P.U.H. “L.K.R. NOWAKWSCCY”, A COMPANY REGISTERED BY THE INSTALLATION OF SOLAR PANELS WITH A CAPACITY OF 30,9 KWP FOR INVESTMENT IN A WHITE RAWSKA INVESTMENT AT UL. POLISH ARMY 49. (Q101740): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): THE SUBJECT OF THE INVESTMENT IS THE CONSTRUCTION OF AN INFRASTRUCTURE FOR THE PRODUCTION OF ELECTRICITY FROM RENEWABLE ENERGY SOURCES, A PV POWER PLANT WITH A TOTAL CAPACITY OF 30,9 KWP. THE INVESTMENT WILL BE BASED ON 2 ROOFS OF THE BUILDINGS OWNED BY P.U.H. “L.K.R. NOWAKOWSCY”, AJWB IN WHITE RAWSKA: 21 KWP AT PETROL STATION AND 9,90 KWP ON CAR WASHING. THE MONEY SPENT ON THE CONSTRUCTION AND ASSEMBLY WORKS OF THE PLANT ARE IN THE FORM OF A...) |
(Created claim: summary (P836): THE PURPOSE OF THE INVESTMENT IS THE CONSTRUCTION OF INFRASTRUCTURE FOR THE PRODUCTION OF ELECTRICITY FROM RENEWABLE SOURCES – PHOTOVOLTAIC POWER PLANT WITH A TOTAL CAPACITY OF 30,9 KWP. THE INVESTMENT WILL BE LOCATED ON 2 ROOFS OF BUILDINGS BELONGING TO P.U.H. “L.K.R. NOWAKOWSCY” COMPANY AJWNA IN WHITE RAWSKA: 21 KWP AT A GAS STATION AND 9,90 KWP AT A CAR WASH. THE MONEY SPENT ON CONSTRUCTION AND ASSEMBLY WORKS OF INSTALLATIONS IS REIMBURSED IN...) |
||||||||||||||
Property / summary | |||||||||||||||
THE PURPOSE OF THE INVESTMENT IS THE CONSTRUCTION OF INFRASTRUCTURE FOR THE PRODUCTION OF ELECTRICITY FROM RENEWABLE SOURCES – PHOTOVOLTAIC POWER PLANT WITH A TOTAL CAPACITY OF 30,9 KWP. THE INVESTMENT WILL BE LOCATED ON 2 ROOFS OF BUILDINGS BELONGING TO P.U.H. “L.K.R. NOWAKOWSCY” COMPANY AJWNA IN WHITE RAWSKA: 21 KWP AT A GAS STATION AND 9,90 KWP AT A CAR WASH. THE MONEY SPENT ON CONSTRUCTION AND ASSEMBLY WORKS OF INSTALLATIONS IS REIMBURSED IN THE FORM OF LOWER COSTS FOR ELECTRICITY. THE EFFECTIVENESS OF SUCH AN INVESTMENT DEPENDS ON THE INITIAL STATE OF THE BUILDING, THE RANGE OF ACTIONS TAKEN AND THE TECHNICAL SOLUTIONS USED. THE INVESTMENT WILL RESULT IN A 98.03 % REDUCTION IN ENERGY DEMAND IN BOTH FACILITIES AND A REDUCTION OF CO2 BY 25.05 TONNES OF CO2/ROK EQUIVALENT – THE MAIN OBJECTIVES. THE INVESTMENT WILL BE CARRIED OUT WITHIN 3 TASKS DESCRIBED IN DETAIL IN ITEM VIII OF THE APPLICATION (PREPARATION OF DESIGN DOCUMENTATION, CONSTRUCTION WORKS, INFORMATION AND PROMOTION) THE BASIC TARGET GROUP ARE THE EMPLOYEES OF THE COMPANY: P.U.H. “L.K.R. NOWAKOVSCY” SP. J. INTERMEDIATE GROUP OF CUSTOMERS WILL BE BUILT BY RESIDENTS OF BIAŁYSTOK