Construction of water and sanitation infrastructure in Dorohusk — Phase II (Q105573): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project is the construction of a water mains network in the municipality of Dorohusk. The infrastructure network will run through 7 project localities: Dobrylka, Ludwins, trenches, Kolonia, rozosz, Wólka Okopska and Zatown. The project will be targeted at the inhabitants (target group) who do not have access to the water supply network, which supplies themselves to the water themselves (domestic fossil or deep-water wells). The majority of...) |
(Created claim: summary (P836): The subject of the project is the construction of a water supply network in the municipality of Dorohusk. The infrastructure network route will run through 7 towns covered by the project: Dobryłówka, Ludwinów, Okopy, Cologne, Rozkosz, Wólka Okopska and Zamieście. The project will be covered by residents (target group of the project) who do not have access to the water supply, supplying themselves with water (domestic wells dug or deep-sea). The...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the construction of a water supply network in the municipality of Dorohusk. The infrastructure network route will run through 7 towns covered by the project: Dobryłówka, Ludwinów, Okopy, Cologne, Rozkosz, Wólka Okopska and Zamieście. The project will be covered by residents (target group of the project) who do not have access to the water supply, supplying themselves with water (domestic wells dug or deep-sea). The majority of residents use transmission belts – which does not meet sanitary conditions and is burdensome in winter conditions. The low level of equipment of the municipality with water infrastructure leads to a deterioration of the living conditions of the inhabitants, a reduction in the investment attractiveness of the municipality and a deterioration of the natural environment. The project’s project results are primarily: 13598.5 m of newly built water supply network, access of 64 inhabitants of the municipality to running water, increasing the attractiveness of the municipality for future investors and tourists, improving the environment. The planned tasks in the project consist of carrying out construction works on the expansion of the new water supply network, launching services through which users will be able to conduct online transactions (including contracting, reading meters, charging, billing, comments and complaints, queries, availability of existing and new services, etc. within the existing ICT system operating in the municipality). All work will be carried out in a way that ensures environmental sustainability. The applicant informs that in the area covered by the project there is a proper management of the resulting impurities – home sewage treatment plants. (English) | |||||||||||||||
Property / summary: The subject of the project is the construction of a water supply network in the municipality of Dorohusk. The infrastructure network route will run through 7 towns covered by the project: Dobryłówka, Ludwinów, Okopy, Cologne, Rozkosz, Wólka Okopska and Zamieście. The project will be covered by residents (target group of the project) who do not have access to the water supply, supplying themselves with water (domestic wells dug or deep-sea). The majority of residents use transmission belts – which does not meet sanitary conditions and is burdensome in winter conditions. The low level of equipment of the municipality with water infrastructure leads to a deterioration of the living conditions of the inhabitants, a reduction in the investment attractiveness of the municipality and a deterioration of the natural environment. The project’s project results are primarily: 13598.5 m of newly built water supply network, access of 64 inhabitants of the municipality to running water, increasing the attractiveness of the municipality for future investors and tourists, improving the environment. The planned tasks in the project consist of carrying out construction works on the expansion of the new water supply network, launching services through which users will be able to conduct online transactions (including contracting, reading meters, charging, billing, comments and complaints, queries, availability of existing and new services, etc. within the existing ICT system operating in the municipality). All work will be carried out in a way that ensures environmental sustainability. The applicant informs that in the area covered by the project there is a proper management of the resulting impurities – home sewage treatment plants. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the construction of a water supply network in the municipality of Dorohusk. The infrastructure network route will run through 7 towns covered by the project: Dobryłówka, Ludwinów, Okopy, Cologne, Rozkosz, Wólka Okopska and Zamieście. The project will be covered by residents (target group of the project) who do not have access to the water supply, supplying themselves with water (domestic wells dug or deep-sea). The majority of residents use transmission belts – which does not meet sanitary conditions and is burdensome in winter conditions. The low level of equipment of the municipality with water infrastructure leads to a deterioration of the living conditions of the inhabitants, a reduction in the investment attractiveness of the municipality and a deterioration of the natural environment. The project’s project results are primarily: 13598.5 m of newly built water supply network, access of 64 inhabitants of the municipality to running water, increasing the attractiveness of the municipality for future investors and tourists, improving the environment. The planned tasks in the project consist of carrying out construction works on the expansion of the new water supply network, launching services through which users will be able to conduct online transactions (including contracting, reading meters, charging, billing, comments and complaints, queries, availability of existing and new services, etc. within the existing ICT system operating in the municipality). All work will be carried out in a way that ensures environmental sustainability. The applicant informs that in the area covered by the project there is a proper management of the resulting impurities – home sewage treatment plants. (English) / qualifier | |||||||||||||||
point in time: 17 October 2020
|
Revision as of 16:42, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of water and sanitation infrastructure in Dorohusk — Phase II |
Project in Poland financed by DG Regio |
Statements
3,073,029.2 zloty
0 references
3,615,328.5 zloty
0 references
85.0 percent
0 references
1 April 2019
0 references
30 November 2019
0 references
GMINA DOROHUSK
0 references
Przedmiotem projektu jest budowa sieci wodociągowej na terenie gminy Dorohusk. Trasa sieci infrastruktury przebiegać będzie przez 7 miejscowości objętych projektem: Dobryłówka, Ludwinów, Okopy, Okopy Kolonia, Rozkosz, Wólka Okopska i Zamieście. Projektem zostaną objęci mieszkańcy (grupa docelowa projektu), którzy nie mają dostępu do sieci wodociągowej, zaopatrujący się w wodę we własnym zakresie (przydomowe studnie kopane lub głębinowe). Większość mieszkańców korzysta z pozyskania wody pasami transmisyjnymi- co nie spełnia warunków sanitarnych i jest uciążliwe w warunkach zimowych. Niski stan wyposażenia gminy w infrastrukturę wodociągową prowadzi do pogorszenia warunków życia mieszkańców, obniżenia atrakcyjności inwestycyjnej gminy oraz pogorszenia stanu środowiska naturalnego. Zakładane rezultaty projektu to przede wszystkim: 13 598,5m nowo wybudowanej sieci wodociągowej, dostęp 64 mieszkańców gminy do bieżącej wody, podniesienie atrakcyjności gminy dla przyszłych inwestorów jak i turystów, poprawa środowiska naturalnego. Zaplanowane zadania w projekcie polegają na przeprowadzeniu prac budowlanych dotyczących rozbudowy nowej sieci wodociągowej, uruchomienie serwisów, za pośrednictwem których użytkownicy będą mogli dokonywać transakcji on-line (w tym zawieranie umów, odczyty liczników, pobieranie opłat, stan rozliczeń, uwagi i skargi, zapytania, dostępność dotychczasowych i nowych usług itp. w ramach istniejącego systemu ICT funkcjonującego w gminie). Wszystkie prace zostaną przeprowadzone w sposób zapewniający zachowanie równowagi środowiska naturalnego. Wnioskodawca informuje, iż na terenie objętym projektem funkcjonuje prawidłowe zagospodarowanie powstałych nieczystości - przydomowe oczyszczalnie ścieków. (Polish)
0 references
The subject of the project is the construction of a water supply network in the municipality of Dorohusk. The infrastructure network route will run through 7 towns covered by the project: Dobryłówka, Ludwinów, Okopy, Cologne, Rozkosz, Wólka Okopska and Zamieście. The project will be covered by residents (target group of the project) who do not have access to the water supply, supplying themselves with water (domestic wells dug or deep-sea). The majority of residents use transmission belts – which does not meet sanitary conditions and is burdensome in winter conditions. The low level of equipment of the municipality with water infrastructure leads to a deterioration of the living conditions of the inhabitants, a reduction in the investment attractiveness of the municipality and a deterioration of the natural environment. The project’s project results are primarily: 13598.5 m of newly built water supply network, access of 64 inhabitants of the municipality to running water, increasing the attractiveness of the municipality for future investors and tourists, improving the environment. The planned tasks in the project consist of carrying out construction works on the expansion of the new water supply network, launching services through which users will be able to conduct online transactions (including contracting, reading meters, charging, billing, comments and complaints, queries, availability of existing and new services, etc. within the existing ICT system operating in the municipality). All work will be carried out in a way that ensures environmental sustainability. The applicant informs that in the area covered by the project there is a proper management of the resulting impurities – home sewage treatment plants. (English)
17 October 2020
0 references
Identifiers
RPLU.06.04.00-06-0001/17
0 references