Renovation of the Building Office of the Municipality in Lasowice Wielkie with the installation of a heat pump and photovoltaic equipment (Q114856): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project carried out by the municipality of Lasowice Wielkie is based on the completion of works leading to deep energy modernisation of the public building, in which the municipality of Lasowice Wielkie and Gminny Social Welfare Office are located. The site is located in Lasowice Great 99A, in a key district. The scope of the project includes: the assembly of a split-level brine heat pump — water having a power Q = 57.6 kW with control for...) |
(Created claim: summary (P836): The project implemented by the Municipality of Lasowice Wielkie consists of carrying out works aimed at deep energy modernisation of the public utility building, in which the Municipal Office of Lasowice Wielkie and the Municipal Centre for Social Welfare are located. The facility is located in Lasowice Wielkie 99A, in Keybor County. The project’s material scope includes: installation of a two-stage heat pump brine – water with power Q=57.6 kW w...) |
||||||||||||||
Property / summary | |||||||||||||||
The project implemented by the Municipality of Lasowice Wielkie consists of carrying out works aimed at deep energy modernisation of the public utility building, in which the Municipal Office of Lasowice Wielkie and the Municipal Centre for Social Welfare are located. The facility is located in Lasowice Wielkie 99A, in Keybor County. The project’s material scope includes: installation of a two-stage heat pump brine – water with power Q=57.6 kW with control enabling automatic control of the temperature of heating water coming out of the pump depending on the external temperature and inside the facility – powered from PV installation installed in the project – 80 pieces of ground heat exchange panels with a total power of AC 24,8kWp. The planned action results from the energy audit carried out and the suggested optimal option. As a result of this project, energy efficiency will increase, greenhouse gas emissions will fall by 94.20 % and the share of renewable energy will be increased by 87.7 %. The project will be implemented in 2019. Project effect – Lasowice Municipality has a large facility with high energy efficiency parameters (pc.1) and an ecological and efficient system of self-contained energy generation (pc.1), which contributes to reducing greenhouse gas emissions and increasing energy savings. Direct products of the project will also be: usable area of the thermally upgraded building – 717.54 m² and number of built units of thermal energy production from RES – pcs. 1 (English) | |||||||||||||||
Property / summary: The project implemented by the Municipality of Lasowice Wielkie consists of carrying out works aimed at deep energy modernisation of the public utility building, in which the Municipal Office of Lasowice Wielkie and the Municipal Centre for Social Welfare are located. The facility is located in Lasowice Wielkie 99A, in Keybor County. The project’s material scope includes: installation of a two-stage heat pump brine – water with power Q=57.6 kW with control enabling automatic control of the temperature of heating water coming out of the pump depending on the external temperature and inside the facility – powered from PV installation installed in the project – 80 pieces of ground heat exchange panels with a total power of AC 24,8kWp. The planned action results from the energy audit carried out and the suggested optimal option. As a result of this project, energy efficiency will increase, greenhouse gas emissions will fall by 94.20 % and the share of renewable energy will be increased by 87.7 %. The project will be implemented in 2019. Project effect – Lasowice Municipality has a large facility with high energy efficiency parameters (pc.1) and an ecological and efficient system of self-contained energy generation (pc.1), which contributes to reducing greenhouse gas emissions and increasing energy savings. Direct products of the project will also be: usable area of the thermally upgraded building – 717.54 m² and number of built units of thermal energy production from RES – pcs. 1 (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project implemented by the Municipality of Lasowice Wielkie consists of carrying out works aimed at deep energy modernisation of the public utility building, in which the Municipal Office of Lasowice Wielkie and the Municipal Centre for Social Welfare are located. The facility is located in Lasowice Wielkie 99A, in Keybor County. The project’s material scope includes: installation of a two-stage heat pump brine – water with power Q=57.6 kW with control enabling automatic control of the temperature of heating water coming out of the pump depending on the external temperature and inside the facility – powered from PV installation