RAWSKA DUE TO THE IMPROVEMENT OF THE LOCAL ENVIRONMENT, REDUCTION OF DUST EMISSIONS AND CO2.THE PLANNED INVESTMENT IS IMPLEMENTED IN ACCORDANCE WITH THE PRINCIPLE OF UNIVERSAL DESIGN ENSURES EQUAL ACCESS TO PROJECT EFFECTS. THE ELECTRICITY GENERATED DOES NOT RESTRICT ACCESS TO ANY USER, SINCE THE GENERATED ELECTRICITY FROM RES IS A PRODUCT THAT IS ACCESSIBLE TO ALL WITHOUT LIMITATION AND WILL CLEARLY NOT CREATE ARCHITECTURAL BARRIERS FOR PEOPLE WITH DISABILITIES TO BENEFIT FROM THE EFFECTS OF THE PROJECT.THERE IS THEREFORE NO NEED FOR ADDITIONAL SOLUTIONS TO MEET THE PRINCIPLE OF EQUAL OPPORTUNITIES AND NON-DISCRIMINATION, INCLUDING ACCESSIBILITY FOR PEOPLE WITH DISABILITIES, AND THE PROJECT WILL INVOLVE PEOPLE INVOLVED IN INVESTMENT ACTIVITIES BECAUSE OF THEIR QUALIFICATIONS AND EXPERIENCE, REGARDLESS OF THEIR GENDER. (English) | |||||||||||||||
Property / summary: THE PURPOSE OF THE INVESTMENT IS THE CONSTRUCTION OF INFRASTRUCTURE FOR THE PRODUCTION OF ELECTRICITY FROM RENEWABLE SOURCES – PHOTOVOLTAIC POWER PLANT WITH A TOTAL CAPACITY OF 30,9 KWP. THE INVESTMENT WILL BE LOCATED ON 2 ROOFS OF BUILDINGS BELONGING TO P.U.H. “L.K.R. NOWAKOWSCY” COMPANY AJWNA IN WHITE RAWSKA: 21 KWP AT A GAS STATION AND 9,90 KWP AT A CAR WASH. THE MONEY SPENT ON CONSTRUCTION AND ASSEMBLY WORKS OF INSTALLATIONS IS REIMBURSED IN THE FORM OF LOWER COSTS FOR ELECTRICITY. THE EFFECTIVENESS OF SUCH AN INVESTMENT DEPENDS ON THE INITIAL STATE OF THE BUILDING, THE RANGE OF ACTIONS TAKEN AND THE TECHNICAL SOLUTIONS USED. THE INVESTMENT WILL RESULT IN A 98.03 % REDUCTION IN ENERGY DEMAND IN BOTH FACILITIES AND A REDUCTION OF CO2 BY 25.05 TONNES OF CO2/ROK EQUIVALENT – THE MAIN OBJECTIVES. THE INVESTMENT WILL BE CARRIED OUT WITHIN 3 TASKS DESCRIBED IN DETAIL IN ITEM VIII OF THE APPLICATION (PREPARATION OF DESIGN DOCUMENTATION, CONSTRUCTION WORKS, INFORMATION AND PROMOTION) THE BASIC TARGET GROUP ARE THE EMPLOYEES OF THE COMPANY: P.U.H. “L.K.R. NOWAKOVSCY” SP. J. INTERMEDIATE GROUP OF CUSTOMERS WILL BE BUILT BY RESIDENTS OF BIAŁYSTOK RAWSKA DUE TO THE IMPROVEMENT OF THE LOCAL ENVIRONMENT, REDUCTION OF DUST EMISSIONS AND CO2.THE PLANNED INVESTMENT IS IMPLEMENTED IN ACCORDANCE WITH THE PRINCIPLE OF UNIVERSAL DESIGN ENSURES EQUAL ACCESS TO PROJECT EFFECTS. THE ELECTRICITY GENERATED DOES NOT RESTRICT ACCESS TO ANY USER, SINCE THE GENERATED ELECTRICITY FROM RES IS A PRODUCT THAT IS ACCESSIBLE