(Removed claim: summary (P836): The project (P) assumes that 174 units should be installed. (42 units of 2100W each, 75 kg. 3150W, 57W and 4200W) posited only on rooftops or elevers and 49 biomass boilers (17 with a power of 20 kW each on pellets, 4 after 24 kW to take wood, 22 after 22 kW for wood, 6 at 20 kW/oats) for wood in the wayside. CCU with a total capacity of 1.60 MW. It also provides for a website (ICT, ICT) service, a work service. Sw, Service to doum.tech., Serv...) |
(Created claim: summary (P836): The project (P.) assumes installation of 174 solar panels. (42 pieces with 2100 watts each, 75pcs. — 3150 W and 57 pieces-4200 W) planted exclusively on roofs or facades and 49 biomass boilers (17 of 20 kW each for pellets, 4 to 24 kW per pellet, 22 to 22 kW per wood, 6 to 20 kW per oats) in the object. CWU with a total power of 1,60 MW. P. also provides a web service (ICT, ICT)., Development Service. SW, Dokum. tech., Service Manager P., Person...) |
||||||||||||||
Property / summary | |||||||||||||||
The project (P.) assumes installation of 174 solar panels. (42 pieces with 2100 watts each, 75pcs. — 3150 W and 57 pieces-4200 W) planted exclusively on roofs or facades and 49 biomass boilers (17 of 20 kW each for pellets, 4 to 24 kW per pellet, 22 to 22 kW per wood, 6 to 20 kW per oats) in the object. CWU with a total power of 1,60 MW. P. also provides a web service (ICT, ICT)., Development Service. SW, Dokum. tech., Service Manager P., Personal Costs, Supervision Inspector’s Service, Promotional Measures under P.. The total number of GB residents benefiting from the results of P. will be approx. 900 in 223 objects. The main target P. is to increase the use of RES in the GB area. The objectives of the detail: OBJECTIVE 1: Upowszechn. techno. the production of clean energy among inhabitants through the general assembly of RES on the premises of the building; OBJECTIVE 2: Reducing air pollution atmosf. by reducing emissions of harmful compounds by increasing the share of energy from renewable sources; OBJECTIVE 3: Reduce the financial burden. local community resulting from the fees for energ. thanks to the creation. individual. instal. will use. RES; P. learn to pursue both the priority objective. 4 as well as the target. RPO WL. P. entry. to the objectives of OPERAC. (2.5; 3.6; 4.5) indication. in SRWL 2014-2020. The result is: Additional capacity to generate energy from renewable sources by installing installations for heating. CWU with a total capacity of 1,60 MW (0,564 MW-collectors 1.04 MW-piece), Estimated annual decrease in greenhouse gas emissions in the amount of 480,63tCO2/year, The production of heat from newly built/new generation capacity of RES installations in the amount of 1 066.31MWht/year. On the basis of the protection programme for Lublin STREFA, GB did not exceed at least 1 limit or target level for substances subject to air quality assessment. Actions foreseen in P. contribute to the implementation of corrective actions aimed at improving air quality (English) | |||||||||||||||
Property / summary: The project (P.) assumes installation of 174 solar panels. (42 pieces with 2100 watts each, 75pcs. — 3150 W and 57 pieces-4200 W) planted exclusively on roofs or facades and 49 biomass boilers (17 of 20 kW each for pellets, 4 to 24 kW per pellet, 22 to 22 kW per wood, 6 to 20 kW per oats) in the object. CWU with a total power of 1,60 MW. P. also provides a web service (ICT, ICT)., Development Service. SW, Dokum. tech., Service Manager P., Personal Costs, Supervision Inspector’s Service, Promotional Measures under P.. The total number of GB residents benefiting from the results of P. will be approx. 