RECONSTRUCTION AND EXTENSION OF PART OF THE EXISTING SCHOOL TO THE PUBLIC PRE-SCHOOL (Q102354): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): OBJECT. DEVELOPMENT AND RECONSTRUCTION OF THE ZSO BUILDING IN ZAPPOLICACH FOR THE RUNNING OF THE KINDERGARTEN FOR 100 CHILDREN. THE PROJECT WILL CONTRIBUTE TO THE DIRECT OBJECTIVE OF DEVELOPING EDUCATIONAL SERVICES. THIS WILL BE ACHIEVED THROUGH CONSTRUCTION AND INSTALLATION WORKS, ASSEMBLY WITH EQUIPMENT AND EQUIPMENT AND TEACHING AIDS FOR THE OPERATION OF THE NURSERY. THE PROJECT FOR THE EXTENSION AND CONVERSION OF A BUILDING INCLUDES A TWO-...)
(‎Created claim: summary (P836): THE OBJECT OF THE PROJECT. IT WILL BE REFERRED AND RECONSTRUCTION OF THE ZSO BUILDING IN ZAPOLICACH FOR THE OPERATION OF A KINDERGARTEN FOR 100 CHILDREN. THE PROJECT WILL CONTRIBUTE TO ACHIEVING THE DIRECT OBJECTIVE OF DEVELOPING EDUCATIONAL SERVICES. ACHIEVING THIS GOAL WILL BE POSSIBLE THANKS TO THE IMPLEMENTATION OF CONSTRUCTION AND INSTALLATION WORKS, ASSEMBLY WORKS WITH EQUIPMENT AND EQUIPMENT AND TEACHING AIDS FOR THE OPERATION OF THE KIND...)
Property / summary
 
THE OBJECT OF THE PROJECT. IT WILL BE REFERRED AND RECONSTRUCTION OF THE ZSO BUILDING IN ZAPOLICACH FOR THE OPERATION OF A KINDERGARTEN FOR 100 CHILDREN. THE PROJECT WILL CONTRIBUTE TO ACHIEVING THE DIRECT OBJECTIVE OF DEVELOPING EDUCATIONAL SERVICES. ACHIEVING THIS GOAL WILL BE POSSIBLE THANKS TO THE IMPLEMENTATION OF CONSTRUCTION AND INSTALLATION WORKS, ASSEMBLY WORKS WITH EQUIPMENT AND EQUIPMENT AND TEACHING AIDS FOR THE OPERATION OF THE KINDERGARTEN. THE EXTENSION AND REBUILDING OF THE BUILDING INCLUDES A TWO-STOREY STRUCTURE IN THE DESIGN PART, PARTIALLY SUBLIMINATED IN A SINGLE-STOREY PART. THE EXISTING SCHOOL WILL BE EXPANDED BY A PUBLIC KINDERGARTEN, AND IN THE RECONSTRUCTED PART, WHICH WILL BE A LINK BETWEEN THE SCHOOL AND THE KINDERGARTEN, THE DIRECTOR’S ROOM, THE INDIVIDUAL WORK ROOM WITH CHILDREN, THE INTENDENT’S ROOM, THE WAREHOUSE AND THE SANITARY FACILITIES IN THE BASEMENT.IN THE BUILT-UP PART ON THE GROUND FLOOR THERE WAS A CANTEEN ROOM WITH A KITCHEN KNOT, A PRESCHOOL ROOM WITH A WAREHOUSE AND AN AUXILIARY ROOM. LEVEL ZERO OF THE GROUND FLOOR OF THE DESIGNED CONSTRUCTION WILL BE ABOVE 30CM ABOVE THE GROUND LEVEL, TO OVERCOME THE DIFFERENCE IN