New quality of culture — improving accessibility to cultural resources through the modernisation and equipping of the performing room and selected theatrical scenes (Q109312): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The objective is to increase the capacity of tourism and to provide cultural resources for citizens and tourists visiting the capital by modernising and equipping them. They are planned to be located in the 3th of the following areas: 1. Modern Warsaw — Modern Teatr., in the context of which repairs will be carried out, including, inter alia, halting the degradation of the heritage site — the NDP, the Teatru site, and the replacement of the co...)
(‎Created claim: summary (P836): The aim of the project is to increase the potential of tourists. and access to cultural resources for residents and tourists visiting the capital by modernising and equipping the showroom and selected theatre scenes of the city. 3 depth of investment is planned: 1. Modern. stages of the Dramatic Theatre, among others, the W-wa Theatre, which will include works designed to inhibit the degradation processes of the historic object – PKiN, the headq...)
Property / summary
 
The aim of the project is to increase the potential of tourists. and access to cultural resources for residents and tourists visiting the capital by modernising and equipping the showroom and selected theatre scenes of the city. 3 depth of investment is planned: 1. Modern. stages of the Dramatic Theatre, among others, the W-wa Theatre, which will include works designed to inhibit the degradation processes of the historic object – PKiN, the headquarters of the Theatre, by replacing the ceiling structure over one of the scenes, replacing the flooring of the stage: Small (MS) and Large (DS), modern MS auditorium and repair of electric barbells. D.D. Infrastr is also planned. The theatre for the needs of the Part-Party and the creation of an auditory and inductive loop to facilitate the reception of the art of people. You will also be modern. acoustics and installed air conditioning on DS. In addition, some of the cult goods available to the Theatre will be digitised and made available on the Internet. 2. Purchase of equipment. for the Stage of the Large Universal Theatre in W-wa, located in the area covered by the revitalisation threshold. As part of the project, it is planned to install modern lighting and purchase audiovisual equipment for the equipment of the Large Stage. There will also be a purchase. a disk matrix for digital archiving of performances and extension will be the work resulting from the energet audit. 3. Buy equipment for the Widowiskowa Hall of the Białołęki Cultural Centre, thanks to which the object will be prepared to act as a local cult centre. As part of the new building, modern equipment and elements of stage mechanics will be installed, illuminating the technological stage and sound system. The audience will be equipped with armchairs, including for part-time. It is also envisaged to execute external elements of the institution, selected in the context of the competition architect.-urbanist. In addition to the above-mentioned investments, it is planned to develop the cult offer.-edu., including in cooperation with partners. Thanks to the project, visits are expected to increase in the first supported culture by more than 1 (English)
Property / summary: The aim of the project is to increase the potential of tourists. and access to cultural resources for residents and tourists visiting the capital by modernising and equipping the showroom and selected theatre scenes of the city. 3 depth of investment is planned: 1. Modern. stages of the Dramatic Theatre, among others, the W-wa Theatre, which will include works designed to inhibit the degradation processes of the historic object – PKiN, the headquarters of the Theatre, by replacing the ceiling structure over one of the scenes, replacing the flooring of the stage: Small (MS) and Large (DS), modern MS auditorium and repair of electric barbells. D.D. Infrastr is also planned. The theatre for the needs of the Part-Party and the creation of an auditory and inductive loop to facilitate the reception of the art of people. You will also be modern. acoustics and installed air conditioning on DS. In addition, some of the cult goods available to the Theatre will be digitised and made available on the Internet. 2. Purchase of equipment. for the Stage of the Large Universal Theatre in W-wa, located in the area covered by the revitalisation threshold. As part of the project, it is planned to install modern lighting and purchase audiovisual equipment for the equipment of the Large Stage. There will also be a purchase. a disk matrix for digital archiving of performances and extension will be the work resulting from the energet audit. 3. Buy equipment for the Widowiskowa Hall of the Białołęki Cultural Centre, thanks to which the object will be prepared to act as a local cult centre. As part of the new building, modern equipment and elements of stage mechanics will be installed, illuminating the technological stage and sound system. The audience will be equipped with armchairs, including for part-time. It is also envisaged to execute external elements of the institution, selected in the context of the competition architect.-urbanist. In addition to the above-mentioned investments, it is planned to develop the cult offer.-edu., including in cooperation with partners. Thanks to the project, visits are expected to increase in the first supported culture by more than 1 (English) / rank
 
Normal rank
Property / summary: The aim of the project is to increase the potential of tourists. and access to cultural resources for residents and tourists visiting the capital by modernising and equipping the showroom and selected theatre scenes of the city. 3 depth of investment is planned: 1. Modern. stages of the Dramatic Theatre, among others, the W-wa Theatre, which will include works designed to inhibit the degradation processes of the historic object – PKiN, the headquarters of the Theatre, by replacing the ceiling structure over one of the scenes, replacing the flooring of the stage: Small (MS) and Large (DS), modern MS auditorium and repair of electric barbells. D.D. Infrastr is also planned. The theatre for the needs of the Part-Party and the creation of an auditory and inductive loop to facilitate the reception of the art of people. You will also be modern. acoustics and installed air conditioning on DS. In addition, some of the cult goods available to the Theatre will be digitised and made available on the Internet. 2. Purchase of equipment. for the Stage of the Large Universal Theatre in W-wa, located in the area covered by the revitalisation threshold. As part of the project, it is planned to install modern lighting and purchase audiovisual equipment for the equipment of the Large Stage. There will also be a purchase. a disk matrix for digital archiving of performances and extension will be the work resulting from the energet audit. 3. Buy equipment for the Widowiskowa Hall of the Białołęki Cultural Centre, thanks to which the object will be prepared to act as a local cult centre. As part of the new building, modern equipment and elements of stage mechanics will be installed, illuminating the technological stage and sound system. The audience will be equipped with armchairs, including for part-time. It is also envisaged to execute external elements of the institution, selected in the context of the competition architect.-urbanist. In addition to the above-mentioned investments, it is planned to develop the cult offer.-edu., including in cooperation with partners. Thanks to the project, visits are expected to increase in the first supported culture by more than 1 (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:53, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
New quality of culture — improving accessibility to cultural resources through the modernisation and equipping of the performing room and selected theatrical scenes
Project in Poland financed by DG Regio