900 in 223 objects. The main target P. is to increase the use of RES in the GB area. The objectives of the detail: OBJECTIVE 1: Upowszechn. techno. the production of clean energy among inhabitants through the general assembly of RES on the premises of the building; OBJECTIVE 2: Reducing air pollution atmosf. by reducing emissions of harmful compounds by increasing the share of energy from renewable sources; OBJECTIVE 3: Reduce the financial burden. local community resulting from the fees for energ. thanks to the creation. individual. instal. will use. RES; P. learn to pursue both the priority objective. 4 as well as the target. RPO WL. P. entry. to the objectives of OPERAC. (2.5; 3.6; 4.5) indication. in SRWL 2014-2020. The result is: Additional capacity to generate energy from renewable sources by installing installations for heating. CWU with a total capacity of 1,60 MW (0,564 MW-collectors 1.04 MW-piece), Estimated annual decrease in greenhouse gas emissions in the amount of 480,63tCO2/year, The production of heat from newly built/new generation capacity of RES installations in the amount of 1 066.31MWht/year. On the basis of the protection programme for Lublin STREFA, GB did not exceed at least 1 limit or target level for substances subject to air quality assessment. Actions foreseen in P. contribute to the implementation of corrective actions aimed at improving air quality (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project (P.) assumes installation of 174 solar panels. (42 pieces with 2100 watts each, 75pcs. — 3150 W and 57 pieces-4200 W) planted exclusively on roofs or facades and 49 biomass boilers (17 of 20 kW each for pellets, 4 to 24 kW per pellet, 22 to 22 kW per wood, 6 to 20 kW per oats) in the object. CWU with a total power of 1,60 MW. P. also provides a web service (ICT, ICT)., Development Service. SW, Dokum. tech., Service Manager P., Personal Costs, Supervision Inspector’s Service, Promotional Measures under P.. The total number of GB residents benefiting from the results of P. will be approx. 900 in 223 objects. The main target P. is to increase the use of RES in the GB area. The objectives of the detail: OBJECTIVE 1: Upowszechn. techno. the production of clean energy among inhabitants through the general assembly of RES on the premises of the building; OBJECTIVE 2: Reducing air pollution atmosf. by reducing emissions of harmful compounds by increasing the share of energy from renewable sources; OBJECTIVE 3: Reduce the financial burden. local community resulting from the fees for energ. thanks to the creation. individual. instal. will use. RES; P. learn to pursue both the priority objective. 4 as well as the target. RPO WL. P. entry. to the objectives of OPERAC. (2.5; 3.6; 4.5) indication. in SRWL 2014-2020. The result is: Additional capacity to generate energy from renewable sources by installing installations for heating. CWU with a total capacity of 1,60 MW (0,564 MW-collectors 1.04 MW-piece), Estimated annual decrease in greenhouse gas emissions in the amount of 480,63tCO2/year, The production of heat from newly built/new generation capacity of RES installations in the amount of 1 066.31MWht/year. On the basis of the protection programme for Lublin STREFA, GB did not exceed at least 1 limit or target level for substances subject to air quality assessment. Actions foreseen in P. contribute to the implementation of corrective actions aimed at improving air quality (English) / qualifier | |||||||||||||||
point in time: 17 October 2020
|
Revision as of 16:40, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Increase in the use of renewable energy sources in the region of Lubelskie — delivery and installation of solar collectors and biomass furnaces situated in the territory of the municipality of Batorz — Stage II |
Project in Poland financed by DG Regio |
Statements
2,263,635.41 zloty
0 references
2,663,100.5 zloty
0 references
85.0 percent
0 references
15 April 2016
0 references
28 December 2018
0 references
GMINA BATORZ
0 references