HEIGHT – DESIGNED STEPS AND RAMP FOR THE DISABLED – EXTERNAL. ON THE FLOOR ARE LOCATED P. TEACHERS, POM. SOCIAL SERVICES, POM. IT’S A GOSSIP. AND THREE KINDERGARTEN CLASSROOMS WITH WAREHOUSES AND SANITARY FACILITIES. THE WHOLE AREA AND THE BUILDING ARE AVAILABLE FOR OS. DISABLED THROUGH EXTERNAL RAMPS AND ELEVATORS IN THE BUILDING, OS. THE DISABLED HAS THE POSSIBILITY TO GET TO ALL LEVELS ON THEIR OWN, WHICH WILL SATISFY THE NEEDS OF CHILDREN WITH DISABILITIES IN G. ZAPOLIKA, WHO ARE CURRENTLY AT THE AGE OF 4 WITH A POSTPONED SCHOOLING OBLIGATION. TARGET GROUP: 100 CHILDREN OF WAR. I'M FROM LODZ. OBJECTIVES: TO INCREASE THE ACCESSIBILITY AND QUALITY OF SOCIAL SERVICES THAT REDUCE POVERTY AND SOCIAL EXCLUSION (English)
Property / summary: THE OBJECT OF THE PROJECT. IT WILL BE REFERRED AND RECONSTRUCTION OF THE ZSO BUILDING IN ZAPOLICACH FOR THE OPERATION OF A KINDERGARTEN FOR 100 CHILDREN. THE PROJECT WILL CONTRIBUTE TO ACHIEVING THE DIRECT OBJECTIVE OF DEVELOPING EDUCATIONAL SERVICES. ACHIEVING THIS GOAL WILL BE POSSIBLE THANKS TO THE IMPLEMENTATION OF CONSTRUCTION AND INSTALLATION WORKS, ASSEMBLY WORKS WITH EQUIPMENT AND EQUIPMENT AND TEACHING AIDS FOR THE OPERATION OF THE KINDERGARTEN. THE EXTENSION AND REBUILDING OF THE BUILDING INCLUDES A TWO-STOREY STRUCTURE IN THE DESIGN PART, PARTIALLY SUBLIMINATED IN A SINGLE-STOREY PART. THE EXISTING SCHOOL WILL BE EXPANDED BY A PUBLIC KINDERGARTEN, AND IN THE RECONSTRUCTED PART, WHICH WILL BE A LINK BETWEEN THE SCHOOL AND THE KINDERGARTEN, THE DIRECTOR’S ROOM, THE INDIVIDUAL WORK ROOM WITH CHILDREN, THE INTENDENT’S ROOM, THE WAREHOUSE AND THE SANITARY FACILITIES IN THE BASEMENT.IN THE BUILT-UP PART ON THE GROUND FLOOR THERE WAS A CANTEEN ROOM WITH A KITCHEN KNOT, A PRESCHOOL ROOM WITH A WAREHOUSE AND AN AUXILIARY ROOM. LEVEL ZERO OF THE GROUND FLOOR OF THE DESIGNED CONSTRUCTION WILL BE ABOVE 30CM ABOVE THE GROUND LEVEL, TO OVERCOME THE DIFFERENCE IN HEIGHT – DESIGNED STEPS AND RAMP FOR THE DISABLED – EXTERNAL. ON THE FLOOR ARE LOCATED P. TEACHERS, POM. SOCIAL SERVICES, POM. IT’S A GOSSIP. AND THREE KINDERGARTEN CLASSROOMS WITH WAREHOUSES AND SANITARY FACILITIES. THE WHOLE AREA AND THE BUILDING ARE AVAILABLE FOR OS. DISABLED THROUGH EXTERNAL RAMPS AND ELEVATORS IN THE BUILDING, OS. THE DISABLED HAS THE POSSIBILITY