Programme to increase the use of energy and to improve the quality of waste within NATURA 2000, Suian District — SOLARY, photovoltaics, CIEPŁA (Q112095): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project will purchase and assemble: 546 photovoltaic installations, 1365 solar installations and 89 air heat pumps within detached houses distributed with the works necessary for the equipment. Each design and installation of solar installations shall be designed to secure the energy coverage required to vaporise the useful water for each household at a minimum level of 55 at the scale of the whole colony. the solar collectors to be assemb...) |
(Created claim: summary (P836): The subject of the project will be the purchase and assembly of: 546 photovoltaic installations, 1365 solar installations and 89 air heat pumps within a single-family dispersed building, together with the work necessary for the operation of the said equipment. Each solar system designed and constructed shall secure the energy required to heat the water for each household at a minimum of 55 per year. The number of solar collectors to be installed...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project will be the purchase and assembly of: 546 photovoltaic installations, 1365 solar installations and 89 air heat pumps within a single-family dispersed building, together with the work necessary for the operation of the said equipment. Each solar system designed and constructed shall secure the energy required to heat the water for each household at a minimum of 55 per year. The number of solar collectors to be installed and the capacity of the hot water tank shall provide at least 50 litres of hot water per person per day with a temperature of 50 to 60 °C. Photovoltaic modules must have attested to the quality control authority confirming that the modules offered have undergone tests according to IEC procedures confirming their full compliance with the scope of PNEN 61215, PNEN 61646, PNEN 60891, PNEN 60904, PNEN 617302 and PNEN 61829 standards. All devices should have up-to-date tests and approvals for use in our country. The mounting of the cells must be made of non-corroding and non-corrosive material and must be authorised for use by the panel manufacturer. The photovoltaic set shall ensure proper interaction with existing electrical installations. The contractor must ensure that the PV installation is installed so that there is no blackout of the panels otherwise the optimisers are applied. Minimum parameters of intake heat pumps: heating power of heat pumps min. 2.0 kW, power of electric heater min. 2.0 kW, seasonal energy efficiency class ErP min. A COP efficiency according to PNEN 2553 min. 3.2 A15W1545Solar installations, photovoltaic heat pumps will be installed in the communes of:Budzów, Bystra Sidzina, Jordanów Municipality, Jordanów Municipality, Zawoja, Maków Podhalański Urban Municipality Srodzka, Stryszawa, Zerzyszawa (English) | |||||||||||||||
Property / summary: The subject of the project will be the purchase and assembly of: 546 photovoltaic installations, 1365 solar installations and 89 air heat pumps within a single-family dispersed building, together with the work necessary for the operation of the said equipment. Each solar system designed and constructed shall secure the energy required to heat the water for each household at a minimum of 55 per year. The number of solar collectors to be installed and the capacity of the hot water tank shall provide at least 50 litres of hot water per person per day with a temperature of 50 to 60 °C. Photovoltaic modules must have attested to the quality control authority confirming that the modules offered have undergone tests according to IEC procedures confirming their full compliance with the scope of PNEN 61215, PNEN 61646, PNEN 60891, PNEN 60904, PNEN 617302 and PNEN 61829 standards. All devices should have up-to-date tests and approvals for use in our country. The mounting of the cells must be made of non-corroding and non-corrosive material and must be authorised for use by the panel manufacturer. The photovoltaic set shall ensure proper interaction with existing electrical installations. The contractor must ensure that the PV installation is installed so that there is no blackout of the panels otherwise the optimisers are applied. Minimum parameters of intake heat pumps: heating power of heat pumps min. 2.0 kW, power of electric heater min. 2.0 kW, seasonal energy efficiency class ErP min. A COP efficiency according to PNEN 2553 min. 3.2 A15W1545Solar installations, photovoltaic heat pumps will be installed in the communes of:Budzów, Bystra Sidzina, Jordanów Municipality, Jordanów Municipality, Zawoja, Maków Podhalański Urban Municipality Srodzka, Stryszawa, Zerzyszawa (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project will be the purchase and assembly of: 546 photovoltaic installations, 1365 solar installations and 89 air heat pumps within a single-family dispersed building, together with the work necessary for the operation of the said equipment. Each solar system designed and constructed shall secure the energy required to heat the water for each household at a minimum of 55 per year. The number of solar collectors to be installed and the capacity of the hot water tank shall provide at least 50 litres of hot water per person per day with a temperature of 50 to 60 °C. Photovoltaic modules must have attested