Improving the energy efficiency of the commercial and services building with residential housing in Chachło, taking into account the use of RES solutions. (Q112175): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The aim of the project is to increase the energy efficiency of the ‘Prodcom’ of the Rata Wójcik service by means of energy modernisation and the use of renewable energy solutions in a building located in Chachło, ul. The project involves, inter alia, a comprehensive thermal modernisation of the building as regards the warming of external walls, the roof and floor walls of the building, the replacement of 60 windows, the replacement of external...)
(‎Created claim: summary (P836): The aim of the project is to increase the energy efficiency of the company Produ,kcyjno Handlowo Usługowa Renata Wójcik through energy modernisation and the use of renewable energy solutions in a building located in Chechło on ul. Keyevej 1, in which the company operates commercially.The project assumes, among others, a comprehensive thermomodernisation of the building in the area of warming of external walls, roof and cellar walls of the buildi...)
Property / summary
 
The aim of the project is to increase the energy efficiency of the company Produ,kcyjno Handlowo Usługowa Renata Wójcik through energy modernisation and the use of renewable energy solutions in a building located in Chechło on ul. Keyevej 1, in which the company operates commercially.The project assumes, among others, a comprehensive thermomodernisation of the building in the area of warming of external walls, roof and cellar walls of the building, exchange of 60 windows, replacement of the external doors, change of heat source to the heat pump air water together with modernisation of the installation installation establishment, the commissioning of the necessary solar installation with a capacity of 30,8 kw in order to satisfy its own needs in the field of electricity, modernisation of the lighting and introduction of perlators for savings. The implementation of the planned investment will increase the energy efficiency of the project at the level of 59.2. The newly created photovoltaic installation will produce 30.218 MWherok electricity, which in 100 will be used for the energy needs of the building within which the investment will be carried out and will meet the company’s energy needs in about 30. Nowouruchomine heat pump will produce a total of 15.90 MWhtrok of thermal energy that meets the needs of the building. (English)
Property / summary: The aim of the project is to increase the energy efficiency of the company Produ,kcyjno Handlowo Usługowa Renata Wójcik through energy modernisation and the use of renewable energy solutions in a building located in Chechło on ul. Keyevej 1, in which the company operates commercially.The project assumes, among others, a comprehensive thermomodernisation of the building in the area of warming of external walls, roof and cellar walls of the building, exchange of 60 windows, replacement of the external doors, change of heat source to the heat pump air water together with modernisation of the installation installation establishment, the commissioning of the necessary solar installation with a capacity of 30,8 kw in order to satisfy its own needs in the field of electricity, modernisation of the lighting and introduction of perlators for savings. The implementation of the planned investment will increase the energy efficiency of the project at the level of 59.2. The newly created photovoltaic installation will produce 30.218 MWherok electricity, which in 100 will be used for the energy needs of the building within which the investment will be carried out and will meet the company’s energy needs in about 30. Nowouruchomine heat pump will produce a total of 15.90 MWhtrok of thermal energy that meets the needs of the building. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to increase the energy efficiency of the company Produ,kcyjno Handlowo Usługowa Renata Wójcik through energy modernisation and the use of renewable energy solutions in a building located in Chechło on ul. Keyevej 1, in which the company operates commercially.The project assumes, among others, a comprehensive thermomodernisation of the building in the area of warming of external walls, roof and cellar walls of the building, exchange of 60 windows, replacement of the external doors, change of heat source to the heat pump air water together with modernisation of the installation installation establishment, the commissioning of the necessary solar installation with a capacity of 30,8 kw in order to satisfy its own needs in the field of electricity, modernisation of the lighting and introduction of perlators for savings. The implementation of the planned investment will increase the energy efficiency of the project at the level of 59.2. The newly created photovoltaic installation will produce 30.218 MWherok electricity, which in 100 will be used for the energy needs of the building within which the investment will be carried out and will meet the company’s energy needs in about 30. Nowouruchomine heat pump will produce a total of 15.90 MWhtrok of thermal energy that meets the needs of the building. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:17, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the energy efficiency of the commercial and services building with residential housing in Chachło, taking into account the use of RES solutions.
Project in Poland financed by DG Regio