TO GET TO ALL LEVELS ON THEIR OWN, WHICH WILL SATISFY THE NEEDS OF CHILDREN WITH DISABILITIES IN G. ZAPOLIKA, WHO ARE CURRENTLY AT THE AGE OF 4 WITH A POSTPONED SCHOOLING OBLIGATION. TARGET GROUP: 100 CHILDREN OF WAR. I'M FROM LODZ. OBJECTIVES: TO INCREASE THE ACCESSIBILITY AND QUALITY OF SOCIAL SERVICES THAT REDUCE POVERTY AND SOCIAL EXCLUSION (English) / rank
 
Normal rank
Property / summary: THE OBJECT OF THE PROJECT. IT WILL BE REFERRED AND RECONSTRUCTION OF THE ZSO BUILDING IN ZAPOLICACH FOR THE OPERATION OF A KINDERGARTEN FOR 100 CHILDREN. THE PROJECT WILL CONTRIBUTE TO ACHIEVING THE DIRECT OBJECTIVE OF DEVELOPING EDUCATIONAL SERVICES. ACHIEVING THIS GOAL WILL BE POSSIBLE THANKS TO THE IMPLEMENTATION OF CONSTRUCTION AND INSTALLATION WORKS, ASSEMBLY WORKS WITH EQUIPMENT AND EQUIPMENT AND TEACHING AIDS FOR THE OPERATION OF THE KINDERGARTEN. THE EXTENSION AND REBUILDING OF THE BUILDING INCLUDES A TWO-STOREY STRUCTURE IN THE DESIGN PART, PARTIALLY SUBLIMINATED IN A SINGLE-STOREY PART. THE EXISTING SCHOOL WILL BE EXPANDED BY A PUBLIC KINDERGARTEN, AND IN THE RECONSTRUCTED PART, WHICH WILL BE A LINK BETWEEN THE SCHOOL AND THE KINDERGARTEN, THE DIRECTOR’S ROOM, THE INDIVIDUAL WORK ROOM WITH CHILDREN, THE INTENDENT’S ROOM, THE WAREHOUSE AND THE SANITARY FACILITIES IN THE BASEMENT.IN THE BUILT-UP PART ON THE GROUND FLOOR THERE WAS A CANTEEN ROOM WITH A KITCHEN KNOT, A PRESCHOOL ROOM WITH A WAREHOUSE AND AN AUXILIARY ROOM. LEVEL ZERO OF THE GROUND FLOOR OF THE DESIGNED CONSTRUCTION WILL BE ABOVE 30CM ABOVE THE GROUND LEVEL, TO OVERCOME THE DIFFERENCE IN HEIGHT – DESIGNED STEPS AND RAMP FOR THE DISABLED – EXTERNAL. ON THE FLOOR ARE LOCATED P. TEACHERS, POM. SOCIAL SERVICES, POM. IT’S A GOSSIP. AND THREE KINDERGARTEN CLASSROOMS WITH WAREHOUSES AND SANITARY FACILITIES. THE WHOLE AREA AND THE BUILDING ARE AVAILABLE FOR OS. DISABLED THROUGH EXTERNAL RAMPS AND ELEVATORS IN THE BUILDING, OS. THE DISABLED HAS THE POSSIBILITY TO GET TO ALL LEVELS ON THEIR OWN, WHICH WILL SATISFY THE NEEDS OF CHILDREN WITH DISABILITIES IN G. ZAPOLIKA, WHO ARE CURRENTLY AT THE AGE OF 4 WITH A POSTPONED SCHOOLING OBLIGATION. TARGET GROUP: 100 CHILDREN OF WAR. I'M FROM LODZ. OBJECTIVES: TO INCREASE THE ACCESSIBILITY AND QUALITY OF SOCIAL SERVICES THAT REDUCE POVERTY AND SOCIAL EXCLUSION (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:37, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
