Recreational Centre Poland (Q112935): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project concerns the construction of a leisure centre within which, in the communal and private areas of Poland and Zhanaozen, a new composition and space for recreation and recreation will appear. The project foresees 2 main tasks: 1. construction of 2 zones: zone I: area to be used for external machinery machinery, including elliptical, chair, top extract, skiing, rowing, rowing, butterfly, extrusion, cycle of training Zone II: the area...)
(‎Created claim: summary (P836): The project concerns the construction of a recreation centre within which a new composition and space for recreation and recreation will appear in the communal and private areas in Łopacie Polska and Żegiestów. The project envisages 2 main tasks: 1. construction of 2 zones:Zone I: area for outdoor gym equipment runner, elliptical cross trainer, high chair, top lift, cross-country skis, rowing machine, butterfly, high chair, exercise bike Zone II...)
Property / summary
 
The project concerns the construction of a recreation centre within which a new composition and space for recreation and recreation will appear in the communal and private areas in Łopacie Polska and Żegiestów. The project envisages 2 main tasks: 1. construction of 2 zones:Zone I: area for outdoor gym equipment runner, elliptical cross trainer, high chair, top lift, cross-country skis, rowing machine, butterfly, high chair, exercise bike Zone II: the area for the playground. The following children’s play equipment shall be designed: dragonfly swing double lock cross carousel four-arm double swingThe works in this respect will be realised on plot 7395. 2. work on the walkway along with the lighting of the walking promenade on the commune road ŻegiestówŁopata and voivodship no. 971 KrynicaZdrój, MuszynaPiwniczna.Works within the project will be carried out in Muszyna commune Andrzejów and Żegiestów Voivodeship road, on plots: 645, 678, 736, 621, 738, 745, 145, 166, 5572, 586, 585, 584, 583, 582, 5805, 5711, 569, 567, 565, 561, 560, 558, 5443, 527, 526, 402, 3962 on the basis of the right to dispose of the property for the purpose of carrying out the project, resulting from the ownership, consent of owners, contracts no. 3962 to the application, while plot No 6 is owned by PKP and the plot No. As part of the preparatory work, the necessary documentation of the project, both of a technical nature and a necessary annex to the application for funding, has also been prepared for a financial and economic analysis, together with a risk analysis. (English)
Property / summary: The project concerns the construction of a recreation centre within which a new composition and space for recreation and recreation will appear in the communal and private areas in Łopacie Polska and Żegiestów. The project envisages 2 main tasks: 1. construction of 2 zones:Zone I: area for outdoor gym equipment runner, elliptical cross trainer, high chair, top lift, cross-country skis, rowing machine, butterfly, high chair, exercise bike Zone II: the area for the playground. The following children’s play equipment shall be designed: dragonfly swing double lock cross carousel four-arm double swingThe works in this respect will be realised on plot 7395. 2. work on the walkway along with the lighting of the walking promenade on the commune road ŻegiestówŁopata and voivodship no. 971 KrynicaZdrój, MuszynaPiwniczna.Works within the project will be carried out in Muszyna commune Andrzejów and Żegiestów Voivodeship road, on plots: 645, 678, 736, 621, 738, 745, 145, 166, 5572, 586, 585, 584, 583, 582, 5805, 5711, 569, 567, 565, 561, 560, 558, 5443, 527, 526, 402, 3962 on the basis of the right to dispose of the property for the purpose of carrying out the project, resulting from the ownership, consent of owners, contracts no. 3962 to the application, while plot No 6 is owned by PKP and the plot No. As part of the preparatory work, the necessary documentation of the project, both of a technical nature and a necessary annex to the application for funding, has also been prepared for a financial and economic analysis, together with a risk analysis. (English) / rank
 
Normal rank
Property / summary: The project concerns the construction of a recreation centre within which a new composition and space for recreation and recreation will appear in the communal and private areas in Łopacie Polska and Żegiestów. The project envisages 2 main tasks: 1. construction of 2 zones:Zone I: area for outdoor gym equipment runner, elliptical cross trainer, high chair, top lift, cross-country skis, rowing machine, butterfly, high chair, exercise bike Zone II: the area for the playground. The following children’s play equipment shall be designed: dragonfly swing double lock cross carousel four-arm double swingThe works in this respect will be realised on plot 7395. 2. work on the walkway along with the lighting of the walking promenade on the commune road ŻegiestówŁopata and voivodship no. 971 KrynicaZdrój, MuszynaPiwniczna.Works within the project will be carried out in Muszyna commune Andrzejów and Żegiestów Voivodeship road, on plots: 645, 678, 736, 621, 738, 745, 145, 166, 5572, 586, 585, 584, 583, 582, 5805, 5711, 569, 567, 565, 561, 560, 558, 5443, 527, 526, 402, 3962 on the basis of the right to dispose of the property for the purpose of carrying out the project, resulting from the ownership, consent of owners, contracts no. 3962 to the application, while plot No 6 is owned by PKP and the plot No. As part of the preparatory work, the necessary documentation of the project, both of a technical nature and a necessary annex to the application for funding, has also been prepared for a financial and economic analysis, together with a risk analysis. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:33, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Recreational Centre Poland
Project in Poland financed by DG Regio

