Production of energy from RES at the Regional Economic Zone: (Q104974): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project will consist of the construction of a photovoltaic installation on a plot of land at ul. Shore side 51, at the heart of the storm. The PV system will be permanently connected to the electricity grid. Any surplus electricity produced by the photocell will be resold to the electricity network manager. The following shall be included in the composition of the photovoltaic installation: 290Wp polycrystalline cells with Wp — 152 cells w...) |
(Created claim: summary (P836): The project will consist of the construction of a photovoltaic installation on a land plot at ul. Gorajska 51 in Szczebrzeszyn. The photovoltaic system will be permanently connected to the power grid. Any excess electricity produced by photovoltaic cells will be resold to the electricity grid manager. The photovoltaic installation will include: polycrystalline photovoltaic cells with a power of 290 Wp – 152 pcs with fittings; three-phase photovo...) |
||||||||||||||
Property / summary | |||||||||||||||
The project will consist of the construction of a photovoltaic installation on a land plot at ul. Gorajska 51 in Szczebrzeszyn. The photovoltaic system will be permanently connected to the power grid. Any excess electricity produced by photovoltaic cells will be resold to the electricity grid manager. The photovoltaic installation will include: polycrystalline photovoltaic cells with a power of 290 Wp – 152 pcs with fittings; three-phase photovoltaic inverters with a maximum power of 20 kW – 2 kpl., DC protection, AC protection, power management system (TIK) and others. Complete the works in accordance with the design and regulations of the PBUE, PN, OSH and Construction Law. The installed equipment will be brand new and will have a minimum 5-year warranty of the manufacturer, and the entire installation will be covered by a 3-year warranty. Installation parameters: input power Pp = 40,00 kW; generator area PV = 254,9 sqm, energy produced by the PV system (AC network) 49.541 kWh; own energy consumption (the applicant’s own needs) 33.619 kWh; energy delivered to the grid of 15.923 kWh; Special yearly yield: 1123,90 kWh/kWp; performance ratio (PR): 90,7 %; share of own energy consumption to all energy: 67,9 %; avoidable CO emissions: 40.228 kg/year. The construction of the plant and then its operation are environmentally neutral – there is no pollution, no water consumption or waste generation. (English) | |||||||||||||||
Property / summary: The project will consist of the construction of a photovoltaic installation on a land plot at ul. Gorajska 51 in Szczebrzeszyn. The photovoltaic system will be permanently connected to the power grid. Any excess electricity produced by photovoltaic cells will be resold to the electricity grid manager. The photovoltaic installation will include: polycrystalline photovoltaic cells with a power of 290 Wp – 152 pcs with fittings; three-phase photovoltaic inverters with a maximum power of 20 kW – 2 kpl., DC protection, AC protection, power management system (TIK) and others. Complete the works in accordance with the design and regulations of the PBUE, PN, OSH and Construction Law. The installed equipment will be brand new and will have a minimum 5-year warranty of the manufacturer, and the entire installation will be covered by a 3-year warranty. Installation parameters: input power Pp = 40,00 kW; generator area PV = 254,9 sqm, energy produced by the PV system (AC network) 49.541 kWh; own energy consumption (the applicant’s own needs) 33.619 kWh; energy delivered to the grid of 15.923 kWh; Special yearly yield: 1123,90 kWh/kWp; performance ratio (PR): 90,7 %; share of own energy consumption to all energy: 67,9 %; avoidable CO emissions: 40.228 kg/year. The construction of the plant and then its operation are environmentally neutral – there is no pollution, no water consumption or waste generation. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project will consist of the construction of a photovoltaic installation on a land plot at ul. Gorajska 51 in Szczebrzeszyn. The photovoltaic system will be permanently connected to the power grid. Any excess electricity produced by photovoltaic cells will be resold to the electricity grid manager. The photovoltaic installation will include: polycrystalline photovoltaic cells with a power of 290 Wp – 152 pcs with fittings; three-phase photovoltaic inverters with a maximum power of 20 kW – 2 kpl., DC protection, AC protection, power management system (TIK) and others. Complete the works in accordance with the design and regulations of the PBUE, PN, OSH and Construction Law. The installed equipment will be brand new and will have a minimum 5-year warranty of the manufacturer, and the entire installation will be covered by a 3-year warranty. Installation parameters: input power Pp = 40,00 kW; generator area PV = 254,9 sqm, energy produced by the PV system (AC network) 49.541 kWh; own energy consumption (the applicant’s own needs) 33.619 kWh; energy delivered to the grid of 15.923 kWh; Special yearly yield: 1123,90 kWh/kWp; performance ratio (PR): 90,7 %; share of own energy consumption to all energy: 67,9 %; avoidable CO emissions: 40.228 kg/year. The construction of the plant and then its operation are environmentally neutral – there is no pollution, no water consumption or waste generation. (English) / qualifier | |||||||||||||||
point in time: 17 October 2020
|
Revision as of 17:33, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Production of energy from RES at the Regional Economic Zone: |
Project in Poland financed by DG Regio |
Statements
90,168.08 zloty
0 references
200,373.52 zloty
0 references
45.0 percent
0 references
1 February 2018
0 references
28 December 2018
0 references
ZAKŁAD GOSPODARKI KOMUNALNEJ W SZCZEBRZESZYNIE SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Projekt polegać będzie na budowie instalacji fotowoltaicznej na działce gruntowej przy ul. Gorajskiej 51 w Szczebrzeszynie. System fotowoltaiczny podłączony będzie na stałe do sieci elektroenergetycznej. Ewentualna nadwyżka energii elektrycznej wyprodukowana przez fotoogniwa odsprzedawana będzie zarządcy sieci elektroenergetycznej. W skład instalacji fotowoltaicznej wchodzić będą: ogniwa fotowoltaiczne polikrystaliczne o mocy 290 Wp - 152 szt. wraz z osprzętem do montażu; inwertery fotowoltaiczne trójfazowe o mocy maksymalnej 20kW - 2 kpl., zabezpieczenia po stronie prądu stałego, zabezpieczenia po stronie prądu zmiennego, system zarządzania elektrownią (TIK) i inne. Całość robót wykonać zgodnie z projektem i przepisami PBUE, PN, BHP i Prawa Budowlanego. Instalowany sprzęt będzie fabrycznie nowy i będzie posiadać minimum 5-letnią gwarancję producenta, a całość instalacji będzie objęta 3-letnią rękojmią. Parametry instalacji: moc przyłączeniowa wprowadzana Pp = 40,00 kW; powierzchnia generatora PV = 254,9 mkw., energia wyprodukowana przez system PV (sieć AC) 49.541 kWh; konsumpcja własna energii (potrzeby własne wnioskodawcy) 33.619 kWh; energia oddana do sieci 15.923 kWh; Spec. uzysk roczny: 1.123,90 kWh/kWp; stosunek wydajności (PR): 90,7%; udział konsumpcji własnej energii do całości energii: 67,9%; emisja CO , której dało się uniknąć: 40.228 kg/ rok. Budowa instalacji, a następnie jej eksploatacja, są neutralne dla środowiska naturalnego - nie występuje emisja zanieczyszczeń, zużycie wody czy generowanie odpadów. (Polish)
0 references
The project will consist of the construction of a photovoltaic installation on a land plot at ul. Gorajska 51 in Szczebrzeszyn. The photovoltaic system will be permanently connected to the power grid. Any excess electricity produced by photovoltaic cells will be resold to the electricity grid manager. The photovoltaic installation will include: polycrystalline photovoltaic cells with a power of 290 Wp – 152 pcs with fittings; three-phase photovoltaic inverters with a maximum power of 20 kW – 2 kpl., DC protection, AC protection, power management system (TIK) and others. Complete the works in accordance with the design and regulations of the PBUE, PN, OSH and Construction Law. The installed equipment will be brand new and will have a minimum 5-year warranty of the manufacturer, and the entire installation will be covered by a 3-year warranty. Installation parameters: input power Pp = 40,00 kW; generator area PV = 254,9 sqm, energy produced by the PV system (AC network) 49.541 kWh; own energy consumption (the applicant’s own needs) 33.619 kWh; energy delivered to the grid of 15.923 kWh; Special yearly yield: 1123,90 kWh/kWp; performance ratio (PR): 90,7 %; share of own energy consumption to all energy: 67,9 %; avoidable CO emissions: 40.228 kg/year. The construction of the plant and then its operation are environmentally neutral – there is no pollution, no water consumption or waste generation. (English)
17 October 2020
0 references
Identifiers
RPLU.04.02.00-06-0209/17
0 references