TO ALL WITHOUT LIMITATION AND WILL CLEARLY NOT CREATE ARCHITECTURAL BARRIERS FOR PEOPLE WITH DISABILITIES TO BENEFIT FROM THE EFFECTS OF THE PROJECT.THERE IS THEREFORE NO NEED FOR ADDITIONAL SOLUTIONS TO MEET THE PRINCIPLE OF EQUAL OPPORTUNITIES AND NON-DISCRIMINATION, INCLUDING ACCESSIBILITY FOR PEOPLE WITH DISABILITIES, AND THE PROJECT WILL INVOLVE PEOPLE INVOLVED IN INVESTMENT ACTIVITIES BECAUSE OF THEIR QUALIFICATIONS AND EXPERIENCE, REGARDLESS OF THEIR GENDER. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: THE PURPOSE OF THE INVESTMENT IS THE CONSTRUCTION OF INFRASTRUCTURE FOR THE PRODUCTION OF ELECTRICITY FROM RENEWABLE SOURCES – PHOTOVOLTAIC POWER PLANT WITH A TOTAL CAPACITY OF 30,9 KWP. THE INVESTMENT WILL BE LOCATED ON 2 ROOFS OF BUILDINGS BELONGING TO P.U.H. “L.K.R. NOWAKOWSCY” COMPANY AJWNA IN WHITE RAWSKA: 21 KWP AT A GAS STATION AND 9,90 KWP AT A CAR WASH. THE MONEY SPENT ON CONSTRUCTION AND ASSEMBLY WORKS OF INSTALLATIONS IS REIMBURSED IN THE FORM OF LOWER COSTS FOR ELECTRICITY. THE EFFECTIVENESS OF SUCH AN INVESTMENT DEPENDS ON THE INITIAL STATE OF THE BUILDING, THE RANGE OF ACTIONS TAKEN AND THE TECHNICAL SOLUTIONS USED. THE INVESTMENT WILL RESULT IN A 98.03 % REDUCTION IN ENERGY DEMAND IN BOTH FACILITIES AND A REDUCTION OF CO2 BY 25.05 TONNES OF CO2/ROK EQUIVALENT – THE MAIN OBJECTIVES. THE INVESTMENT WILL BE CARRIED OUT WITHIN 3 TASKS DESCRIBED IN DETAIL IN ITEM VIII OF THE APPLICATION (PREPARATION OF DESIGN DOCUMENTATION, CONSTRUCTION WORKS, INFORMATION AND PROMOTION) THE BASIC TARGET GROUP ARE THE EMPLOYEES OF THE COMPANY: P.U.H. “L.K.R. NOWAKOVSCY” SP. J. INTERMEDIATE GROUP OF CUSTOMERS WILL BE BUILT BY RESIDENTS OF BIAŁYSTOK RAWSKA DUE TO THE IMPROVEMENT OF THE LOCAL ENVIRONMENT, REDUCTION OF DUST EMISSIONS AND CO2.THE PLANNED INVESTMENT IS IMPLEMENTED IN ACCORDANCE WITH THE PRINCIPLE OF UNIVERSAL DESIGN ENSURES EQUAL ACCESS TO PROJECT EFFECTS. THE ELECTRICITY GENERATED DOES NOT RESTRICT ACCESS TO ANY USER, SINCE THE GENERATED ELECTRICITY FROM RES IS A PRODUCT THAT IS ACCESSIBLE TO ALL WITHOUT LIMITATION AND WILL CLEARLY NOT CREATE ARCHITECTURAL BARRIERS FOR PEOPLE WITH DISABILITIES TO BENEFIT FROM THE EFFECTS OF THE PROJECT.THERE IS THEREFORE NO NEED FOR ADDITIONAL SOLUTIONS TO MEET THE PRINCIPLE OF EQUAL OPPORTUNITIES AND NON-DISCRIMINATION, INCLUDING ACCESSIBILITY FOR PEOPLE WITH DISABILITIES, AND THE PROJECT WILL INVOLVE PEOPLE INVOLVED IN INVESTMENT ACTIVITIES BECAUSE OF THEIR QUALIFICATIONS AND EXPERIENCE, REGARDLESS OF THEIR GENDER. (English) / qualifier | |||||||||||||||
