“Improving the energy efficiency of public buildings in the county of Szrzyny” (Q112269): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The scope of the project consists of a comprehensive thermal renovation of public buildings, i.e. schools in the county of Sheierzyn: 1.ZS SP and GIM in the 7 938,11 cubic cup, m³, net of the building 2 760.50 m². The project envisages the installation of absorption-based pumping stations. for the installation of heat and heat pumps, together with the insulation of cables, the replacement of lighting on energy efficient with the installation,...) |
||
Property / summary | |||
Property / summary: The scope of the project consists of a comprehensive thermal renovation of public buildings, i.e. schools in the county of Sheierzyn: 1.ZS SP and GIM in the 7 938,11 cubic cup, m³, net of the building 2 760.50 m². The project envisages the installation of absorption-based pumping stations. for the installation of heat and heat pumps, together with the insulation of cables, the replacement of lighting on energy efficient with the installation, refurbishment of the installations as and for CWU pipelines, radiators, absorption heat pump with power output OK.115kW 114.90 kW, liquid meters for 2W and hot water of 1 pcs; 2.SP in Żurowa cup, heated 3 084.68 m³, with a net area of 1 426.81 m². A building which has been subject to thermal modernisation. The project provides for the conversion of a gas-fired boiler for the replacement of a gas condensing boiler with a power station of 129 kW with the installation of the necessary equipment and fittings, including the conversion of radiators for the replacement of radiators with thermal, regulatory and essential fittings, alterations to the cold water installation, the CWU and the circulation of the installation, together with the insulation of cables. A WU system for the installation of a reservoir with a j.500., a heating meter of 1, and a numerator for the CWU 1 meter. 3.ZS for a volume of 13 417.64 m³ for a net area of 3 158 m². A building which has been subject to thermal modernisation. In the design, the boilers for 2swell and all the installation of radiators, CWUs, lighting in the grid, and installation of a full-machine solar photovoltaic and full automatik.in-flow meters for 2hers and hot water 1 Plum.4.Type SP and GIM in Czermble cup, heated 4 933.03 m³, area. Net building 1 613 m². The building undergoing thermal modernisation in 2002, the project provides for the replacement of the CWU heaters currently in operation at a central part of the system consisting of two gas absorption gas pumps and two gas boilers with a total capacity of 145,4 Kw.Zakł.micro photofoolt.heat meters and CWU after 1 t (English) / rank | |||
Revision as of 11:23, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | “Improving the energy efficiency of public buildings in the county of Szrzyny” |
Project in Poland financed by DG Regio |
Statements
1,406,951.87 zloty
0 references
2,605,466.54 zloty
0 references
54.0 percent
0 references
31 August 2016
0 references
31 January 2020
0 references
GMINA SZERZYNY
0 references
Zakres projektu obejmuje kompleksową termomodernizację budynków użyteczności publicznej tj. szkół na terenie Gminy Szerzyny:1.ZS SP i Gim w Ołpinach kub. cz.ogrzewanej 7938,11m3, pow.netto budynku 2760,50m2.Budynek poddany termomodernizacji wcześniej. W projekcie przewiduje się instalacje absorpcyjnych pomp ciepła.Przeb.instal.c.w.u i cyrkulacji wraz z izolacją przewodów wymianę oświetlenia na energooszczędne wraz z instalacją fotowoltaiczną, przebudowę instalacji co i cwu rurociągi, grzejniki, absorpcyjna pompa ciepła o mocy OK.115kW 114,90kW, liczniki ciepła2szt i ciepłej wody 1 szt.;2.SP w Żurowej kubatura cz.ogrzewanej 3084,68m3, pow.netto budynku 1426,81m2. Budynek poddany termomodernizacji wcześniej. W projekcie przewiduje się przebudowę kotłowni gazowej polegającej na wymianie kotła na kocioł gazowy kondensacyjny o mocy 129kW wraz z montażem niezbędnych urządzeń i armatury, przebudowa instalacji c.o polegająca na wymianie grzejników wraz z montażem zaworów termostatycznych, regulacyjnych i niezbędnej armatury, przebudowa instalacji wody zimnej, cwu i cyrkulacjiwymiana instalacji wraz z izolacją przewodów. System cwu montaż zasobnika o poj.500l., licznik ciepla 1 szt i licznik cwu 1 szt.3.ZS w Szerzynach kubatura cz.ogrzewanej 13417,64m3, pow.netto budynku 3158m2. Budynek poddany termomodernizacji wcześniej. W projekcie przew. się wym.kotłów na 2szt i całej instalacji z grzejnikami włącznie,cwu, wym. oświetlenia na energo.oraz instalację fotowoltaiczną oraz zast. pełnej automatyki.liczniki ciepła2szt i ciepłej wody 1 szt.4.Zespół Szkól SP i Gim w Czermnej kubatura cz. ogrzewanej 4933,03m3, pow. Netto budynku 1613m2. Budynek poddany termomodernizacji w 2002 r. w projekcie przewiduje się wymianę aktualnie pracujących podgrzewaczy cwu na centralny system cocwu zestaw składający się z dwóch gazowych absorpcyjnych pomp ciepła i dwóch kotłów gazowych o łącznej mocy 145,4 Kw.Zakł.sie mikroinst. fotowolt.liczniki ciepła i cwu po 1szt (Polish)
0 references
Identifiers
RPMP.04.03.02-12-0293/16
0 references