Modernisation of water intakes and distribution networks in Głusk (Q105654): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The task is to modernise the water intake of Czerniejów and the washing of sections of the water supply network in the towns of Prwiewidnica, Cologne, wedges, Majdan Mętowski, and Kazimierz gm. Głusk, with a view to removing the iron precipitate from the piping. The modernisation of the water intake of Czernon-ionic water on plot No 27/5 Czerniejów Köln would consist of: 1. Comprehensive exchange of water extraction and treatment technologies...)
(‎Created claim: summary (P836): As part of the task, measures were planned to modernise the intake of Czernia water and rinse sections of the water supply network in the villages of Prawiedniki, Prawiedniki Kolonia, Kliny, Majdan Mętowski, Kazimierzówka Głusk in order to remove iron sludge from the pipeline. Modernisation of the intake of Czerniaów water located on plot no.27/5 Czernia Cologne Gm. Jabłonna will consist of: 1. Comprehensive exchange of water extraction and trea...)
Property / summary
 
As part of the task, measures were planned to modernise the intake of Czernia water and rinse sections of the water supply network in the villages of Prawiedniki, Prawiedniki Kolonia, Kliny, Majdan Mętowski, Kazimierzówka Głusk in order to remove iron sludge from the pipeline. Modernisation of the intake of Czerniaów water located on plot no.27/5 Czernia Cologne Gm. Jabłonna will consist of: 1. Comprehensive exchange of water extraction and treatment technologies (exchange of deep-sea pumps, deferrous filters, second-degree pump kit, valve fixtures, manometers, water meters, piping. 2.Constructive works consisting of painting, laying glaze, terracotta, replacement of window and door carpentry, warming the walls of the building and the roof modernisation of the central heating system of the building through installation of electric radiators.3.External works related to the renovation of the access access to the installation of the asphalt power source, replacement of the fence and entry gate, reclamation of the area of the interior by supplementing the layer of the humus. Rinsing of the water supply network in the villages Prawiedniki, Prawiedniki Cologne, Kliny, Majdan Mętowski, Kazimierzówka to remove iron sludge from the pipeline. This will improve the quality of the water supplied and the reliability of its supply, and improve the sanitation of residents. Project indicators: direct result indicator:Project number of people using improved water supply – 2317, Number of water treatment stations supported – 1 pcs. The length of the refurbished water supply system (washing) – 40 km. The basis of the project’s location is the MPOZP for the Jabłonna Municipality (for plot no.27/5 Czerniaów – Cologne, symbol MR). The plot is located in Czerniaów Protected Landscape Area. The project is not under the supervision of the conservator. (English)
Property / summary: As part of the task, measures were planned to modernise the intake of Czernia water and rinse sections of the water supply network in the villages of Prawiedniki, Prawiedniki Kolonia, Kliny, Majdan Mętowski, Kazimierzówka Głusk in order to remove iron sludge from the pipeline. Modernisation of the intake of Czerniaów water located on plot no.27/5 Czernia Cologne Gm. Jabłonna will consist of: 1. Comprehensive exchange of water extraction and treatment technologies (exchange of deep-sea pumps, deferrous filters, second-degree pump kit, valve fixtures, manometers, water meters, piping. 2.Constructive works consisting of painting, laying glaze, terracotta, replacement of window and door carpentry, warming the walls of the building and the roof modernisation of the central heating system of the building through installation of electric radiators.3.External works related to the renovation of the access access to the installation of the asphalt power source, replacement of the fence and entry gate, reclamation of the area of the interior by supplementing the layer of the humus. Rinsing of the water supply network in the villages Prawiedniki, Prawiedniki Cologne, Kliny, Majdan Mętowski, Kazimierzówka to remove iron sludge from the pipeline. This will improve the quality of the water supplied and the reliability of its supply, and improve the sanitation of residents. Project indicators: direct result indicator:Project number of people using improved water supply – 2317, Number of water treatment stations supported – 1 pcs. The length of the refurbished water supply system (washing) – 40 km. The basis of the project’s location is the MPOZP for the Jabłonna Municipality (for plot no.27/5 Czerniaów – Cologne, symbol MR). The plot is located in Czerniaów Protected Landscape Area. The project is not under the supervision of the conservator. (English) / rank
 
Normal rank
Property / summary: As part of the task, measures were planned to modernise the intake of Czernia water and rinse sections of the water supply network in the villages of Prawiedniki, Prawiedniki Kolonia, Kliny, Majdan Mętowski, Kazimierzówka Głusk in order to remove iron sludge from the pipeline. Modernisation of the intake of Czerniaów water located on plot no.27/5 Czernia Cologne Gm. Jabłonna will consist of: 1. Comprehensive exchange of water extraction and treatment technologies (exchange of deep-sea pumps, deferrous filters, second-degree pump kit, valve fixtures, manometers, water meters, piping. 2.Constructive works consisting of painting, laying glaze, terracotta, replacement of window and door carpentry, warming the walls of the building and the roof modernisation of the central heating system of the building through installation of electric radiators.3.External works related to the renovation of the access access to the installation of the asphalt power source, replacement of the fence and entry gate, reclamation of the area of the interior by supplementing the layer of the humus. Rinsing of the water supply network in the villages Prawiedniki, Prawiedniki Cologne, Kliny, Majdan Mętowski, Kazimierzówka to remove iron sludge from the pipeline. This will improve the quality of the water supplied and the reliability of its supply, and improve the sanitation of residents. Project indicators: direct result indicator:Project number of people using improved water supply – 2317, Number of water treatment stations supported – 1 pcs. The length of the refurbished water supply system (washing) – 40 km. The basis of the project’s location is the MPOZP for the Jabłonna Municipality (for plot no.27/5 Czerniaów – Cologne, symbol MR). The plot is located in Czerniaów Protected Landscape Area. The project is not under the supervision of the conservator. (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:50, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of water intakes and distribution networks in Głusk
Project in Poland financed by DG Regio

