Decarbonisation of public utility buildings in Pułtusk Municipality (Q108941): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): At the same time, the project aims at thermo-modernisation with the use of RES and replacing lighting with energy efficient 8 public buildings: The Public Primary School in Bobach, Public Primary School. John Paul II in Płock and in Pułtowsk: The Public Library, Joachma Lelewela, Public Ghimpeszum 1, Hala Sportowa at ZS No 4, MOSiR, ZS No 2 and Siłownia. The project has produced energy and lighting audits showing that the buildings which are t...)
(‎Created claim: summary (P836): The subject of the project and at the same time the aim of the project is to modernise with the use of RES and to replace lighting with energy-efficient 8 public buildings: Public Elementary School in Boby, Public Primary School Bl. John Paul II in Płocochów and Pułtusk: Joachim Lelewel Public Library, Public High School No. 1, Sports Hall at ZS Nr 4, MOSiR, ZS No. 2 and Siłownia. As part of the project, energy audits and lighting have been prep...)
Property / summary
 
The subject of the project and at the same time the aim of the project is to modernise with the use of RES and to replace lighting with energy-efficient 8 public buildings: Public Elementary School in Boby, Public Primary School Bl. John Paul II in Płocochów and Pułtusk: Joachim Lelewel Public Library, Public High School No. 1, Sports Hall at ZS Nr 4, MOSiR, ZS No. 2 and Siłownia. As part of the project, energy audits and lighting have been prepared indicating that the buildings concerned by the project do not meet current thermal insulation standards, contributing to adverse effects on the quality of the environment. The measures provided for in the project result in an improvement of the energy efficiency defined for final energy by 67.96 %. The implementation of the project will reduce the demand for energy, which in addition to the measurable economic advantage of reducing operating costs, will help to reduce the amount of pollutants entering the air. The project will be implemented in Pułtusk commune, but will have a positive impact on the whole region, while the target group will be local residents. The project’s work will consist of: on insulation of external walls with a polystyrene layer, replacement of window and door joinery, insulation of stropodache, modernisation of central heating system, modernisation of ventilation system, use of heat pumps, exchange of lighting for energy efficient, installation of photovoltaic installation and modernisation of heat sources. The scope of work needed to be carried out on individual facilities has been defined in energy audits and lighting audits. The project will carry out information and promotion activities and develop: Functional and utility programme, feasibility study, energy audits and lighting and ex post. The project will be divided into stages: preparatory (development of documentation), execution of tenders, construction and settlement (English)
Property / summary: The subject of the project and at the same time the aim of the project is to modernise with the use of RES and to replace lighting with energy-efficient 8 public buildings: Public Elementary School in Boby, Public Primary School Bl. John Paul II in Płocochów and Pułtusk: Joachim Lelewel Public Library, Public High School No. 1, Sports Hall at ZS Nr 4, MOSiR, ZS No. 2 and Siłownia. As part of the project, energy audits and lighting have been prepared indicating that the buildings concerned by the project do not meet current thermal insulation standards, contributing to adverse effects on the quality of the environment. The measures provided for in the project result in an improvement of the energy efficiency defined for final energy by 67.96 %. The implementation of the project will reduce the demand for energy, which in addition to the measurable economic advantage of reducing operating costs, will help to reduce the amount of pollutants entering the air. The project will be implemented in Pułtusk commune, but will have a positive impact on the whole region, while the target group will be local residents. The project’s work will consist of: on insulation of external walls with a polystyrene layer, replacement of window and door joinery, insulation of stropodache, modernisation of central heating system, modernisation of ventilation system, use of heat pumps, exchange of lighting for energy efficient, installation of photovoltaic installation and modernisation of heat sources. The scope of work needed to be carried out on individual facilities has been defined in energy audits and lighting audits. The project will carry out information and promotion activities and develop: Functional and utility programme, feasibility study, energy audits and lighting and ex post. The project will be divided into stages: preparatory (development of documentation), execution of tenders, construction and settlement (English) / rank
 
Normal rank
Property / summary: The subject of the project and at the same time the aim of the project is to modernise with the use of RES and to replace lighting with energy-efficient 8 public buildings: Public Elementary School in Boby, Public Primary School Bl. John Paul II in Płocochów and Pułtusk: Joachim Lelewel Public Library, Public High School No. 1, Sports Hall at ZS Nr 4, MOSiR, ZS No. 2 and Siłownia. As part of the project, energy audits and lighting have been prepared indicating that the buildings concerned by the project do not meet current thermal insulation standards, contributing to adverse effects on the quality of the environment. The measures provided for in the project result in an improvement of the energy efficiency defined for final energy by 67.96 %. The implementation of the project will reduce the demand for energy, which in addition to the measurable economic advantage of reducing operating costs, will help to reduce the amount of pollutants entering the air. The project will be implemented in Pułtusk commune, but will have a positive impact on the whole region, while the target group will be local residents. The project’s work will consist of: on insulation of external walls with a polystyrene layer, replacement of window and door joinery, insulation of stropodache, modernisation of central heating system, modernisation of ventilation system, use of heat pumps, exchange of lighting for energy efficient, installation of photovoltaic installation and modernisation of heat sources. The scope of work needed to be carried out on individual facilities has been defined in energy audits and lighting audits. The project will carry out information and promotion activities and develop: Functional and utility programme, feasibility study, energy audits and lighting and ex post. The project will be divided into stages: preparatory (development of documentation), execution of tenders, construction and settlement (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:21, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Decarbonisation of public utility buildings in Pułtusk Municipality
Project in Poland financed by DG Regio