    Statements

    0 references
    4,904,451.98 zloty
    0 references
    1,177,068.48 Euro
    13 January 2020
    0 references
    6,289,371.62 zloty
    0 references
    1,509,449.19 Euro
    13 January 2020
    0 references
    77.98 percent
    0 references
    30 June 2015
    0 references
    30 November 2018
    0 references
    MIASTO STOŁECZNE WARSZAWA
    0 references
    0 references

    52°14'1.3"N, 21°4'17.0"E
    0 references
    Celem gł. proj. jest zwiększenie potencjału turyst. i dost. do zasobów kultury dla mieszkańców i turystów odwiedzających stolicę poprzez modernizację i wyposaż. sali widowiskowej oraz wybranych scen teatralnych m.st. W-wy. Planowane są 3 gł. zad. inwest.: 1. Modern. scen Teatru Dramatycznego m.st. W-wy, w ramach którego przepr. zostaną prace służące m.in. do zahamowania procesów degradacji obiektu zabytkowego – PKiN, siedziby Teatru, poprzez wymianę konstrukcji stropu nad jedną ze scen, wymianę podłóg scen: Małej (MS) i Dużej (DS), modern. widowni MS oraz remont sztankietów elektr. DS. Planowane jest także dostos. infrastr. Teatru do potrzeb os. z niepełnosp. oraz utworzenie pętli słuchowo–indukcyjnej ułatwiającej odbiór sztuki os. niedosł. lub niewidomym. Zostanie również zmodern. akustyka i zainstalowana klimatyzacja na DS. Dodatkowo, część dóbr kult., jakimi dysponuje Teatr zostanie zdigitalizowana i udost. w Internecie. 2. Zakup wyposaż. dla Sceny Dużej Teatru Powszechnego im. Z.Hubnera w W-wie, zlokaliz. na obszarze objętym progr. rewitalizacji. W ramach zad. planowany jest montaż nowoczesnego oświetl. oraz zakup sprzętu audiowiz. do wyposażenia Sceny Dużej. Zostanie również zakup. macierz dyskowa do archiwizacji cyfrowej spektakli oraz przepr. zostaną prace wynikające z audytu energet. 3. Zakup wyposaż. dla Sali Widowiskowej Białołęckiego Ośrodka Kultury, dzięki którym obiekt będzie przygot. do pełnienia roli lokalnego centrum kult. W ramach zad. w nowopowst. sali zostaną zainstalowane nowoczesne urządzenia i elementy mechaniki scenicznej, oświetl. technologicznego sceny oraz nagłośnienia. Widownia zostanie wyposaż. w fotele, w tym dla os. niepełnosp. Przewiduje się również wykonanie zewn. elementów ident. placówki, wybranych w ramach konkursu architekt.-urbanist. Oprócz ww. inwestycji, planowany jest rozwój oferty kult.-edu., w tym we współpr. z partnerami. Dzięki proj. oczekuje się wzrostu odwiedzin w inst. kultury objętych wsparciem łącznie o ponad 1 (Polish)
    0 references
    The aim of the project is to increase the potential of tourists. and access to cultural resources for residents and tourists visiting the capital by modernising and equipping the showroom and selected theatre scenes of the city. 3 depth of investment is planned: 1. Modern. stages of the Dramatic Theatre, among others, the W-wa Theatre, which will include works designed to inhibit the degradation processes of the historic object – PKiN, the headquarters of the Theatre, by replacing the ceiling structure over one of the scenes, replacing the flooring of the stage: Small (MS) and Large (DS), modern MS auditorium and repair of electric barbells. D.D. Infrastr is also planned. The theatre for the needs of the Part-Party and the creation of an auditory and inductive loop to facilitate the reception of the art of people. You will also be modern. acoustics and installed air conditioning on DS. In addition, some of the cult goods available to the Theatre will be digitised and made available on the Internet. 2. Purchase of equipment. for the Stage of the Large Universal Theatre in W-wa, located in the area covered by the revitalisation threshold. As part of the project, it is planned to install modern lighting and purchase audiovisual equipment for the equipment of the Large Stage. There will also be a purchase. a disk matrix for digital archiving of performances and extension will be the work resulting from the energet audit. 3. Buy equipment for the Widowiskowa Hall of the Białołęki Cultural Centre, thanks to which the object will be prepared to act as a local cult centre. As part of the new building, modern equipment and elements of stage mechanics will be installed, illuminating the technological stage and sound system. The audience will be equipped with armchairs, including for part-time. It is also envisaged to execute external elements of the institution, selected in the context of the competition architect.-urbanist. In addition to the above-mentioned investments, it is planned to develop the cult offer.-edu., including in cooperation with partners. Thanks to the project, visits are expected to increase in the first supported culture by more than 1 (English)
    20 October 2020
    0 references

    Identifiers

    RPMA.05.03.00-14-5980/16
    0 references