point in time: 17 October 2020
|
Revision as of 15:41, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | P.U.H. “L.K.R. NOWAKWSCCY”, A COMPANY REGISTERED BY THE INSTALLATION OF SOLAR PANELS WITH A CAPACITY OF 30,9 KWP FOR INVESTMENT IN A WHITE RAWSKA INVESTMENT AT UL. POLISH ARMY 49. |
Project in Poland financed by DG Regio |
Statements
107,631.25 zloty
0 references
126,625.0 zloty
0 references
85.0 percent
0 references
29 July 2016
0 references
7 December 2017
0 references
P.U.H. „L.K.R. NOWAKOWSCY” SPÓŁKA JAWNA
0 references
PRZEDMIOTEM INWESTYCJI JEST BUDOWA INFRASTRUKTURY SŁUŻĄCEJ DO PRODUKCJI ENERGII ELEKTRYCZNEJ POCHODZĄCEJ ZE ŹRÓDEŁ ODNAWIALNYCH - ELEKTROWNI FOTOWOLTAICZNEJ O ŁĄCZNEJ MOCY 30,9 KWP. INWESTYCJA BĘDZIE ZLOKALIZOWANA NA 2 DACHACH BUDYNKÓW NALEŻĄCYCH DO FIRMY P.U.H. „L.K.R. NOWAKOWSCY” SPÓŁKA AJWNA W BIAŁEJ RAWSKIEJ: 21 KWP NA STACJI BENZYNOWEJ I 9,90 KWP NA MYJNI SAMOCHODOWEJ. PIENIĄDZE WYDANE NA PRACE BUDOWLANO-MONTAŻOWE INSTALACJI ZWRACAJĄ SIĘ W POSTACI MNIEJSZYCH WYDATKÓW ZA ENERGIĘ ELEKTRYCZNĄ. EFEKTYWNOŚĆ TAKIEJ INWESTYCJI ZALEŻY OD WYJŚCIOWEGO STANU BUDYNKU, ZAKRESU PODJĘTYCH DZIAŁAŃ, JAK TEŻ ZASTOSOWANYCH ROZWIĄZAŃ TECHNICZNYCH. W WYNIKU REALIZACJI INWESTYCJI NASTĄPI ZMNIEJSZENIE ZAPOTRZEBOWANIA NA ENERGIĘ W OBU OBIEKTACH O 98,03% ORAZ REDUKCJA CO2 O 25,05 TON RÓWNOWAŻNIKA CO2/ROK – GŁÓWNE CELE. INWESTYCJA WYKONANA BĘDZIE W RAMACH 3 ZADAŃ SZCZEGÓŁOWO OPISANYCH W PUNKCIE VIII WNIOSKU (PRZYGOTOWANIE DOKUMENTACJI PROJEKTOWEJ, ROBOTY BUDOWLANE, INFORMACJA I PROMOCJA) PODSTAWOWA GRUPĘ DOCELOWĄ STANOWIĄ PRACOWNICY FIRMY : P.U.H. „L.K.R. NOWAKOWSCY” SP. J. POŚREDNIĄ GRUPĘ ODBIORCÓW STAWIĄ MIESZKAŃCY MIASTA BIAŁA RAWSKA ZE WZGLĘDU NA POPRAWĘ STANU LOKALNEGO ŚRODOWISKA NATURALNEGO, ZMNIEJSZENIE EMISJI PYŁÓW I CO2.PLANOWANA INWESTYCJA JEST REALIZOWANA ZGODNIE Z ZASADĄ UNIWERSALNEGO PROJEKTOWANIA ZAPEWNIA RÓWNY DOSTĘP DO EFEKTÓW PROJEKTU. WYTWORZONA ENERGIA ELEKTRYCZNA NIE OGRANICZA DOSTĘPU ŻADNEMU UŻYTKOWNIKOWI, GDYŻ WYTWORZONA ENERGIA ELEKTRYCZNA Z OZE JEST PRODUKTEM KTÓRY DOSTĘPNY JEST DLA WSZYSTKICH BEZ OGRANICZEŃ I W SPOSÓB OCZYWISTY NIE BĘDZIE POWODOWAŁ POWSTANIA BARIER ARCHITEKTONICZNYCH DLA OSÓB NIEPEŁNOSPRAWNYCH DO KORZYSTANIA Z EFEKTÓW PROJEKTU.NIE MA WIĘC POTRZEBY STOSOWANIA DODATKOWYCH ROZWIĄZAŃ UMOŻLIWIAJĄCYCH SPEŁNIENIE ZASADY RÓWNOŚCI SZANS I NIEDYSKRYMINACJI W TYM DOSTĘPNOŚĆ DLA OSÓB NIEPEŁNOSPRAWNYCH, PONADTO W RAMACH PROJEKTU ANGAŻOWANE DO DZIAŁAŃ ZWIĄZANYCH Z INWESTYCJĄ BĘDĄ OSOBY ZE WZGLĘDU NA ICH KWALIFIKACJE I DOŚWIADCZENIE, BEZ WZGLĘDU NA ICH PŁEĆ (Polish)