    Statements

    0 references
    5,920,304.63 zloty
    0 references
    1,420,873.11 Euro
    13 January 2020
    0 references
    7,401,305.95 zloty
    0 references
    1,776,313.43 Euro
    13 January 2020
    0 references
    79.99 percent
    0 references
    12 August 2015
    0 references
    31 January 2019
    0 references
    GMINA PUŁTUSK
    0 references

    52°42'18.4"N, 21°5'2.4"E
    0 references
    Przedmiotem, a zarazem celem projektu jest termomodernizacja wraz z wykorzystaniem OZE i wymianą oświetlenia na energooszczędne 8 budynków użyteczności publicznej: Publiczna Szkoła Podstawowa w Bobach, Publiczna Szkoła Podstawowa im. bł. Jana Pawła II w Płocochowie oraz w Pułtusku: Biblioteka Publiczna im. Joachima Lelewela, Publiczne Gimnazjum nr 1, Hala Sportowa przy ZS Nr 4, MOSiR, ZS nr 2 i Siłownia. W ramach projektu zostały sporządzone audyty energetyczne i oświetlania wskazujące, iż budynki będące przedmiotem projektu nie spełniają aktualnych norm termoizolacyjnych, przyczyniając się do niekorzystnego wpływu na jakość środowiska atmosferycznego. Przewidziane w projekcie działania skutkują poprawą efektywności energetycznej określonej dla energii końcowej o 67,96%. Dzięki realizacji projektu nastąpi zmniejszenie zapotrzebowania na energię, co poza wymierną korzyścią ekonomiczną związaną z obniżeniem kosztów eksploatacyjnych, przyczyni się do zmniejszenia ilości zanieczyszczeń wprowadzanych do powietrza. Projekt będzie realizowany na terenie Gminy Pułtusk, jednakże oddziaływał będzie pozytywnie na cały region, grupą docelową będą natomiast mieszkańcy Gminy. Prace w projekcie polegać będą: na ociepleniu ścian zewnętrznych warstwą styropianu, wymianie stolarki okiennej i drzwiowej, ociepleniu stropodachów, modernizacji instalacji c.o., modernizacji instalacji wentylacji, zastosowaniu pomp ciepła, wymianie oświetlenia na energooszczędne, montażu instalacji fotowoltaicznej i modernizacji źródeł ciepła. Zakres prac niezbędnych do wykonania na poszczególnych obiektach został określony w audytach energetycznych oraz audytach oświetlenia. W projekcie wykonane będą działania informacyjno-promocyjne i opracowanie: Programu Funkcjonalno-Użytkowego, Studium Wykonalności, audytów energetycznych i oświetlenia oraz ex post. Projekt będzie podzielony na etapy: przygotowawczy(opracowanie dokumentacji), realizacji przetargów, budowy, rozliczenia (Polish)
    0 references
    The subject of the project and at the same time the aim of the project is to modernise with the use of RES and to replace lighting with energy-efficient 8 public buildings: Public Elementary School in Boby, Public Primary School Bl. John Paul II in Płocochów and Pułtusk: Joachim Lelewel Public Library, Public High School No. 1, Sports Hall at ZS Nr 4, MOSiR, ZS No. 2 and Siłownia. As part of the project, energy audits and lighting have been prepared indicating that the buildings concerned by the project do not meet current thermal insulation standards, contributing to adverse effects on the quality of the environment. The measures provided for in the project result in an improvement of the energy efficiency defined for final energy by 67.96 %. The implementation of the project will reduce the demand for energy, which in addition to the measurable economic advantage of reducing operating costs, will help to reduce the amount of pollutants entering the air. The project will be implemented in Pułtusk commune, but will have a positive impact on the whole region, while the target group will be local residents. The project’s work will consist of: on insulation of external walls with a polystyrene layer, replacement of window and door joinery, insulation of stropodache, modernisation of central heating system, modernisation of ventilation system, use of heat pumps, exchange of lighting for energy efficient, installation of photovoltaic installation and modernisation of heat sources. The scope of work needed to be carried out on individual facilities has been defined in energy audits and lighting audits. The project will carry out information and promotion activities and develop: Functional and utility programme, feasibility study, energy audits and lighting and ex post. The project will be divided into stages: preparatory (development of documentation), execution of tenders, construction and settlement (English)