RECONSTRUCTION AND EXTENSION OF PART OF THE EXISTING SCHOOL TO THE PUBLIC PRE-SCHOOL
Project in Poland financed by DG Regio

    Statements

    0 references
    2,923,748.22 zloty
    0 references
    701,699.57 Euro
    13 January 2020
    0 references
    3,439,703.79 zloty
    0 references
    825,528.91 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 February 2016
    0 references
    31 December 2019
    0 references
    GMINA ZAPOLICE
    0 references

    51°32'27.6"N, 18°52'55.6"E
    0 references
    PRZEDMIOTEM PROJ. BĘDZIE ROZBUDOWYA I PRZEBUDOWA BUDYNKU ZSO W ZAPOLICACH Z PRZEZNACZENIEM NA FUNKCJONOWANIE PRZEDSZKOLA DLA 100 DZIECI. PROJEKT PRZYCZYNI SIĘ DO OSIĄGNIĘCIA CELU BEZPOŚREDNIEGO, JAKIM JEST ROZWÓJ USŁUG EDUKACYJNYCH. OSIĄGNIĘCIE TEGO CELU BĘDZIE MOŻLIWE DZIĘKI REALIZACJI ROBÓT BUDOWLANO-INSTALACYJNYCH, MONTAŻOWYCH Z WYPOSAŻENIEM I DOPOSAŻENIEM W SPRZĘT I POMOCE DYDAKTYCZNE NA POTRZEBY FUNKCJONOWANIA PRZEDSZKOLA. PROJEKT ROZBUDOWY I PRZEBUDOWY BUDYNKU OBEJMUJE OBIEKT DWUKONDYGNACYJNY W CZĘŚCI PROJEKTOWANEJ, CZĘŚCIOWO PODPIWNICZONY W CZĘŚCI PRZEBUDOWYWANEJ JEDNOKONDYGNACYJNEJ. ISTNIEJĄCA SZKOŁA ZOSTANIE ROZBUDOWANA O PRZEDSZKOLE PUBLICZNE, A W CZĘŚCI PRZEBUDOWYWANEJ, KTÓRA BĘDZIE ŁĄCZNIKIEM POMIĘDZY SZKOŁĄ A PRZEDSZKOLEM ZLOKALIZOWANO POKÓJ DYREKTORA, POMIESZCZENIE DO PRACY INDYWIDUALNEJ Z DZIEĆMI, POKÓJ INTENDENTKI, MAGAZYN I SANITARIATY, W PIWNICY MAGAZYN, MAGAZYN Z KOTŁOWNIĄ.W CZĘŚCI DOBUDOWANEJ NA PARTERZE ZLOKALIZOWANO POMIESZCZENIE STOŁÓWKI Z WĘZŁEM KUCHENNYM, SALĘ GRUPY PRZEDSZKOLNEJ Z MAGAZYNEM I SANITARIATAMI, SZATNIE I POMIESZCZENIA POMOCNICZE. POZIOM ZERO POSADZKI PARTERU PROJEKTOWANEJ BUDOWY POSADOWIONY ZOSTANIE POWYŻEJ 30CM PONAD POZIOM TERENU, DLA POKONANIA RÓŻNICY WYSOKOŚCI – PROJEKTOWANE STOPNIE I POCHYLNIA DLA NIEPEŁNOSPRAWNYCH - ZEWNĘTRZNE. NA PIĘTRZE ZLOKALIZOWANO P. NAUCZYCIELI, POM. SOCJALNE, POM. GOSPOD. ORAZ TRZY SALE GRUP PRZEDSZKOLNYCH Z MAGAZYNAMI I SANITARIATAMI. CAŁY TEREN ORAZ BUDYNEK SĄ DOSTĘPNE DLA OS. NIEPEŁNOSPRAWNYCH POPRZEZ ZASTOSOWANE POCHYLNI ZEWNĘTRZNYCH ORAZ WINDY W BUDYNKU, OS. NIEPEŁNOSPRAWNA MA MOŻLIWOŚĆ DOSTANIA SIĘ SAMODZIELNIE NA WSZYSTKIE POZIOMY CO ZASPOKOI POTRZEBY DZIECI Z NIEPEŁNOSPRAWNOŚCIĄ W G. ZAPOLICE KTÓRE OBECNIE SĄ W WIEKU 4 LAT Z ODROCZONYM OBOWIAZKIEM NAUKI W SZKOLE. GRUPA DOCELOWA: 100 DZIECI WOJ. ŁÓDZKIEGO. ZADANIA:ZWIĘKSZENIE DOSTĘPNOŚCI I JAKOŚCI USŁUG SPOŁECZNYCH OGRANICZAJĄCYCH UBÓSTWO I WYKLUCZENIE SPOŁECZNE (Polish)