installed in the project – 80 pieces of ground heat exchange panels with a total power of AC 24,8kWp. The planned action results from the energy audit carried out and the suggested optimal option. As a result of this project, energy efficiency will increase, greenhouse gas emissions will fall by 94.20 % and the share of renewable energy will be increased by 87.7 %. The project will be implemented in 2019. Project effect – Lasowice Municipality has a large facility with high energy efficiency parameters (pc.1) and an ecological and efficient system of self-contained energy generation (pc.1), which contributes to reducing greenhouse gas emissions and increasing energy savings. Direct products of the project will also be: usable area of the thermally upgraded building – 717.54 m² and number of built units of thermal energy production from RES – pcs. 1 (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 15:22, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Renovation of the Building Office of the Municipality in Lasowice Wielkie with the installation of a heat pump and photovoltaic equipment |
Project in Poland financed by DG Regio |
Statements
485,306.25 zloty
0 references
621,948.3 zloty
0 references
78.03 percent
0 references
1 May 2019
0 references
31 October 2019
0 references
GMINA LASOWICE WIELKIE
0 references
Projekt realizowany przez Gminę Lasowice Wielkie polega na wykonaniu prac zmierzających do głębokiej modernizacji energetycznej budynku użyteczności publicznej, w którym ma siedzibę Urząd Gminy Lasowice Wielkie oraz Gminny Ośrodek Pomocy Społecznej. Obiekt zlokalizowany jest w Lasowicach Wielkich 99A, w powiecie kluczborskim. Zakres rzeczowy projektu obejmuje: montaż gruntowej dwustopniowej pompy ciepła solanka – woda o mocy Q=57,6kW ze sterowaniem umożliwiającym automatyczną regulację temperatury wody grzewczej wychodzącej z pompy w zależności od temperatury zewnętrznej, jak i wewnątrz obiektu - zasilanej z instalacji PV zainstalowanej w ramach projektu - 80 szt. naziemnych paneli fotowoltaicznych o łącznej mocy AC 24,8kWp, wymianę wewnętrznej instalacji centralnego ogrzewania (tj. m.in. wymiana grzejników wraz z głowicami termostatycznymi - szt.39), zamianę istniejącej kotłowni opalanej paliwem stałym na centralę cieplną (szt.1) wraz z pracami towarzyszącymi (robotami rozbiórkowymi, robotami murowymi, malowanie), wymianę wyeksploatowanych opraw świetlówkowych i żarowych na nowe energooszczędne oprawy ze źródłami typu LED. Planowane do realizacji działania wynikają z przeprowadzonego audytu energetycznego i sugerowanego optymalnego wariantu. W wyniku realizacji przedmiotowego projektu wzrośnie efektywność energetyczna, emisja gazów cieplarnianych spadnie o 94,20% oraz nastąpi zwiększenie udziału energii odnawialnej o 87,7%. Projekt będzie realizowany w 2019 roku. Efekt projektu – dysponowanie przez Gminę Lasowice Wielkie obiektem o wysokich parametrach energooszczędności (szt.1) oraz o ekologicznym i wydajnym systemie wytwarzania energii na własne potrzeby (szt.1), przyczyniającym się do spadku emisji gazów cieplarnianych oraz zwiększenia oszczędności energii. Bezpośrednimi produktami projektu będą również: powierzchnia użytkowa budynku poddanego termomodernizacji - 717,54 m2 oraz liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE - szt. 1 (Polish)
0 references
The project implemented by the Municipality of Lasowice Wielkie consists of carrying out works aimed at deep energy modernisation of the public utility building, in which the Municipal Office of Lasowice Wielkie and the Municipal Centre for Social Welfare are located. The facility is located in Lasowice Wielkie 99A, in Keybor County. The project’s material scope includes: installation of a two-stage heat pump brine – water with power Q=57.6 kW with control enabling automatic control of the temperature of heating water coming out of the pump depending on the external temperature and inside the facility – powered from PV installation installed in the project – 80 pieces of ground heat exchange panels with a total power of AC 24,8kWp. The planned action results from the energy audit carried out and the suggested optimal option. As a result of this project, energy efficiency will increase, greenhouse gas emissions will fall by 94.20 % and the share of renewable energy will be increased by 87.7 %. The project will be implemented in 2019. Project effect – Lasowice Municipality has a large facility with high energy efficiency parameters (pc.1) and an ecological and efficient system of self-contained energy generation (pc.1), which contributes to reducing greenhouse gas emissions and increasing energy savings. Direct products of the project will also be: usable area of the thermally upgraded building – 717.54 m² and number of built units of thermal energy production from RES – pcs. 1 (English)
20 October 2020
0 references
Identifiers
RPOP.03.02.01-16-0001/18
0 references