Energy renovation of a School/Girl School Team in a Łomnicz Zdrój municipality in Piwnna — Zdrój (Q112262): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project is covered by a building group building in Łomnia-Zdrój. According to the energy audit of the building, it was decided to include the following works in the project: 1. Wall insulation, joinery replacement: — The replacement of a mechanical coupling installation with a new installation with thermostatic radiator (s) fitted with thermostatic radiator valves (with heads) and infrared valves; The insulation of the external wall of the...)
(‎Created claim: summary (P836): The project covers the building of the School Complex in Lomnica-Zdrój. In accordance with the energy audit carried out for the building, it was decided to include the following works on the project: 1. Wall warming, carpentry replacement: — Replacement of central heating system for a new installation with radiators equipped with thermostatic valves (including heads) and upholstery valves; — Warming of the external walls of light-wet technology,...)
Property / summary
 
The project covers the building of the School Complex in Lomnica-Zdrój. In accordance with the energy audit carried out for the building, it was decided to include the following works on the project: 1. Wall warming, carpentry replacement: — Replacement of central heating system for a new installation with radiators equipped with thermostatic valves (including heads) and upholstery valves; — Warming of the external walls of light-wet technology, where the thickness of the insulation layer will be 20 cm.; — The warming attic with a layer of insulation of 18 cm thick, arranged on the ceiling of the attic. — Warming of the attic over the connector with a thickness of 20 cm; — Insulated insulation with a thickness of 25 cm; — Exchange of window joinery (not yet mentioned) into woodwork (from PVC, AL. profiles or wood) with total Umax = 1,10 W/(m2K); — Replacement of wooden external doors (formerly not mentioned) for doors (from PVC, aluminium or wood) with a total factor Umax=1,30 W/(m2K). — Exchange of steel external doors (formerly not mentioned) for doors (from PVC, aluminium or wood) with a total factor Umax = 1,30 W/(m2K), – Modernisation of the lux by replacing them with a carpentry (from PVC, AL. profiles or wood) with a total factor Umax=1.10 W/(m2K). The project shall be characterised by the following indicators: 1. % Energy Efficiency Improvement Value: 49,5 %; 2. Heat meters are used in the project; 3. The energy audit of the building indicates the necessity of introducing devices that maintain the specified tempo through active operation (thermostates) and/or regulators of pressure difference (sub-vertical valves). The above-mentioned devices were used in the project. 4. % CO2 reduction: 48,5 %; 5. % particulate emission reduction (PM 10 and PM 2,5): IT’S 49.5 %. (English)
Property / summary: The project covers the building of the School Complex in Lomnica-Zdrój. In accordance with the energy audit carried out for the building, it was decided to include the following works on the project: 1. Wall warming, carpentry replacement: — Replacement of central heating system for a new installation with radiators equipped with thermostatic valves (including heads) and upholstery valves; — Warming of the external walls of light-wet technology, where the thickness of the insulation layer will be 20 cm.; — The warming attic with a layer of insulation of 18 cm thick, arranged on the ceiling of the attic. — Warming of the attic over the connector with a thickness of 20 cm; — Insulated insulation with a thickness of 25 cm; — Exchange of window joinery (not yet mentioned) into woodwork (from PVC, AL. profiles or wood) with total Umax = 1,10 W/(m2K); — Replacement of wooden external doors (formerly not mentioned) for doors (from PVC, aluminium or wood) with a total factor Umax=1,30 W/(m2K). — Exchange of steel external doors (formerly not mentioned) for doors (from PVC, aluminium or wood) with a total factor Umax = 1,30 W/(m2K), – Modernisation of the lux by replacing them with a carpentry (from PVC, AL. profiles or wood) with a total factor Umax=1.10 W/(m2K). The project shall be characterised by the following indicators: 1. % Energy Efficiency Improvement Value: 49,5 %; 2. Heat meters are used in the project; 3. The energy audit of the building indicates the necessity of introducing devices that maintain the specified tempo through active operation (thermostates) and/or regulators of pressure difference (sub-vertical valves). The above-mentioned devices were used in the project. 4. % CO2 reduction: 48,5 %; 5. % particulate emission reduction (PM 10 and PM 2,5): IT’S 49.5 %. (English) / rank
 
Normal rank
Property / summary: The project covers the building of the School Complex in Lomnica-Zdrój. In accordance with the energy audit carried out for the building, it was decided to include the following works on the project: 1. Wall warming, carpentry replacement: — Replacement of central heating system for a new installation with radiators equipped with thermostatic valves (including heads) and upholstery valves; — Warming of the external walls of light-wet technology, where the thickness of the insulation layer will be 20 cm.; — The warming attic with a layer of insulation of 18 cm thick, arranged on the ceiling of the attic. — Warming of the attic over the connector with a thickness of 20 cm; — Insulated insulation with a thickness of 25 cm; — Exchange of window joinery (not yet mentioned) into woodwork (from PVC, AL. profiles or wood) with total Umax = 1,10 W/(m2K); — Replacement of wooden external doors (formerly not mentioned) for doors (from PVC, aluminium or wood) with a total factor Umax=1,30 W/(m2K). — Exchange of steel external doors (formerly not mentioned) for doors (from PVC, aluminium or wood) with a total factor Umax = 1,30 W/(m2K), – Modernisation of the lux by replacing them with a carpentry (from PVC, AL. profiles or wood) with a total factor Umax=1.10 W/(m2K). The project shall be characterised by the following indicators: 1. % Energy Efficiency Improvement Value: 49,5 %; 2. Heat meters are used in the project; 3. The energy audit of the building indicates the necessity of introducing devices that maintain the specified tempo through active operation (thermostates) and/or regulators of pressure difference (sub-vertical valves). The above-mentioned devices were used in the project. 4. % CO2 reduction: 48,5 %; 5. % particulate emission reduction (PM 10 and PM 2,5): IT’S 49.5 %. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:23, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy renovation of a School/Girl School Team in a Łomnicz Zdrój municipality in Piwnna — Zdrój
Project in Poland financed by DG Regio

