Bicycle paths and place of tourism in the Gulf of Zakeliczyński (Q112953): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The bicycle paths and the tourist point above the Gulf of Zakeliczyt Construction of 2 laying steel frames together with the consolidation of the turbot and the watercourse and to the management of the site within route No 4B (walking string); construction of the roundabout road and the renovation of the existing municipal road, along with the construction of a tourist point with a stop, visibility, field stairs and small-scale architecture, r...)
(‎Created claim: summary (P836): Cycle paths and tourist point over the Zakliczyńska BayConstruction 2 steel-wooded footbridges along with fortification of slopes and watercourses, as well as the development of the terrain along the route No. 4B hiking track; Construction of a walking road and renovation of the existing municipal road together with the construction of a tourist point with a world stop, a lookout platform, field stairs and a small architecture route No. 5; Const...)
Property / summary
 
Cycle paths and tourist point over the Zakliczyńska BayConstruction 2 steel-wooded footbridges along with fortification of slopes and watercourses, as well as the development of the terrain along the route No. 4B hiking track; Construction of a walking road and renovation of the existing municipal road together with the construction of a tourist point with a world stop, a lookout platform, field stairs and a small architecture route No. 5; Construction of a footbike road and renovation of the existing municipal road route No 6;Construction of a footbike road and a tourist point with playground, outdoor gym, car park with lighting, lighting construction on ul. Over the Lagoon, a lookout tower, a world bus stop and a small architecture route No. 7; Construction of a bicycle road marked with number 11A, and the creation of a tourist point with a small architecture. The construction of a steel-wooded footbridge along with land development and the reconstruction of the transport line along Route 11A.In the course of drafting the project assumptions and technical documentation for the project, the formula of the urban and architectural competition was not used.The total length of the sections of the routes is 9710 m including: atras in general traffic 3547mbs Bicycle or foot cycle tracks 4991mccs hiking trails 1172 m.Projected independent footpaths are in accordance with 46 and 47 paragraph. 1 and 48 (1) and paragraph 1. 2. Thus, both track width and longitudinal and transverse slopes are in accordance with the Regulation of the Minister of Transport and Maritime Economy of 2 March 1999 on the technical conditions to be met by public roads and their location of the Journal of Laws of 2016, item 124, the width of the newly built path will be 3.0 m. (English)
Property / summary: Cycle paths and tourist point over the Zakliczyńska BayConstruction 2 steel-wooded footbridges along with fortification of slopes and watercourses, as well as the development of the terrain along the route No. 4B hiking track; Construction of a walking road and renovation of the existing municipal road together with the construction of a tourist point with a world stop, a lookout platform, field stairs and a small architecture route No. 5; Construction of a footbike road and renovation of the existing municipal road route No 6;Construction of a footbike road and a tourist point with playground, outdoor gym, car park with lighting, lighting construction on ul. Over the Lagoon, a lookout tower, a world bus stop and a small architecture route No. 7; Construction of a bicycle road marked with number 11A, and the creation of a tourist point with a small architecture. The construction of a steel-wooded footbridge along with land development and the reconstruction of the transport line along Route 11A.In the course of drafting the project assumptions and technical documentation for the project, the formula of the urban and architectural competition was not used.The total length of the sections of the routes is 9710 m including: atras in general traffic 3547mbs Bicycle or foot cycle tracks 4991mccs hiking trails 1172 m.Projected independent footpaths are in accordance with 46 and 47 paragraph. 1 and 48 (1) and paragraph 1. 2. Thus, both track width and longitudinal and transverse slopes are in accordance with the Regulation of the Minister of Transport and Maritime Economy of 2 March 1999 on the technical conditions to be met by public roads and their location of the Journal of Laws of 2016, item 124, the width of the newly built path will be 3.0 m. (English) / rank
 
Normal rank
Property / summary: Cycle paths and tourist point over the Zakliczyńska BayConstruction 2 steel-wooded footbridges along with fortification of slopes and watercourses, as well as the development of the terrain along the route No. 4B hiking track; Construction of a walking road and renovation of the existing municipal road together with the construction of a tourist point with a world stop, a lookout platform, field stairs and a small architecture route No. 5; Construction of a footbike road and renovation of the existing municipal road route No 6;Construction of a footbike road and a tourist point with playground, outdoor gym, car park with lighting, lighting construction on ul. Over the Lagoon, a lookout tower, a world bus stop and a small architecture route No. 7; Construction of a bicycle road marked with number 11A, and the creation of a tourist point with a small architecture. The construction of a steel-wooded footbridge along with land development and the reconstruction of the transport line along Route 11A.In the course of drafting the project assumptions and technical documentation for the project, the formula of the urban and architectural competition was not used.The total length of the sections of the routes is 9710 m including: atras in general traffic 3547mbs Bicycle or foot cycle tracks 4991mccs hiking trails 1172 m.Projected independent footpaths are in accordance with 46 and 47 paragraph. 1 and 48 (1) and paragraph 1. 2. Thus, both track width and longitudinal and transverse slopes are in accordance with the Regulation of the Minister of Transport and Maritime Economy of 2 March 1999 on the technical conditions to be met by public roads and their location of the Journal of Laws of 2016, item 124, the width of the newly built path will be 3.0 m. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:34, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Bicycle paths and place of tourism in the Gulf of Zakeliczyński
Project in Poland financed by DG Regio

