Modernisation of water management in the municipality of Rybchev by means of the construction of a water reservoir from the filter filters, the installation of the RES system and the monitoring installations for the operation of water supply systems. (Q105576): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project involves the installation of an infiltrating reservoir into the water from the rinsing of the degression in the water and enabling it to be managed in the area of the water extraction plot. As the tank volume, half an annual volume of 110.5 m³ of sewage is used. The surface of the water body of the absorption tank shall be 111 m². The tank has been designed on the existing water of Pilaszkowice — Bazar on plot 254/2. In addition, i...)
(‎Created claim: summary (P836): The project involves the construction of an infiltrating and evaporating tank on the flushing of deferailisers and enabling them to be managed in the area of the water intake plot. As the volume of the tank was taken a half-year capacity of the amount of sewage with washes of 110.5 m³. The surface of the water mirror of the absorbing and dispensing tank is 111 m². The tank was designed on the existing water catchment of Pilaszkowice – Bazar on p...)
Property / summary
 
The project involves the construction of an infiltrating and evaporating tank on the flushing of deferailisers and enabling them to be managed in the area of the water intake plot. As the volume of the tank was taken a half-year capacity of the amount of sewage with washes of 110.5 m³. The surface of the water mirror of the absorbing and dispensing tank is 111 m². The tank was designed on the existing water catchment of Pilaszkowice – Bazar on plot 254/2. In addition, the following will be performed: a monitoring system for water supply stations located in the towns of: Lot No 254/2; Rybczewice plot No 1548/2; Zygmuntów plot No. 452, Częstoborowice plot No. 1884/3. Includes a system that controls and visualises working processes, ensures automatic control of water station equipment to achieve the effect of reducing water losses through a system that controls and visualises processes and basic parameters of take operation, b) installation of a photovoltaic installation on roofs of water supply station buildings in towns: Lot No 254/2; Rybczewice plot No 1548/2; Zygmuntów plot No. 452, Częstoborowice plot No. 1884/3. Photovoltaic installation in an island system not connected to the network. Power and operating voltage – U=230V. Installed power – 0,5 kWpi. Two monocrystalline panels with a capacity of 250 Wp/pc. at each station., c)exchange internal lighting with energy-saving LED luminaires in water station buildings in the villages: Bazar, Rybczewice, Zygmunt, Częstoborowice, d)Exchange meters for measuring water to radio (including users who are provided with solutions for wastewater management). Another element is the launch of services through which users will be able to make online transactions. This service will also have a special tab allowing stakeholders to contact and evaluate the level of user satisfaction with the services received. No new users are expected to connect. (English)
Property / summary: The project involves the construction of an infiltrating and evaporating tank on the flushing of deferailisers and enabling them to be managed in the area of the water intake plot. As the volume of the tank was taken a half-year capacity of the amount of sewage with washes of 110.5 m³. The surface of the water mirror of the absorbing and dispensing tank is 111 m². The tank was designed on the existing water catchment of Pilaszkowice – Bazar on plot 254/2. In addition, the following will be performed: a monitoring system for water supply stations located in the towns of: Lot No 254/2; Rybczewice plot No 1548/2; Zygmuntów plot No. 452, Częstoborowice plot No. 1884/3. Includes a system that controls and visualises working processes, ensures automatic control of water station equipment to achieve the effect of reducing water losses through a system that controls and visualises processes and basic parameters of take operation, b) installation of a photovoltaic installation on roofs of water supply station buildings in towns: Lot No 254/2; Rybczewice plot No 1548/2; Zygmuntów plot No. 452, Częstoborowice plot No. 1884/3. Photovoltaic installation in an island system not connected to the network. Power and operating voltage – U=230V. Installed power – 0,5 kWpi. Two monocrystalline panels with a capacity of 250 Wp/pc. at each station., c)exchange internal lighting with energy-saving LED luminaires in water station buildings in the villages: Bazar, Rybczewice, Zygmunt, Częstoborowice, d)Exchange meters for measuring water to radio (including users who are provided with solutions for wastewater management). Another element is the launch of services through which users will be able to make online transactions. This service will also have a special tab allowing stakeholders to contact and evaluate the level of user satisfaction with the services received. No new users are expected to connect. (English) / rank
 
Normal rank
Property / summary: The project involves the construction of an infiltrating and evaporating tank on the flushing of deferailisers and enabling them to be managed in the area of the water intake plot. As the volume of the tank was taken a half-year capacity of the amount of sewage with washes of 110.5 m³. The surface of the water mirror of the absorbing and dispensing tank is 111 m². The tank was designed on the existing water catchment of Pilaszkowice – Bazar on plot 254/2. In addition, the following will be performed: a monitoring system for water supply stations located in the towns of: Lot No 254/2; Rybczewice plot No 1548/2; Zygmuntów plot No. 452, Częstoborowice plot No. 1884/3. Includes a system that controls and visualises working processes, ensures automatic control of water station equipment to achieve the effect of reducing water losses through a system that controls and visualises processes and basic parameters of take operation, b) installation of a photovoltaic installation on roofs of water supply station buildings in towns: Lot No 254/2; Rybczewice plot No 1548/2; Zygmuntów plot No. 452, Częstoborowice plot No. 1884/3. Photovoltaic installation in an island system not connected to the network. Power and operating voltage – U=230V. Installed power – 0,5 kWpi. Two monocrystalline panels with a capacity of 250 Wp/pc. at each station., c)exchange internal lighting with energy-saving LED luminaires in water station buildings in the villages: Bazar, Rybczewice, Zygmunt, Częstoborowice, d)Exchange meters for measuring water to radio (including users who are provided with solutions for wastewater management). Another element is the launch of services through which users will be able to make online transactions. This service will also have a special tab allowing stakeholders to contact and evaluate the level of user satisfaction with the services received. No new users are expected to connect. (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:42, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of water management in the municipality of Rybchev by means of the construction of a water reservoir from the filter filters, the installation of the RES system and the monitoring installations for the operation of water supply systems.
Project in Poland financed by DG Regio