Projekt (P.) zakłada instalację 174 szt. zestaw. kol. słonecznych. (42szt. o mocy 2100W każdy, 75szt. - 3150W i 57szt.-4200W ) posadowionych wyłącznie na dachach lub elewacjach i 49 kotłów na biomasę (17 o mocy 20kW każdy na pellet, 4 po 24kW na pellet, 22 po 22kW na drewno, 6 po 20 kW na owies) w obiekt. prywat. do podgrz. CWU o sum. mocy 1,60MW. P. przewiduje też serwis www (TIK, ICT)., Usługę oprac. SW, Usługę wyk. dokum. tech., Usługę menedżera P., Koszty osobowe, Usługę inspektora nadzoru, Działania promocyjne w ramach P.. Łączna liczba mieszkańców GB korzystających (GRUPA DOCELOWA) z efektów realizacji P. wyniesie ok. 900 w 223 obiektach. GŁÓWNYM CELEM P. jest zwiększenie stosowania OZE na terenie GB. Cele szczegół.: CEL 1: Upowszechn. techno. wytwarzania czystej energii wśród mieszk. poprzez powszechny montaż OZE na terenie gm.; CEL 2: Redukcja zanieczyszcz. powietrza atmosf. poprzez zmniejszenie emisji związków szkodliwych dzięki zwiększ. udziału energii ze źródeł odnawialnych; CEL 3: Zmniejsz. obciążeń finans. społeczn. lokalnej wynikaj. z opłat za energ. dzięki utworz. indywid. instal. wykorzysta. OZE; P. przycz. się do realiz. zarówno celu prioryt. 4 jak i celu główn. RPO WL. P. wpis. się w cele operac. (2.5; 3.6; 4.5) wskaz. w SRWL 2014-2020. REZULTATEM jest: Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych uzyskana poprzez montaż instalacji do podgrz. CWU o sum. mocy 1,60MW (0,564MW-kolektory 1,04MW-piece), Szacowany roczny spadek emisji gazów cieplar. w ilości 480,63tCO2/rok, Produkcja energii cieplnej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE w ilości 1 066,31MWht/rok. Na podstawie PROGRAMU OCHRONY POWIETRZA DLA STREFY LUBELSKIEJ w GB nie stwierdzono przekroczenie choćby 1go poziomu dopuszczalnego lub docelowego w odniesieniu do substancji podlegających ocenie jakości powietrza. Działania przewidziane w P. przyczyniają się do realizacji działań naprawczych mających na celu poprawę stanu jakości powietrza (Polish)
0 references
The project (P.) assumes installation of 174 solar panels. (42 pieces with 2100 watts each, 75pcs. — 3150 W and 57 pieces-4200 W) planted exclusively on roofs or facades and 49 biomass boilers (17 of 20 kW each for pellets, 4 to 24 kW per pellet, 22 to 22 kW per wood, 6 to 20 kW per oats) in the object. CWU with a total power of 1,60 MW. P. also provides a web service (ICT, ICT)., Development Service. SW, Dokum. tech., Service Manager P., Personal Costs, Supervision Inspector’s Service, Promotional Measures under P.. The total number of GB residents benefiting from the results of P. will be approx. 900 in 223 objects. The main target P. is to increase the use of RES in the GB area. The objectives of the detail: OBJECTIVE 1: Upowszechn. techno. the production of clean energy among inhabitants through the general assembly of RES on the premises of the building; OBJECTIVE 2: Reducing air pollution atmosf. by reducing emissions of harmful compounds by increasing the share of energy from renewable sources; OBJECTIVE 3: Reduce the financial burden. local community resulting from the fees for energ. thanks to the creation. individual. instal. will use. RES; P. learn to pursue both the priority objective. 4 as well as the target. RPO WL. P. entry. to the objectives of OPERAC. (2.5; 3.6; 4.5) indication. in SRWL 2014-2020. The result is: Additional capacity to generate energy from renewable sources by installing installations for heating. CWU with a total capacity of 1,60 MW (0,564 MW-collectors 1.04 MW-piece), Estimated annual decrease in greenhouse gas emissions in the amount of 480,63tCO2/year, The production of heat from newly built/new generation capacity of RES installations in the amount of 1 066.31MWht/year. On the basis of the protection programme for Lublin STREFA, GB did not exceed at least 1 limit or target level for substances subject to air quality assessment. Actions foreseen in P. contribute to the implementation of corrective actions aimed at improving air quality (English)
17 October 2020
0 references
Identifiers
RPLU.04.01.00-06-0057/16
0 references