to the quality control authority confirming that the modules offered have undergone tests according to IEC procedures confirming their full compliance with the scope of PNEN 61215, PNEN 61646, PNEN 60891, PNEN 60904, PNEN 617302 and PNEN 61829 standards. All devices should have up-to-date tests and approvals for use in our country. The mounting of the cells must be made of non-corroding and non-corrosive material and must be authorised for use by the panel manufacturer. The photovoltaic set shall ensure proper interaction with existing electrical installations. The contractor must ensure that the PV installation is installed so that there is no blackout of the panels otherwise the optimisers are applied. Minimum parameters of intake heat pumps: heating power of heat pumps min. 2.0 kW, power of electric heater min. 2.0 kW, seasonal energy efficiency class ErP min. A COP efficiency according to PNEN 2553 min. 3.2 A15W1545Solar installations, photovoltaic heat pumps will be installed in the communes of:Budzów, Bystra Sidzina, Jordanów Municipality, Jordanów Municipality, Zawoja, Maków Podhalański Urban Municipality Srodzka, Stryszawa, Zerzyszawa (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 10:54, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Programme to increase the use of energy and to improve the quality of waste within NATURA 2000, Suian District — SOLARY, photovoltaics, CIEPŁA |
Project in Poland financed by DG Regio |
Statements
15,259,568.06 zloty
0 references
25,432,613.47 zloty
0 references
60.0 percent
0 references
1 September 2016
0 references
30 June 2021
0 references
POWIAT SUSKI
0 references
Przedmiotem projektu będzie zakup i montaż : 546 instalacji fotowoltaicznych, 1365 instalacji solarnych i 89 pomp ciepła powietrznych w obrębie budownictwa jednorodzinnego rozproszonego wraz z pracami niezbędnymi do funkcjonowania wymienionych urządzeń. Każda zaprojektowana i wykonana instalacja solarna powinna zabezpieczyć pokrycie na energię potrzebną do ogrzania wody użytkowej dla każdego gospodarstwa domowego na poziomie minimum 55 w skali całego roku. llość montowanych kolektorów słonecznych i pojemność zbiornika na ciepłą wodę powinna zapewniać przynajmniej 50 litrów ciepłej wody na osobędobę o temperaturze od 50 do 60C . Moduły fotowoltaiczne muszą posiadać zaświadczenia podmiotu uprawnionego do kontroli jakości potwierdzającego, że ofertowane moduły przeszły badania wg procedur IEC potwierdzające ich pełną zgodność z zakresem normy PNEN 61215, PNEN 61646, PNEN 60891, PNEN 60904, PNEN 617302 i PNEN 61829. Wszystkie urządzenia powinny posiadać aktualne badania i dopuszczenia do stosowania w naszym kraju. Mocowanie ogniw musi być wykonane z materiału nie korodującego i nie naruszającego struktury ogniwa i musi być dopuszczone do stosowania przez producenta paneli. Zestaw fotowoltaiczny musi zapewniać prawidłowe współdziałanie z istniejącymi instalacjami elektrycznymi.. Wykonawca zapewnić musi taki montaż instalacji PV aby nie dochodziło do jakiegokolwiek zaciemnienia paneli w przeciwnym razie zastosuje optymalizery. Minimalne parametry przyjętych pomp ciepła: moc grzewcza pompy ciepła min. 2,0 kW, moc grzałki elektrycznej min. 2,0 kW, klasa sezonowej efektywności energetycznej ErP min. A efektywność COP wg PNEN 2553 min. 3,2 A15W1545Instalacje solarne, fotowoltaiczne,pompy ciepła będą montowane na terenie gmin:Budzów, Bystra Sidzina, Jordanów gmina wiejska, Jordanów gmina miejska, Zawoja, Maków Podhalański gmina miejsko wiejska , Stryszawa, Zembrzyce , Sucha Beskidzka gmina miejska. (Polish)
0 references
The subject of the project will be the purchase and assembly of: 546 photovoltaic installations, 1365 solar installations and 89 air heat pumps within a single-family dispersed building, together with the work necessary for the operation of the said equipment. Each solar system designed and constructed shall secure the energy required to heat the water for each household at a minimum of 55 per year. The number of solar collectors to be installed and the capacity of the hot water tank shall provide at least 50 litres of hot water per person per day with a temperature of 50 to 60 °C. Photovoltaic modules must have attested to the quality control authority confirming that the modules offered have undergone tests according to IEC procedures confirming their full compliance with the scope of PNEN 61215, PNEN 61646, PNEN 60891, PNEN 60904, PNEN 617302 and PNEN 61829 standards. All devices should have up-to-date tests and approvals for use in our country. The mounting of the cells must be made of non-corroding and non-corrosive material and must be authorised for use by the panel manufacturer. The photovoltaic set shall ensure proper interaction with existing electrical installations. The contractor must ensure that the PV installation is installed so that there is no blackout of the panels otherwise the optimisers are applied. Minimum parameters of intake heat pumps: heating power of heat pumps min. 2.0 kW, power of electric heater min. 2.0 kW, seasonal energy efficiency class ErP min. A COP efficiency according to PNEN 2553 min. 3.2 A15W1545Solar installations, photovoltaic heat pumps will be installed in the communes of:Budzów, Bystra Sidzina, Jordanów Municipality, Jordanów Municipality, Zawoja, Maków Podhalański Urban Municipality Srodzka, Stryszawa, Zerzyszawa (English)
20 October 2020
0 references
Identifiers
RPMP.04.01.01-12-1094/17
0 references