    Statements

    0 references
    806,644.44 zloty
    0 references
    193,594.67 Euro
    13 January 2020
    0 references
    948,993.47 zloty
    0 references
    227,758.43 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    23 March 2018
    0 references
    20 September 2020
    0 references
    GMINA RYBCZEWICE
    0 references
    Q2521900 (Deleted Item)
    0 references
    Projekt zakłada wykonanie zbiornika infiltrująco-odparowującego na wody popłuczne z płukania odżelaziaczy i umożliwienie zagospodarowania ich w obszarze działki ujęcia wody. Jako objętość zbiornika przyjęto pół roczną pojemność ilości ścieków z popłuczyn 110,5 m3. Powierzchnia lustra wody zbiornika wchłaniająco-rozsączającego wynosi 111 m2. Zbiornik zaprojektowano na istniejącym ujęciu wody Pilaszkowice - Bazar na działce 254/2. Dodatkowo zostanie wykonany: a) system monitoringu stacji wodociągowych, zlokalizowanych w miejscowościach: Bazar działka nr 254/2; Rybczewice działka nr 1548/2; Zygmuntów działka nr 452, Częstoborowice działka nr 1884/3. Obejmuje system kontrolujący i wizualizujący procesy pracy, zapewnia automatyczne sterowanie pracą urządzeń stacji wodociągowej zapewniającą uzyskanie efektu zmniejszenia strat wody poprzez system kontrolujący i wizualizujący procesy i podstawowe parametry pracy ujęcia, b) montaż instalacji fotowoltaicznej na dachach budynków stacji wodociągowych w miejscowościach: Bazar działka nr 254/2; Rybczewice działka nr 1548/2; Zygmuntów działka nr 452, Częstoborowice działka nr 1884/3. Instalacja fotowoltaiczna w systemie wyspowym nie podłączonym do sieci. Napięcie zasilania i robocze - U=230V. Moc zainstalowana - 0,5 kWpi. Dwa panele monokrystaliczne o mocy 250 Wp/szt. na każdej stacji., c)wymiana oświetlenia wewnętrznego na energooszczędne oprawy LED w budynkach stacji wodociągowej w miejscowościach: Bazar , Rybczewice, Zygmuntów,, Częstoborowice, d)wymiana liczników do pomiaru wody na radiowe (obejmująca użytkowników, którzy mają zapewnione odp. rozwiązania gospodarki ściekowej. Kolejnym elementem jest uruchomienie serwisów, za pośrednictwem których użytkownicy będą mogli dokonywać transakcji on-line . Serwis ten będzie miał również specjalną zakładkę pozwalającą interesariuszom na kontakt i ocenę poziomu satysfakcji użytkowników z otrzymanych usług. Nie przewiduje sie podłączania nowych użytkowników. (Polish)
    0 references
    The project involves the construction of an infiltrating and evaporating tank on the flushing of deferailisers and enabling them to be managed in the area of the water intake plot. As the volume of the tank was taken a half-year capacity of the amount of sewage with washes of 110.5 m³. The surface of the water mirror of the absorbing and dispensing tank is 111 m². The tank was designed on the existing water catchment of Pilaszkowice – Bazar on plot 254/2. In addition, the following will be performed: a monitoring system for water supply stations located in the towns of: Lot No 254/2; Rybczewice plot No 1548/2; Zygmuntów plot No. 452, Częstoborowice plot No. 1884/3. Includes a system that controls and visualises working processes, ensures automatic control of water station equipment to achieve the effect of reducing water losses through a system that controls and visualises processes and basic parameters of take operation, b) installation of a photovoltaic installation on roofs of water supply station buildings in towns: Lot No 254/2; Rybczewice plot No 1548/2; Zygmuntów plot No. 452, Częstoborowice plot No. 1884/3. Photovoltaic installation in an island system not connected to the network. Power and operating voltage – U=230V. Installed power – 0,5 kWpi. Two monocrystalline panels with a capacity of 250 Wp/pc. at each station., c)exchange internal lighting with energy-saving LED luminaires in water station buildings in the villages: Bazar, Rybczewice, Zygmunt, Częstoborowice, d)Exchange meters for measuring water to radio (including users who are provided with solutions for wastewater management). Another element is the launch of services through which users will be able to make online transactions. This service will also have a special tab allowing stakeholders to contact and evaluate the level of user satisfaction with the services received. No new users are expected to connect. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.06.04.00-06-0003/17
    0 references