    Statements

    0 references
    1,199,726.13 zloty
    0 references
    287,934.27 Euro
    13 January 2020
    0 references
    1,777,372.1 zloty
    0 references
    426,569.3 Euro
    13 January 2020
    0 references
    67.5 percent
    0 references
    1 October 2016
    0 references
    31 August 2019
    0 references
    „CECHINI ŻEGIESTÓW-ZDRÓJ GŁÓWNY” SP. Z O.O.
    0 references
    0 references
    Projekt dotyczy realizacji budowy centrum rekreacji w ramach którego na terenach gminnych i prywatnych na Łopacie Polskiej i Żegiestowie pojawi się nowa kompozycja i przestrzeń dla rekreacji i wypoczynku. W projekcie przewidziano 2 główne zadania: 1. budowę 2 stref:Strefa I: teren przeznaczany pod urządzenia siłowni zewnętrznej biegacz, trenażer eliptyczny, krzesełko, wyciąg górny, narty biegowe, wioślarz, motylek, krzesełko wyciskanie, rower treningowy Strefa II: teren przeznaczony pod plac zabaw. Projektuje się montaż następujących urządzeń zabawowych dla dzieci: huśtawka ważka podwójna zamek karuzela krzyżowa czteroramienna huśtawka podwójnaPrace w tym zakresie zrealizowane zostaną na działce 7395. 2. prace przy ciągu spacerowym wraz z oświetleniem promenady spacerowej na drodze gminnej ŻegiestówŁopata oraz wojewódzkiej nr 971 KrynicaZdrój, MuszynaPiwniczna.Prace w ramach projektu będą wykonywane w gminie Muszyna obręb Andrzejów i Żegiestów droga wojewódzka, na działkach: 645, 678, 736, 621, 738, 745, 145, 166, 5572, 586, 585, 584, 583, 582, 5805, 5711, 569, 567, 565, 561, 560, 558, 5443, 527, 526, 402, 3811, 3962 na podstawie posiadanego prawa do dysponowania nieruchomością na cele realizacji projektu wynikające z tytułu własności, zgody właścicieli, umów zał. nr 6 do wniosku, natomiast działka nr 139 jest własnością PKP a działki nr 747, 617, 618 należą do Lasów Państwowych. W ramach prac przygotowawczych opracowana została również niezbędna dokumentacja projektu zarówno o charakterze technicznym jak i stanowiąca niezbędny załącznik do wniosku o dofinansowanie analiza finansowa i ekonomiczna wraz z analizą ryzyka. (Polish)
    0 references
    The project concerns the construction of a recreation centre within which a new composition and space for recreation and recreation will appear in the communal and private areas in Łopacie Polska and Żegiestów. The project envisages 2 main tasks: 1. construction of 2 zones:Zone I: area for outdoor gym equipment runner, elliptical cross trainer, high chair, top lift, cross-country skis, rowing machine, butterfly, high chair, exercise bike Zone II: the area for the playground. The following children’s play equipment shall be designed: dragonfly swing double lock cross carousel four-arm double swingThe works in this respect will be realised on plot 7395. 2. work on the walkway along with the lighting of the walking promenade on the commune road ŻegiestówŁopata and voivodship no. 971 KrynicaZdrój, MuszynaPiwniczna.Works within the project will be carried out in Muszyna commune Andrzejów and Żegiestów Voivodeship road, on plots: 645, 678, 736, 621, 738, 745, 145, 166, 5572, 586, 585, 584, 583, 582, 5805, 5711, 569, 567, 565, 561, 560, 558, 5443, 527, 526, 402, 3962 on the basis of the right to dispose of the property for the purpose of carrying out the project, resulting from the ownership, consent of owners, contracts no. 3962 to the application, while plot No 6 is owned by PKP and the plot No. As part of the preparatory work, the necessary documentation of the project, both of a technical nature and a necessary annex to the application for funding, has also been prepared for a financial and economic analysis, together with a risk analysis. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.06.03.02-12-0536/16
    0 references