Thermal modernisation of Buków Śląskie. (Q114866): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project involves carrying out works that are aimed at thermo-modernisation of a public service of an educational nature, i.e. the place of establishment of an undertaking in Buków Śląska. The planned investment includes the modernisation of the CO system with the replacement of a boiler with a high-efficiency boiler using a renewable fuel (pellet), the modernisation of the hot-water installations, including the installation of solar panels...) |
(Created claim: summary (P836): The project involves carrying out works aimed at deep thermomodernisation of the public utility facility of an educational nature, i.e. the seat of the kindergarten in Buków Śląski. The planned investment includes the modernisation of the CO system with the replacement of the boiler with a high-efficiency boiler using renewable fuels (pellet), the modernisation of the central heating system, the installation of photovoltaic panels, warming of ho...) |
||||||||||||||
Property / summary | |||||||||||||||
The project involves carrying out works aimed at deep thermomodernisation of the public utility facility of an educational nature, i.e. the seat of the kindergarten in Buków Śląski. The planned investment includes the modernisation of the CO system with the replacement of the boiler with a high-efficiency boiler using renewable fuels (pellet), the modernisation of the central heating system, the installation of photovoltaic panels, warming of horizontal and vertical partitions together with the replacement of window and door joinery, as well as the creation of a green wall in the kindergarten building. The implementation of the project will significantly reduce pollutant emissions (mainly CO2) and significantly reduce the costs of heating the plant. The technological approach used in the project was adopted on the basis of the developed energy audit. It should be emphasised that the project carries out the whole range of work resulting from the audit, while at the same time it does not provide for any other tasks not recommended by the energy audit (except for expenditure on promotional activities). The project is also in line with the territorially competent Low-Emission Economy Plan, adopted by the Municipal Council of Namysłów on the day. IT’S A 2016-10-27. Implementation of the project is planned for approx. 9 months in 2019 (in kind implementation from 2019-04-01 to 2019-11-30, financial termination 2019-12-31). The commencement of the actual implementation will be preceded by the selection of the contractor for construction and assembly works. The applicant applies for funding in the amount of PLN 499 800.00, which is 85.00 % of eligible costs. The project’s products will be modernised energy 1 building, with a usable area of 594 m² (thermomodernised) of 594 m², built 2 units of heat generation from RES, and 1 heat sources will be modernised. (English) | |||||||||||||||
Property / summary: The project involves carrying out works aimed at deep thermomodernisation of the public utility facility of an educational nature, i.e. the seat of the kindergarten in Buków Śląski. The planned investment includes the modernisation of the CO system with the replacement of the boiler with a high-efficiency boiler using renewable fuels (pellet), the modernisation of the central heating system, the installation of photovoltaic panels, warming of horizontal and vertical partitions together with the replacement of window and door joinery, as well as the creation of a green wall in the kindergarten building. The implementation of the project will significantly reduce pollutant emissions (mainly CO2) and significantly reduce the costs of heating the plant. The technological approach used in the project was adopted on the basis of the developed energy audit. It should be emphasised that the project carries out the whole range of work resulting from the audit, while at the same time it does not provide for any other tasks not recommended by the energy audit (except for expenditure on promotional activities). The project is also in line with the territorially competent Low-Emission Economy Plan, adopted by the Municipal Council of Namysłów on the day. IT’S A 2016-10-27. Implementation of the project is planned for approx. 9 months in 2019 (in kind implementation from 2019-04-01 to 2019-11-30, financial termination 2019-12-31). The commencement of the actual implementation will be preceded by the selection of the contractor for construction and assembly works. The applicant applies for funding in the amount of PLN 499 800.00, which is 85.00 % of eligible costs. The project’s products will be modernised energy 1 building, with a usable area of 594 m² (thermomodernised) of 594 m², built 2 units of heat generation from RES, and 1 heat sources will be modernised. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project involves carrying out works aimed at deep thermomodernisation of the public utility facility of an educational nature, i.e. the seat of the kindergarten in Buków Śląski. The planned investment includes the modernisation of the CO system with the replacement of the boiler with a high-efficiency boiler using renewable fuels (pellet), the modernisation of the central heating system, the installation of photovoltaic panels, warming of horizontal and vertical partitions together with the replacement of window and door joinery, as well as the creation of a green wall in the kindergarten building. The implementation of the project will significantly reduce pollutant emissions (mainly CO2) and significantly reduce the costs of heating the plant. The technological approach used in the project was adopted on the basis of the developed energy audit. It should be emphasised that the project carries out the whole range of work resulting from the audit, while at the same time it does not provide for any other tasks not recommended by the energy audit (except for expenditure on promotional activities). The project is also in line with the territorially competent Low-Emission Economy Plan, adopted by the Municipal Council of Namysłów on the day. IT’S A 2016-10-27. Implementation of the project is planned for approx. 9 months in 2019 (in kind implementation from 2019-04-01 to 2019-11-30, financial termination 2019-12-31). The commencement of the actual implementation will be preceded by the selection of the contractor for construction and assembly works. The applicant applies for funding in the amount of PLN 499 800.00, which is 85.00 % of eligible costs. The project’s products will be modernised energy 1 building, with a usable area of 594 m² (thermomodernised) of 594 m², built 2 units of heat generation from RES, and 1 heat sources will be modernised. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 15:23, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of Buków Śląskie. |
Project in Poland financed by DG Regio |
Statements
499,800.0 zloty
0 references
588,000.0 zloty
0 references
85.0 percent
0 references
1 April 2019
0 references
31 December 2019
0 references
GMINA NAMYSŁÓW
0 references
Projekt obejmuje przeprowadzenie prac ukierunkowanych na głęboką termomodernizacje obiektu użyteczności publicznej o charakterze edukacyjnym, tj. siedziby Przedszkola w Bukowie Śląskiej. Planowana inwestycja obejmuje modernizację instalacji CO wraz z wymianą kotła na wysokosprawny kocioł wykorzystujący paliwa odnawialne (pellet), modernizację instalacji c.w.u., wraz z instalacją paneli fotowoltaicznych, docieplenie przegród poziomych i pionowych wraz z wymianą stolarki okiennej i drzwiowej, a także planowane jest utworzenie zielonej ściany w budynku przedszkola. Realizacja projektu przyczyni się do znacznego ograniczenia emisji zanieczyszczeń (głównie CO2) oraz istotnego ograniczenia kosztów ponoszonych na ogrzewanie obiektu. Podejście technologiczne zastosowane w projekcie zostało przyjęte na bazie opracowanego audytu energetycznego. Należy podkreślić, że projekt realizuje cały zakres prac wynikający z opracowanego audytu, a jednocześnie nie przewiduje realizacji żadnych innych zadań nie zalecanych przez audyt energetyczny (wyjątkiem są wydatki na działania promocyjne). Projekt jest także zgodny z właściwym terytorialnie Planem Gospodarki Niskoemisyjnej, przyjętym przez Radę Gminy Namysłów w dn. 2016-10-27. Realizacja projektu planowana jest na ok. 9 miesięcy w 2019 r. (realizacja rzeczowa od 2019-04-01 do 2019-11-30, zakończenie finansowe 2019-12-31). Rozpoczęcie rzeczowej realizacji zostanie poprzedzone przeprowadzeniem wyboru wykonawcy prac budowlano-montażowych. Wnioskodawca ubiega się o dofinansowanie w kwocie 499 800,00 zł, co stanowi 85,00% kosztów kwalifikowanych. Produktami projektu będzie zmodernizowany energetycznie 1 budynek, o powierzchnia użytkowej (poddanej termomodernizacji) 594 m2, wybudowane 2 jednostki wytwarzania energii cieplnej z OZE, oraz zmodernizowane zostanie 1 źródeł ciepła. (Polish)
0 references
The project involves carrying out works aimed at deep thermomodernisation of the public utility facility of an educational nature, i.e. the seat of the kindergarten in Buków Śląski. The planned investment includes the modernisation of the CO system with the replacement of the boiler with a high-efficiency boiler using renewable fuels (pellet), the modernisation of the central heating system, the installation of photovoltaic panels, warming of horizontal and vertical partitions together with the replacement of window and door joinery, as well as the creation of a green wall in the kindergarten building. The implementation of the project will significantly reduce pollutant emissions (mainly CO2) and significantly reduce the costs of heating the plant. The technological approach used in the project was adopted on the basis of the developed energy audit. It should be emphasised that the project carries out the whole range of work resulting from the audit, while at the same time it does not provide for any other tasks not recommended by the energy audit (except for expenditure on promotional activities). The project is also in line with the territorially competent Low-Emission Economy Plan, adopted by the Municipal Council of Namysłów on the day. IT’S A 2016-10-27. Implementation of the project is planned for approx. 9 months in 2019 (in kind implementation from 2019-04-01 to 2019-11-30, financial termination 2019-12-31). The commencement of the actual implementation will be preceded by the selection of the contractor for construction and assembly works. The applicant applies for funding in the amount of PLN 499 800.00, which is 85.00 % of eligible costs. The project’s products will be modernised energy 1 building, with a usable area of 594 m² (thermomodernised) of 594 m², built 2 units of heat generation from RES, and 1 heat sources will be modernised. (English)
20 October 2020
0 references
Identifiers
RPOP.03.02.01-16-0009/18
0 references