Development of the infrastructure of the degraded area by building a building with a social function in the municipality of Izbica (Q107546): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The main objective of the project is to carry out a number of activities that will lead to the removal of a degraded region from a crisis situation, by demolition works and, subsequently, the construction of a building for the purposes of the Tourist and Cultural Centre. The scope of the project includes the creation of a building by the demolition of existing infrastructure and the subsequent construction of a complete building and the develo...)
(‎Created claim: summary (P836): The main objective of the project is to carry out a number of activities that will lead to the removal of the degraded area from the crisis, through demolition works and then the construction of the building for the purpose of the Tourism and Educational and Culture Centre. The scope of the project includes the construction of the facility by demolishing the existing infrastructure and then erecting a complete building and developing the area ar...)
Property / summary
 
The main objective of the project is to carry out a number of activities that will lead to the removal of the degraded area from the crisis, through demolition works and then the construction of the building for the purpose of the Tourism and Educational and Culture Centre. The scope of the project includes the construction of the facility by demolishing the existing infrastructure and then erecting a complete building and developing the area around it. The target group of the project, which will benefit directly from the implementation of the project at the level of its implementation, are residents of the Municipality of Izbica and, above all, residents of the degraded area. The implementation of the project will contribute to the attractiveness of public spaces, thanks to the following directions: —development of public space; —interference in the building to fulfil new social objectives; — creation of active rest zones; —implementation of activation training, compensatory workshops; —cultural accessibility (library). The Centre will contribute to creating an attractive alternative to leisure time, which will prevent the development of pathological behaviour. The project will create new jobs, improve air quality, reduce emissions of pollutants into the air through installation of renewable energy sources (solar collector) and use LED lighting. The implementation of the project will allow the achievement of the result indicators recorded in the Detailed Description of the priority axis relevant to the competition 13.4: a) Number of people using the social/cultural/tourism infrastructure facilities covered by the project – 1 500 people, b) Number of infrastructure facilities located in revitalised areas – 1 units c) Areas covered by the revitalisation 0,44 ha. (English)
Property / summary: The main objective of the project is to carry out a number of activities that will lead to the removal of the degraded area from the crisis, through demolition works and then the construction of the building for the purpose of the Tourism and Educational and Culture Centre. The scope of the project includes the construction of the facility by demolishing the existing infrastructure and then erecting a complete building and developing the area around it. The target group of the project, which will benefit directly from the implementation of the project at the level of its implementation, are residents of the Municipality of Izbica and, above all, residents of the degraded area. The implementation of the project will contribute to the attractiveness of public spaces, thanks to the following directions: —development of public space; —interference in the building to fulfil new social objectives; — creation of active rest zones; —implementation of activation training, compensatory workshops; —cultural accessibility (library). The Centre will contribute to creating an attractive alternative to leisure time, which will prevent the development of pathological behaviour. The project will create new jobs, improve air quality, reduce emissions of pollutants into the air through installation of renewable energy sources (solar collector) and use LED lighting. The implementation of the project will allow the achievement of the result indicators recorded in the Detailed Description of the priority axis relevant to the competition 13.4: a) Number of people using the social/cultural/tourism infrastructure facilities covered by the project – 1 500 people, b) Number of infrastructure facilities located in revitalised areas – 1 units c) Areas covered by the revitalisation 0,44 ha. (English) / rank
 
Normal rank
Property / summary: The main objective of the project is to carry out a number of activities that will lead to the removal of the degraded area from the crisis, through demolition works and then the construction of the building for the purpose of the Tourism and Educational and Culture Centre. The scope of the project includes the construction of the facility by demolishing the existing infrastructure and then erecting a complete building and developing the area around it. The target group of the project, which will benefit directly from the implementation of the project at the level of its implementation, are residents of the Municipality of Izbica and, above all, residents of the degraded area. The implementation of the project will contribute to the attractiveness of public spaces, thanks to the following directions: —development of public space; —interference in the building to fulfil new social objectives; — creation of active rest zones; —implementation of activation training, compensatory workshops; —cultural accessibility (library). The Centre will contribute to creating an attractive alternative to leisure time, which will prevent the development of pathological behaviour. The project will create new jobs, improve air quality, reduce emissions of pollutants into the air through installation of renewable energy sources (solar collector) and use LED lighting. The implementation of the project will allow the achievement of the result indicators recorded in the Detailed Description of the priority axis relevant to the competition 13.4: a) Number of people using the social/cultural/tourism infrastructure facilities covered by the project – 1 500 people, b) Number of infrastructure facilities located in revitalised areas – 1 units c) Areas covered by the revitalisation 0,44 ha. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:06, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of the infrastructure of the degraded area by building a building with a social function in the municipality of Izbica
Project in Poland financed by DG Regio

