Construction of photovoltaic installations in the villages Ludwinów and Krepiec (Q104841): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Construction of photovoltaic installations in the villages Ludwinów and Krepiec

Revision as of 16:59, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of photovoltaic installations in the villages Ludwinów and Krepiec
Project in Poland financed by DG Regio

    Statements

    0 references
    1,350,723.17 zloty
    0 references
    324,173.56 Euro
    13 January 2020
    0 references
    1,795,219.53 zloty
    0 references
    430,852.69 Euro
    13 January 2020
    0 references
    75.24 percent
    0 references
    1 March 2018
    0 references
    10 July 2019
    0 references
    SŁOMKA ROBERT "CEJSI-CAR" ROBERT SŁOMKA
    0 references
    0 references
    Przedmiotem projektu jest budowa elektrowni fotowoltaicznej o mocy zainstalowanej 0,6 MW oraz linii kablowej SN na działkach nr 125, 111, 67 i 117 w obrębie Gminy Cyców oraz wykonanie instalacji fotowoltaicznej o mocy zainstalowanej 0,031 MW pokrywającej potrzeby własne przedsiębiorstwa na energie elektryczną, ul. Piasecka 32 A, Krępiec w Gmina Mełgiew. Wnioskodawca posiada prawa do nieruchomości, na których będzie realizowany projekt. Elektrownia będzie się składać z paneli fotowoltaicznych zainstalowanych na stelażach wykonanych z ocynkowanej stali i aluminium o kacie nachylenia 36o, podłączonych do inwerterów o sprawności co najmniej 98%, stacji nn/SN. Natomiast instalacja dachowa będzie się składać z 2 części A (on-grid) o mocy 17,98 kW oraz części B (off-grid) o mocy 12,18 kW wraz z magazynem energii oraz systemem optymalizacji monitorującym w trybie ciągłym wydajność pracy każdego modułu, dzięki systemowi można uzyskać wydajność do 25 % więcej energii z każdego modułu.. Szczegółowo powyższe przedstawiono w projektach technicznych oraz kosztorysach. Ze względu na położenie obydwu instalacji oraz zaawansowaną technologię projektowane instalacje będzie w stanie wyprodukować rocznie łącznie około 672 MWh energii elektr., w tym przez farmę fotowoltaiczną 640 MWh na sprzedaż, a 32 MWh będzie zużyte na zapewnienie potrzeb własnych przedsiębiorstwa prowadzącego działalność w Krępcu. Wytworzona energia elektr. będzie dostarczana do sieci energetycznej SN 15 kV poprzez stację transformatorową nn/SN. Czas eksploatacji farmy to 25 lat. Projekt będzie realizowany w 2018 r. Na dzień złożenia wniosku Wnioskodawca posiada wszystkie formalno-prawne dokumenty, włącznie z pozwoleniem na budowę i zabezpieczeniem wkładu własnego, nie występuje ryzyko nie zrealizowania projektu z przyczyn niezależnych od Wnioskodawcy. Projekt będzie realizowany na zasadzie pośrednich wniosków o płatność. W wyniku realizacji projektu nastąpi zmniejszenie emisji CO2 do atmosfery o 223,29 t. (Polish)
    0 references
    The subject of the project is the construction of a photovoltaic power plant with installed capacity of 0,6 MW and a cable line of SN on plots no. 125, 111, 67 and 117 within the municipality of Cyców and the construction of a photovoltaic installation with an installed capacity of 0,031 MW covering the company’s own needs for electricity, ul. Piasecka 32 A, Spinner in the Municipality of Melgiew. The applicant has rights to the real estate on which the project will be implemented. The power plant will consist of photovoltaic panels installed on galvanised steel and aluminium frames with a gradient of 36o, connected to inverters with an efficiency of at least 98 %, nn/SN stations. On the other hand, the roof installation will consist of 2 parts A (on-grid) with a power of 17.98 kW and parts B (off-grid) with a power capacity of 12.18 kW, together with an energy storage system and a continuous monitoring system for the performance of each module, thanks to the system you can achieve an output of up to 25 % more energy from each module. This is detailed in the technical projects and in the financial statements. Due to the location of both installations and advanced technology, the planned installations will be able to produce a total of approximately 672 MWh of electricity per year, including the 640 MWh photovoltaic farm for sale, and 32 MWh will be used to provide the needs of the company operating in Krępc. The generated electricity will be supplied to the power grid SN 15 kV via the nn/SN transformer station. The operating time of the farm is 25 years. The project will be implemented in 2018. On the day of submission of the application, the applicant has all the formal and legal documents, including the building permit and own contribution security, there is no risk of failure of the project for reasons beyond the applicant’s control. The project will be implemented on the basis of indirect payment requests. As a result of the project, CO2 emissions will be reduced by 223.29 t. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.02.00-06-0016/17
    0 references