    Statements

    0 references
    746,266.83 zloty
    0 references
    179,104.04 Euro
    13 January 2020
    0 references
    1,243,778.06 zloty
    0 references
    298,506.73 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    2 May 2016
    0 references
    29 December 2017
    0 references
    MIASTO I GMINA PIWNICZNA-ZDRÓJ
    0 references
    0 references
    Projektem objęty jest budynek Zespołu Szkół w Łomnicy-Zdroju. Zgodnie z przeprowadzonym audytem energetycznym dla budynku zdecydowano się na ujęcie w zakresie projektu następujących prac: 1. Docieplenie ścian, wymiana stolarki: - Wymiana instalacji c.o.na nową instalację z grzejnikami wyposażonymi w zawory termostatyczne (wraz z głowicami) oraz zawory podpionowe; - Ocieplenie ścian zewnętrznych technologii lekkiej-mokrej, gdzie grubość warstwy izolacji wyniesie 20 cm.; - Ocieplenie poddasza warstwą izolacji o grubości 18 cm, układaną na stropie poddasza. - Ocieplenie poddasza nad łącznikiem warstwą izolacji o grubości 20 cm; - Ocieplenie stropodachu warstwą izolacji o grubości 25 cm; - Wymiana stolarki okiennej (dotychczas nie wymienionej) na stolarkę (z PCV, profili AL. lub drewna) o całkowitym współczynniku Umax=1,10 W/(m2K); - Wymiana drzwi zewnętrznych drewnianych (wcześniej nie wymienionych) na drzwi (z PCV, aluminium lub drewna) o całkowitym współczynniku Umax=1,30 W/(m2K). - Wymiana drzwi zewnętrznych stalowych (wcześniej nie wymienionych) na drzwi (z PCV, aluminium lub drewna) o całkowitym współczynniku Umax=1,30 W/(m2K), - Modernizacja luksfer poprzez zastąpienie ich stolarką (z PCV, profili AL. lub drewna) o całkowitym współczynniku Umax=1,10 W/(m2K). Projekt cechują następujące wskaźniki: 1. % wartość poprawy efektywności energetycznej: 49,5 %; 2. W projekcie zostały zastosowane liczniki ciepła; 3. Audyt energetyczny budynku wskazuje na konieczność wprowadzenia urządzeń utrzymujących zadaną temp. poprzez aktywne działanie (termostaty) i/lub regulatory różnicy ciśnień (zawory podpionowe). W projekcie zostały zastosowane ww. urządzenia. 4. % wartość redukcji emisji CO2: 48,5%; 5. % wartość obniżenia emisji pyłów (PM 10 i PM 2,5): 49,5%. (Polish)
    0 references
    The project covers the building of the School Complex in Lomnica-Zdrój. In accordance with the energy audit carried out for the building, it was decided to include the following works on the project: 1. Wall warming, carpentry replacement: — Replacement of central heating system for a new installation with radiators equipped with thermostatic valves (including heads) and upholstery valves; — Warming of the external walls of light-wet technology, where the thickness of the insulation layer will be 20 cm.; — The warming attic with a layer of insulation of 18 cm thick, arranged on the ceiling of the attic. — Warming of the attic over the connector with a thickness of 20 cm; — Insulated insulation with a thickness of 25 cm; — Exchange of window joinery (not yet mentioned) into woodwork (from PVC, AL. profiles or wood) with total Umax = 1,10 W/(m2K); — Replacement of wooden external doors (formerly not mentioned) for doors (from PVC, aluminium or wood) with a total factor Umax=1,30 W/(m2K). — Exchange of steel external doors (formerly not mentioned) for doors (from PVC, aluminium or wood) with a total factor Umax = 1,30 W/(m2K), – Modernisation of the lux by replacing them with a carpentry (from PVC, AL. profiles or wood) with a total factor Umax=1.10 W/(m2K). The project shall be characterised by the following indicators: 1. % Energy Efficiency Improvement Value: 49,5 %; 2. Heat meters are used in the project; 3. The energy audit of the building indicates the necessity of introducing devices that maintain the specified tempo through active operation (thermostates) and/or regulators of pressure difference (sub-vertical valves). The above-mentioned devices were used in the project. 4. % CO2 reduction: 48,5 %; 5. % particulate emission reduction (PM 10 and PM 2,5): IT’S 49.5 %. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.03.02-12-0258/16
    0 references