    Statements

    0 references
    875,763.22 zloty
    0 references
    210,183.17 Euro
    13 January 2020
    0 references
    1,116,266.53 zloty
    0 references
    267,903.97 Euro
    13 January 2020
    0 references
    78.45 percent
    0 references
    12 July 2019
    0 references
    12 July 2021
    0 references
    FIRMA PRODUKCYJNO- HANDLOWO - USŁUGOWA WÓJCIK RENATA
    0 references
    0 references
    Celem projektu jest podniesienie efektywności energetycznej firmy Produ,kcyjno Handlowo Usługowej Renata Wójcik poprzez modernizację energetyczną i zastosowanie rozwiązań wykorzystujących odnawialne źródła energii w budynku zlokalizowanym w miejscowości Chechło przy ul. Kluczewskiej 1, w którym firma prowadzi działalność handlowo usługową.Projekt zakłada m.in. kompleksową termomodernizację budynku w zakresie ocieplenia ścian zewnętrznych , dachu i ścian piwnic tego budynku, wymianę 60 okien, wymianę drzwi zewnętrznych, zmianę źródła ciepła na pompę ciepła powietrze woda wraz z modernizacją instalacji c.o., uruchomienie instalacji fotowoltaicznej o mocy 30,8 kw celem zaspokojenia własnych potrzeb w zakresie energii elektrycznej, modernizację oświetlenia i wprowadzenie perlatorów zapewniających oszczędności w zużyciu wody do 15.Planowana inwestycja jest odpowiedzią na zdiagnozowane potrzeby firmy, a jej zakres jest adekwatny do zakresu najbardziej optymalnego wariantu modernizacji energetycznej rozpatrywanego przez audytora energetycznego na etapie planowania inwestycji.Wnioskodawca zakłada wybór podwykonawców, którzy w możliwie największym stopniu zapewnią kompleksową terminową i zgodną z założeniami projektu realizację planowanej inwestycji.W wyniku realizacji projektu w tak zaplanowanym kształcie nastąpi ograniczenie kosztów eksploatacji budynku w którym prowadzona jest działalność firmy i zwiększenie wykorzystania OZE. Realizacja planowanej inwestycji przyczyni się do zwiększenia efektywności energetycznej w projekcie na poziomie 59,2 . Nowopowstała instalacja fotowoltaiczna wyprodukuje 30,218 MWherok energii elektrycznej co w 100 będzie wykorzystywane na potrzeby energetyczne budynku w ramach którego realizowana będzie inwestycja i w około 30 zaspokoi potrzeby energetyczne przedsiębiorstwa. Nowouruchomiona pompa ciepła wyprodukuje łącznie 15,90 MWhtrok energii cieplnej zaspokajającej potrzeby budynku. (Polish)
    0 references
    The aim of the project is to increase the energy efficiency of the company Produ,kcyjno Handlowo Usługowa Renata Wójcik through energy modernisation and the use of renewable energy solutions in a building located in Chechło on ul. Keyevej 1, in which the company operates commercially.The project assumes, among others, a comprehensive thermomodernisation of the building in the area of warming of external walls, roof and cellar walls of the building, exchange of 60 windows, replacement of the external doors, change of heat source to the heat pump air water together with modernisation of the installation installation establishment, the commissioning of the necessary solar installation with a capacity of 30,8 kw in order to satisfy its own needs in the field of electricity, modernisation of the lighting and introduction of perlators for savings. The implementation of the planned investment will increase the energy efficiency of the project at the level of 59.2. The newly created photovoltaic installation will produce 30.218 MWherok electricity, which in 100 will be used for the energy needs of the building within which the investment will be carried out and will meet the company’s energy needs in about 30. Nowouruchomine heat pump will produce a total of 15.90 MWhtrok of thermal energy that meets the needs of the building. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.02.00-12-0453/18
    0 references