Improvement of air quality in the municipality of Tuchów by replacing old boilers and solid fuel furnaces in individual households — to new, also using solid fuels (Q112425): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project includes: the replacement of old heat sources into new solid fuels for 140 buildings. The new installations will be powered by solid fuels, with the exception of biomastics. the replacement of internal installations for the 105 buildings with CO2 emission reduction and the reduction of PM10 and PM2,5 emissions is provided in part Q.In the framework of the project, the connection to the local district heating network is not planned....) |
(Created claim: summary (P836): The project shall include: replacement of old heat sources for new ones for solid fuels for 140 buildings. New equipment will be powered by solid fuels excluding biomass. replacement of internal installations for 105 buildings reducing CO2 emissions and reduction of PM10 and PM2.5 emissions is specified in Part Q.The project does not plan to connect to the local heating network. There is one local boiler house in one of the housing estates. The...) |
||||||||||||||
Property / summary | |||||||||||||||
The project shall include: replacement of old heat sources for new ones for solid fuels for 140 buildings. New equipment will be powered by solid fuels excluding biomass. replacement of internal installations for 105 buildings reducing CO2 emissions and reduction of PM10 and PM2.5 emissions is specified in Part Q.The project does not plan to connect to the local heating network. There is one local boiler house in one of the housing estates. The owner does not plan to expand the heating network until 2023.The actions aimed at raising environmental awareness due to the lack of space in this section are described in section C4.The applicant does not have and does not plan to prepare a cover program for persons who bear increased heating costs of the premises related to the permanent change of heating system in the area covered by the project.The project is implemented in the area of the municipality qualified for areas where it is necessary to undertake corrective actions involving the elimination of the old low-efficiency equipment in the project. C.1.1.In the Low Emission Economy Plan an exchange of old heat sources is planned. The plan has been reviewed and confirmed by WFOŚiGW in Krakow.The PGN includes a problem analysis presented in point C.1.2. The project includes repair actions indicated in PGN, which is the replacement of old sources of heat.Tuchów is not a spa town. (English) | |||||||||||||||
Property / summary: The project shall include: replacement of old heat sources for new ones for solid fuels for 140 buildings. New equipment will be powered by solid fuels excluding biomass. replacement of internal installations for 105 buildings reducing CO2 emissions and reduction of PM10 and PM2.5 emissions is specified in Part Q.The project does not plan to connect to the local heating network. There is one local boiler house in one of the housing estates. The owner does not plan to expand the heating network until 2023.The actions aimed at raising environmental awareness due to the lack of space in this section are described in section C4.The applicant does not have and does not plan to prepare a cover program for persons who bear increased heating costs of the premises related to the permanent change of heating system in the area covered by the project.The project is implemented in the area of the municipality qualified for areas where it is necessary to undertake corrective actions involving the elimination of the old low-efficiency equipment in the project. C.1.1.In the Low Emission Economy Plan an exchange of old heat sources is planned. The plan has been reviewed and confirmed by WFOŚiGW in Krakow.The PGN includes a problem analysis presented in point C.1.2. The project includes repair actions indicated in PGN, which is the replacement of old sources of heat.Tuchów is not a spa town. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project shall include: replacement of old heat sources for new ones for solid fuels for 140 buildings. New equipment will be powered by solid fuels excluding biomass. replacement of internal installations for 105 buildings reducing CO2 emissions and reduction of PM10 and PM2.5 emissions is specified in Part Q.The project does not plan to connect to the local heating network. There is one local boiler house in one of the housing estates. The owner does not plan to expand the heating network until 2023.The actions aimed at raising environmental awareness due to the lack of space in this section are described in section C4.The applicant does not have and does not plan to prepare a cover program for persons who bear increased heating costs of the premises related to the permanent change of heating system in the area covered by the project.The project is implemented in the area of the municipality qualified for areas where it is necessary to undertake corrective actions involving the elimination of the old low-efficiency equipment in the project. C.1.1.In the Low Emission Economy Plan an exchange of old heat sources is planned. The plan has been reviewed and confirmed by WFOŚiGW in Krakow.The PGN includes a problem analysis presented in point C.1.2. The project includes repair actions indicated in PGN, which is the replacement of old sources of heat.Tuchów is not a spa town. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 12:10, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of air quality in the municipality of Tuchów by replacing old boilers and solid fuel furnaces in individual households — to new, also using solid fuels |
Project in Poland financed by DG Regio |
Statements
1,141,116.68 zloty
0 references
1,159,326.77 zloty
0 references
98.43 percent
0 references
1 July 2017
0 references
30 June 2020
0 references
GMINA TUCHÓW
0 references
Projekt obejmuje: wymianę starych źródeł ciepła na nowe na paliwa stałe dla 140 budynków. Nowe urządzenia będą zasilane paliwami stałymi z wyłączeniem biomasy. wymianę instalacji wewnętrznych dla 105 budynków redukcji emisji CO2 oraz redukcji emisji pyłu PM10 i PM2,5 podano w części Q.W ramach projektu nie jest planowane podłączenie do lokalnej sieci ciepłowniczej. Na terenie Gminy Tuchów istnieje jedna lokalna kotłownia na terenie jednego z osiedli mieszkaniowych. Właściciel nie planuje rozbudowy sieci ciepłowniczej do roku 2023.Działania na rzecz podnoszenia świadomości ekologicznej ze względu na brak miejsca w tym punkcie zostały opisane w części C4.Wnioskodawca nie posiada i nie planuje przygotowania programu osłonowego dla osób, które ponoszą zwiększone koszty grzewcze lokalu związane z trwałą zmianą systemu ogrzewania na terenie objętym projektem.Projekt jest realizowany na terenie Gminy zakwalifikowanej do obszarów, na których konieczne jest podjęcie działań naprawczych polegających na likwidacji starych niskosprawnych urządzeń grzewczych i wyszczególnionych w obowiązującym Programie ochrony powietrza dla województwa małopolskiego opis w pkt. C.1.1.W Planie Gospodarki Niskoemisyjnej zaplanowano wymianę starych źródeł ciepła. Plan został zaopiniowany i uzyskał potwierdzenie z WFOŚiGW w Krakowie.PGN obejmuje analizę problemową przedstawiono ją w pkt C.1.2. Projekt obejmuje wskazane w PGN działania naprawcze, którym jest wymiana starych źródeł ciepła.Tuchów nie jest miejscowością uzdrowiskową. (Polish)
0 references
The project shall include: replacement of old heat sources for new ones for solid fuels for 140 buildings. New equipment will be powered by solid fuels excluding biomass. replacement of internal installations for 105 buildings reducing CO2 emissions and reduction of PM10 and PM2.5 emissions is specified in Part Q.The project does not plan to connect to the local heating network. There is one local boiler house in one of the housing estates. The owner does not plan to expand the heating network until 2023.The actions aimed at raising environmental awareness due to the lack of space in this section are described in section C4.The applicant does not have and does not plan to prepare a cover program for persons who bear increased heating costs of the premises related to the permanent change of heating system in the area covered by the project.The project is implemented in the area of the municipality qualified for areas where it is necessary to undertake corrective actions involving the elimination of the old low-efficiency equipment in the project. C.1.1.In the Low Emission Economy Plan an exchange of old heat sources is planned. The plan has been reviewed and confirmed by WFOŚiGW in Krakow.The PGN includes a problem analysis presented in point C.1.2. The project includes repair actions indicated in PGN, which is the replacement of old sources of heat.Tuchów is not a spa town. (English)
20 October 2020
0 references
Identifiers
RPMP.04.04.03-12-0124/17
0 references