    Statements

    0 references
    3,880,626.96 zloty
    0 references
    931,350.47 Euro
    13 January 2020
    0 references
    4,565,443.52 zloty
    0 references
    1,095,706.44 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 September 2017
    0 references
    30 December 2021
    0 references
    GMINA IZBICA
    0 references
    0 references

    50°53'36.2"N, 23°9'33.1"E
    0 references
    Głównym celem projektu jest przeprowadzenie szeregu działań, które spowodują wyprowadzenie obszaru zdegradowanego z sytuacji kryzysowej, poprzez roboty rozbiórkowe a następnie wzniesienie obiektu budowlanego na cele Centrum Turystyczno-Edukacyjno-Kulturalnego. Zakres przedsięwzięcia obejmuje powstanie obiektu poprzez rozbiórkę istniejącej infrastruktury a następnie wzniesienie kompletnego budynku i zagospodarowanie terenu wokół niego. Grupę docelową projektu, która odniesie bezpośrednie korzyści z realizacji projektu na poziomie jego realizacji stanowią mieszkańcy Gminy Izbica, a przede wszystkim mieszkańcy obszaru zdegradowanego. Realizacja projektu przyczyni się do wzrostu atrakcyjności przestrzeni publicznej, dzięki kierunkom tj.: -zagospodarowanie przestrzeni publicznej; -ingerencja w budynek mający pełnić nowe cele społeczne; -tworzenie stref aktywnego wypoczynku; -realizacja szkoleń aktywizujących, warsztatów wyrównawczych; -dostępność kulturalna (biblioteka). Centrum przyczyni się do stworzenia atrakcyjnej alternatywy spędzania wolnego czasu, która zapobiegać będzie rozwojowi zachowań patologicznych. Realizacja projektu przyczyni się do powstania nowych miejsc pracy, poprawy jakości powietrza, zostanie zredukowana emisja zanieczyszczeń do powietrza poprzez montaż instalacji urządzeń wykorzystujących odnawialne źródła energii (kolektor słoneczny) oraz zastosowanie oświetlenia LED. Realizacja projektu pozwoli na osiągnięcie wskaźników rezultatu zapisanych w Szczegółowym Opisie Osi priorytetowych adekwatnych do konkursu 13.4 : a) Liczba osób korzystających z obiektów infrastruktury społecznej/kulturalnej/ turystycznej będącej przedmiotem projektu - 1 500 osób, b) Liczba obiektów infrastruktury zlokalizowanych na rewitalizowanych obszarach - 1 szt. c) Powierzchnia obszarów objętych rewitalizacją 0,44 ha. (Polish)
    0 references
    The main objective of the project is to carry out a number of activities that will lead to the removal of the degraded area from the crisis, through demolition works and then the construction of the building for the purpose of the Tourism and Educational and Culture Centre. The scope of the project includes the construction of the facility by demolishing the existing infrastructure and then erecting a complete building and developing the area around it. The target group of the project, which will benefit directly from the implementation of the project at the level of its implementation, are residents of the Municipality of Izbica and, above all, residents of the degraded area. The implementation of the project will contribute to the attractiveness of public spaces, thanks to the following directions: —development of public space; —interference in the building to fulfil new social objectives; — creation of active rest zones; —implementation of activation training, compensatory workshops; —cultural accessibility (library). The Centre will contribute to creating an attractive alternative to leisure time, which will prevent the development of pathological behaviour. The project will create new jobs, improve air quality, reduce emissions of pollutants into the air through installation of renewable energy sources (solar collector) and use LED lighting. The implementation of the project will allow the achievement of the result indicators recorded in the Detailed Description of the priority axis relevant to the competition 13.4: a) Number of people using the social/cultural/tourism infrastructure facilities covered by the project – 1 500 people, b) Number of infrastructure facilities located in revitalised areas – 1 units c) Areas covered by the revitalisation 0,44 ha. (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.13.04.00-06-0048/17