0 references
THE PURPOSE OF THE INVESTMENT IS THE CONSTRUCTION OF INFRASTRUCTURE FOR THE PRODUCTION OF ELECTRICITY FROM RENEWABLE SOURCES – PHOTOVOLTAIC POWER PLANT WITH A TOTAL CAPACITY OF 30,9 KWP. THE INVESTMENT WILL BE LOCATED ON 2 ROOFS OF BUILDINGS BELONGING TO P.U.H. “L.K.R. NOWAKOWSCY” COMPANY AJWNA IN WHITE RAWSKA: 21 KWP AT A GAS STATION AND 9,90 KWP AT A CAR WASH. THE MONEY SPENT ON CONSTRUCTION AND ASSEMBLY WORKS OF INSTALLATIONS IS REIMBURSED IN THE FORM OF LOWER COSTS FOR ELECTRICITY. THE EFFECTIVENESS OF SUCH AN INVESTMENT DEPENDS ON THE INITIAL STATE OF THE BUILDING, THE RANGE OF ACTIONS TAKEN AND THE TECHNICAL SOLUTIONS USED. THE INVESTMENT WILL RESULT IN A 98.03 % REDUCTION IN ENERGY DEMAND IN BOTH FACILITIES AND A REDUCTION OF CO2 BY 25.05 TONNES OF CO2/ROK EQUIVALENT – THE MAIN OBJECTIVES. THE INVESTMENT WILL BE CARRIED OUT WITHIN 3 TASKS DESCRIBED IN DETAIL IN ITEM VIII OF THE APPLICATION (PREPARATION OF DESIGN DOCUMENTATION, CONSTRUCTION WORKS, INFORMATION AND PROMOTION) THE BASIC TARGET GROUP ARE THE EMPLOYEES OF THE COMPANY: P.U.H. “L.K.R. NOWAKOVSCY” SP. J. INTERMEDIATE GROUP OF CUSTOMERS WILL BE BUILT BY RESIDENTS OF BIAŁYSTOK RAWSKA DUE TO THE IMPROVEMENT OF THE LOCAL ENVIRONMENT, REDUCTION OF DUST EMISSIONS AND CO2.THE PLANNED INVESTMENT IS IMPLEMENTED IN ACCORDANCE WITH THE PRINCIPLE OF UNIVERSAL DESIGN ENSURES EQUAL ACCESS TO PROJECT EFFECTS. THE ELECTRICITY GENERATED DOES NOT RESTRICT ACCESS TO ANY USER, SINCE THE GENERATED ELECTRICITY FROM RES IS A PRODUCT THAT IS ACCESSIBLE TO ALL WITHOUT LIMITATION AND WILL CLEARLY NOT CREATE ARCHITECTURAL BARRIERS FOR PEOPLE WITH DISABILITIES TO BENEFIT FROM THE EFFECTS OF THE PROJECT.THERE IS THEREFORE NO NEED FOR ADDITIONAL SOLUTIONS TO MEET THE PRINCIPLE OF EQUAL OPPORTUNITIES AND NON-DISCRIMINATION, INCLUDING ACCESSIBILITY FOR PEOPLE WITH DISABILITIES, AND THE PROJECT WILL INVOLVE PEOPLE INVOLVED IN INVESTMENT ACTIVITIES BECAUSE OF THEIR QUALIFICATIONS AND EXPERIENCE, REGARDLESS OF THEIR GENDER. (English)
17 October 2020
0 references
Identifiers
RPLD.04.01.02-10-0032/16
0 references