensive energy modernisation of 1 public utility buildings: Public Primary School in Kamień Śląski to increase energy efficiency. The project will significantly increase the rationality and use of heat and electricity in a building with a significant social role of education. The planned modernisation of the building includes: insulation of walls, ceilings, modernisation of 1 heating and hot water installations together with the installation of 1RES- heat pump for the purpose of water heating, as well as comprehensive lighting exchange and implementation of the energy management system in the building. The project will increase energy efficiency and reduce energy demand in the building. The energy savings resulting from the energy audit, in relation to the initial state, for final energy shall be: IT’S 63.5 %. As part of the project, the so-called green wall will be installed, which will perform both insulating and educational roles in the field of natural objects. Period of return on investment: 18 and a half years. As a result of the project, there will be a driveway for ON-establishing 1 object tailored to the needs of ON,1 project, where improvements for ON were financed. The material effects of the project measured by specific sizes are as follows: Number of facilities adapted to the needs of people with disabilities: It’s 1 pieces. Number of projects which financed the costs of rational improvement for people with disabilities: It’s 1 pieces. Number of energy-efficient buildings: 1 pcs Number of built units of heat generation from RES: 1 pcs Additional capacity to generate heat from renewable sources: 001 MWt The usable area of the building undergoing the thermal modernisation: 2791,04 m² Number of upgraded heat sources: It’s 1 pieces. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 15:24, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the Public Building of Primary School in Karol Śląsk. |
Project in Poland financed by DG Regio |
Statements
612,669.45 zloty
0 references
1,134,573.08 zloty
0 references
54.0 percent
0 references
23 December 2015
0 references
31 December 2017
0 references
GMINA GOGOLIN
0 references
Przedmiotem projektu jest głęboka i kompleksowa modernizacja energetyczna 1 budynku użyteczności publicznej: Publicznej Szkoły Podstawowej w Kamieniu Śląskim w celu zwiększenia efektywności energetycznej. Poprzez działania projektu nastąpi istotne zwiększenie racjonalności i wykorzystania energii cieplnej i elektrycznej w budynku o znacznej roli społecznej, jaką jest edukacja. Planowana modernizacja budynku to m.in.: ocieplenie ścian,stropów, modernizacja 1instalacji grzewczej i ciepłej wody użytkowej wraz z instalacją 1OZE- pompy ciepła na potrzeby dogrzewania wody użytkowej, jak również kompleksowa wymiana oświetlenia oraz wdrożenie systemu zarządzania energią w budynku. W wyniku projektu zwiększy się efektywność energetyczna oraz ograniczy zapotrzebowanie na energię w budynku. Oszczędność energii wynikająca z audytu energetycznego, w odniesieniu do stanu początkowego, dla energii końcowej wynosi: 63,5%. W ramach projektu zainstalowana zostanie tzw. zielona ściana, która będzie pełniła zarówno rolę izolacyjną, jak i edukacyjną w zakresie przedmiotów przyrodniczych. Okres zwrotu inwestycji: 18,99lat. W wyniku projektu zapewniony będzie podjazd dla ON-powstanie 1 obiekt dostosowany do potrzeb ON,1 projekt, gdzie sfinansowano usprawnienia dla ON. Materialne efekty przedsięwzięcia mierzone konkretnymi wielkościami prezentują się następująco: Liczba obiektów dostosowanych do potrzeb osób z niepełnosprawnościami: 1szt. Liczba projektów, w których sfinansowano koszty racjonalnych usprawnień dla osób z niepełnosprawnościami: 1szt. Liczba zmodernizowanych energetycznie budynków: 1 szt. Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE: 1 szt. Dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych: 001 MWt Powierzchnia użytkowa budynku poddanego termomodernizacji: 2791,04 m2 Liczba zmodernizowanych źródeł ciepła: 1szt. (Polish)
0 references
The subject of the project is a deep and comprehensive energy modernisation of 1 public utility buildings: Public Primary School in Kamień Śląski to increase energy efficiency. The project will significantly increase the rationality and use of heat and electricity in a building with a significant social role of education. The planned modernisation of the building includes: insulation of walls, ceilings, modernisation of 1 heating and hot water installations together with the installation of 1RES- heat pump for the purpose of water heating, as well as comprehensive lighting exchange and implementation of the energy management system in the building. The project will increase energy efficiency and reduce energy demand in the building. The energy savings resulting from the energy audit, in relation to the initial state, for final energy shall be: IT’S 63.5 %. As part of the project, the so-called green wall will be installed, which will perform both insulating and educational roles in the field of natural objects. Period of return on investment: 18 and a half years. As a result of the project, there will be a driveway for ON-establishing 1 object tailored to the needs of ON,1 project, where improvements for ON were financed. The material effects of the project measured by specific sizes are as follows: Number of facilities adapted to the needs of people with disabilities: It’s 1 pieces. Number of projects which financed the costs of rational improvement for people with disabilities: It’s 1 pieces. Number of energy-efficient buildings: 1 pcs Number of built units of heat generation from RES: 1 pcs Additional capacity to generate heat from renewable sources: 001 MWt The usable area of the building undergoing the thermal modernisation: 2791,04 m² Number of upgraded heat sources: It’s 1 pieces. (English)
20 October 2020
0 references
Identifiers
RPOP.03.02.02-16-0016/17
0 references