    Statements

    0 references
    1,941,846.54 zloty
    0 references
    466,043.17 Euro
    13 January 2020
    0 references
    2,284,525.35 zloty
    0 references
    548,286.08 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 June 2018
    0 references
    31 December 2021
    0 references
    GMINA GŁUSK
    0 references
    0 references
    W ramach zadania zaplanowano działania polegające na modernizacji ujęcia wody Czerniejów oraz płukaniu odcinków sieci wodociągowej w miejscowościach Prawiedniki, Prawiedniki Kolonia, Kliny, Majdan Mętowski, Kazimierzówka gm. Głusk w celu usunięcia z rurociągu osadu żelaza. Modernizacja ujęcia wody Czerniejów zlokalizowanego na działce nr 27/5 Czerniejów Kolonia gm. Jabłonna będzie polegała na: 1. Kompleksowej wymianie technologii wydobycia i uzdatniania wody (wymiana pomp głębinowych, filtrów odżelaziaczy, zestawu pompowego II stopnia, armatury zasuwy, manometry, wodomierze, orurowanie. 2.Robotach ogólnobudowlanych polegających na malowaniu, układaniu glazury, terakoty, wymianie stolarki okiennej i drzwiowej, docieplenie ścian budynku oraz dachu modernizacja systemu centralnego ogrzewania budynku poprzez montaż grzejników elektrycznych olejowych.3.Robotach zewnętrznych związanych z remontem dojazdu do ujęcia poprzez wykonanie nawierzchni asfaltowej, wymianie ogrodzenia i bramy wjazdowej, rekultywacji terenu ujęcia poprzez uzupełnienie warstwy humusu i wysianie trawy, montaż oświetlenia zewnętrznego zasilanego z odnawialnego źródła energii (panel fotowoltaiczny).4. Płukanie sieci wodociągowej w miejscowościach Prawiedniki, Prawiedniki Kolonia, Kliny, Majdan Mętowski, Kazimierzówka w celu usunięcia z rurociągu osadu żelaza. Dzięki temu poprawi się jakość dostarczanej wody i niezawodność w jej dostawie, oraz poprawi się stan sanitarny mieszkańców. Wskaźniki projektu: wskaźnik rezultatu bezpośredniego:Przewidywana liczba osób korzystających z ulepszonego zaopatrzenia w wodę - 2317, Liczba wspartych stacji uzdatniania wody - 1 szt. Długość wyremontowanej sieci wodociągowej (płukanie) - 40 km. Podstawę lokalizacji projektu stanowi MPOZP dla Gminy Jabłonna (dot. działki nr 27/5 Czerniejów -Kolonia, symbol MR). Ww. działka leży w Czerniejowskim Obszarze Chronionego Krajobrazu. Projekt nie jest objęty nadzorem konserwatora. (Polish)
    0 references
    As part of the task, measures were planned to modernise the intake of Czernia water and rinse sections of the water supply network in the villages of Prawiedniki, Prawiedniki Kolonia, Kliny, Majdan Mętowski, Kazimierzówka Głusk in order to remove iron sludge from the pipeline. Modernisation of the intake of Czerniaów water located on plot no.27/5 Czernia Cologne Gm. Jabłonna will consist of: 1. Comprehensive exchange of water extraction and treatment technologies (exchange of deep-sea pumps, deferrous filters, second-degree pump kit, valve fixtures, manometers, water meters, piping. 2.Constructive works consisting of painting, laying glaze, terracotta, replacement of window and door carpentry, warming the walls of the building and the roof modernisation of the central heating system of the building through installation of electric radiators.3.External works related to the renovation of the access access to the installation of the asphalt power source, replacement of the fence and entry gate, reclamation of the area of the interior by supplementing the layer of the humus. Rinsing of the water supply network in the villages Prawiedniki, Prawiedniki Cologne, Kliny, Majdan Mętowski, Kazimierzówka to remove iron sludge from the pipeline. This will improve the quality of the water supplied and the reliability of its supply, and improve the sanitation of residents. Project indicators: direct result indicator:Project number of people using improved water supply – 2317, Number of water treatment stations supported – 1 pcs. The length of the refurbished water supply system (washing) – 40 km. The basis of the project’s location is the MPOZP for the Jabłonna Municipality (for plot no.27/5 Czerniaów – Cologne, symbol MR). The plot is located in Czerniaów Protected Landscape Area. The project is not under the supervision of the conservator. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.06.04.00-06-0045/18
    0 references