    Statements

    0 references
    4,633,952.62 zloty
    0 references
    1,112,148.63 Euro
    13 January 2020
    0 references
    6,865,115.06 zloty
    0 references
    1,647,627.61 Euro
    13 January 2020
    0 references
    67.5 percent
    0 references
    2 January 2018
    0 references
    31 August 2020
    0 references
    GMINA SIEPRAW
    0 references
    0 references
    Ścieżki rowerowe oraz punkt turystyczny nad Zatoką ZakliczyńskąBudowa 2 kładek stalowodrewnianych wraz z umocnieniem skarp i cieku wodnego oraz z zagospodarowaniem terenu w ciągu trasy nr 4B ciąg pieszy;Budowa drogi pieszorowerowej oraz wykonanie remontu istniejącej drogi gminnej wraz z budową punktu turystycznego z wiatą przystankową, podestem widokowym, schodami terenowymi i małą architekturą trasa nr 5; Budowa drogi pieszorowerowej oraz wykonanie remontu istniejącej drogi gminnej trasa nr 6;Budowa drogi pieszorowerowej oraz punktu turystycznego z placem zabaw, siłownią zewnętrzną, parkingiem wraz z oświetleniem, budową oświetlenia na ul. Nad Zalewem, wieżą widokową, wiatą przystankową i małą architekturą trasa nr 7;Budowa drogi pieszorowerowej oznaczonej numerem 11A, oraz utworzenie punktu turystycznego wraz z małą architekturą. Budowa kładki stalowodrewnianej wraz z zagospodarowaniem terenu oraz przebudową ciągu komunikacyjnego w ciągu trasy nr 11A.W toku opracowania założeń projektu oraz dokumentacji technicznej dla projektu nie wykorzystano formuły konkursu urbanistycznoarchitektonicznego ani konkursu architektonicznego.Łączna długość odcinków tras wynosi 9710m w tym: atrasy w ruchu ogólnym 3547mbtrasy rowerowe lub pieszorowerowe 4991mctrasy piesze 1172m.Projektowane samodzielne trasy pieszorowerowe są zgodne z 46 oraz 47 ust. 1 oraz 48 ust 1 i ust. 2. Zatem zarówno szerokości ścieżek jak i pochylenia podłużne i poprzeczne są zgodne z ww Rozporządzenia Ministra Transportu i Gospodarki Morskiej z dnia 2 marca 1999r. w sprawie warunków technicznych, jakim powinny odpowiadać drogi publiczne i ich usytuowanie Dz.U. z 2016 r., poz.124. szerokość nowobudowanej ścieżki wynosi będzie 3,0 m. (Polish)
    0 references
    Cycle paths and tourist point over the Zakliczyńska BayConstruction 2 steel-wooded footbridges along with fortification of slopes and watercourses, as well as the development of the terrain along the route No. 4B hiking track; Construction of a walking road and renovation of the existing municipal road together with the construction of a tourist point with a world stop, a lookout platform, field stairs and a small architecture route No. 5; Construction of a footbike road and renovation of the existing municipal road route No 6;Construction of a footbike road and a tourist point with playground, outdoor gym, car park with lighting, lighting construction on ul. Over the Lagoon, a lookout tower, a world bus stop and a small architecture route No. 7; Construction of a bicycle road marked with number 11A, and the creation of a tourist point with a small architecture. The construction of a steel-wooded footbridge along with land development and the reconstruction of the transport line along Route 11A.In the course of drafting the project assumptions and technical documentation for the project, the formula of the urban and architectural competition was not used.The total length of the sections of the routes is 9710 m including: atras in general traffic 3547mbs Bicycle or foot cycle tracks 4991mccs hiking trails 1172 m.Projected independent footpaths are in accordance with 46 and 47 paragraph. 1 and 48 (1) and paragraph 1. 2. Thus, both track width and longitudinal and transverse slopes are in accordance with the Regulation of the Minister of Transport and Maritime Economy of 2 March 1999 on the technical conditions to be met by public roads and their location of the Journal of Laws of 2016, item 124, the width of the newly built path will be 3.0 m. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.06.03.03-12-0309/17
    0 references