    0 references
    THE OBJECT OF THE PROJECT. IT WILL BE REFERRED AND RECONSTRUCTION OF THE ZSO BUILDING IN ZAPOLICACH FOR THE OPERATION OF A KINDERGARTEN FOR 100 CHILDREN. THE PROJECT WILL CONTRIBUTE TO ACHIEVING THE DIRECT OBJECTIVE OF DEVELOPING EDUCATIONAL SERVICES. ACHIEVING THIS GOAL WILL BE POSSIBLE THANKS TO THE IMPLEMENTATION OF CONSTRUCTION AND INSTALLATION WORKS, ASSEMBLY WORKS WITH EQUIPMENT AND EQUIPMENT AND TEACHING AIDS FOR THE OPERATION OF THE KINDERGARTEN. THE EXTENSION AND REBUILDING OF THE BUILDING INCLUDES A TWO-STOREY STRUCTURE IN THE DESIGN PART, PARTIALLY SUBLIMINATED IN A SINGLE-STOREY PART. THE EXISTING SCHOOL WILL BE EXPANDED BY A PUBLIC KINDERGARTEN, AND IN THE RECONSTRUCTED PART, WHICH WILL BE A LINK BETWEEN THE SCHOOL AND THE KINDERGARTEN, THE DIRECTOR’S ROOM, THE INDIVIDUAL WORK ROOM WITH CHILDREN, THE INTENDENT’S ROOM, THE WAREHOUSE AND THE SANITARY FACILITIES IN THE BASEMENT.IN THE BUILT-UP PART ON THE GROUND FLOOR THERE WAS A CANTEEN ROOM WITH A KITCHEN KNOT, A PRESCHOOL ROOM WITH A WAREHOUSE AND AN AUXILIARY ROOM. LEVEL ZERO OF THE GROUND FLOOR OF THE DESIGNED CONSTRUCTION WILL BE ABOVE 30CM ABOVE THE GROUND LEVEL, TO OVERCOME THE DIFFERENCE IN HEIGHT – DESIGNED STEPS AND RAMP FOR THE DISABLED – EXTERNAL. ON THE FLOOR ARE LOCATED P. TEACHERS, POM. SOCIAL SERVICES, POM. IT’S A GOSSIP. AND THREE KINDERGARTEN CLASSROOMS WITH WAREHOUSES AND SANITARY FACILITIES. THE WHOLE AREA AND THE BUILDING ARE AVAILABLE FOR OS. DISABLED THROUGH EXTERNAL RAMPS AND ELEVATORS IN THE BUILDING, OS. THE DISABLED HAS THE POSSIBILITY TO GET TO ALL LEVELS ON THEIR OWN, WHICH WILL SATISFY THE NEEDS OF CHILDREN WITH DISABILITIES IN G. ZAPOLIKA, WHO ARE CURRENTLY AT THE AGE OF 4 WITH A POSTPONED SCHOOLING OBLIGATION. TARGET GROUP: 100 CHILDREN OF WAR. I'M FROM LODZ. OBJECTIVES: TO INCREASE THE ACCESSIBILITY AND QUALITY OF SOCIAL SERVICES THAT REDUCE POVERTY AND SOCIAL EXCLUSION (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.07.04.02-10-0018/16
    0 references