(‎Removed claim: summary (P836): The project concerns the renovation work to which 1 public works will be subjected to a construction site located in the municipality of Byobowo — Building of the Primary School which includes a library and a gym in Małki. The project will be implemented in Małki, 87-325 Małki. The main problem identified in the building is mainly the inefficient use of thermal energy, which is reflected in high operating costs and significant emissions of env...)
Property / summary
The project concerns the renovation work to which 1 public works will be subjected to a construction site located in the municipality of Byobowo — Building of the Primary School which includes a library and a gym in Małki. The project will be implemented in Małki, 87-325 Małki. The main problem identified in the building is mainly the inefficient use of thermal energy, which is reflected in high operating costs and significant emissions of environmentally harmful substances. The main purpose of the project is to reduce heat losses and the economic use of heat through the thermal modernisation of: please see the ceiling below the heated terach, the roof floor and the external walls of the site (without the day-care facilities), the replacement of windows in the gym and the replacement of the heat source. The detailed scope is to be found in the SW and C.2. and for the design. Thermal modernisation works are planned to be carried out in the second and third quarter of 2018, and no later than 31.10.2018. The project is carried out in a building building consisting of a primary school, a gym, a library and a rural centre. (English)
 
Property / summary: The project concerns the renovation work to which 1 public works will be subjected to a construction site located in the municipality of Byobowo — Building of the Primary School which includes a library and a gym in Małki. The project will be implemented in Małki, 87-325 Małki. The main problem identified in the building is mainly the inefficient use of thermal energy, which is reflected in high operating costs and significant emissions of environmentally harmful substances. The main purpose of the project is to reduce heat losses and the economic use of heat through the thermal modernisation of: please see the ceiling below the heated terach, the roof floor and the external walls of the site (without the day-care facilities), the replacement of windows in the gym and the replacement of the heat source. The detailed scope is to be found in the SW and C.2. and for the design. Thermal modernisation works are planned to be carried out in the second and third quarter of 2018, and no later than 31.10.2018. The project is carried out in a building building consisting of a primary school, a gym, a library and a rural centre. (English) / rank
Normal rank
 

Revision as of 14:29, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the primary school in Małki with expansion and extension and modernisation of the existing boiler room
Project in Poland financed by DG Regio

    Statements

    0 references
    385,469.87 zloty
    0 references
    92,512.77 Euro
    13 January 2020
    0 references
    550,671.25 zloty
    0 references
    132,161.1 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    1 January 2018
    0 references
    31 October 2018
    0 references
    GMINA BOBROWO
    0 references
    0 references
    Przedmiotem projektu są prace termomodernizacyjne, którym poddany zostanie 1 obiekt budowlany użyteczności publicznej zlokalizowany na terenie Gminy Bobrowo - Budynek Szkoły Podstawowej w skład którego wchodzi biblioteka i sala gimnastyczna w miejscowości Małki. Projekt będzie realizowany w miejscowości Małki, 87-325 Małki. Głównym problemem, jaki został zidentyfikowany w budynku jest przede wszystkim nieefektywne wykorzystywanie energii cieplnej, co przejawia się w wysokich kosztach eksploatacyjnych oraz znacznej emisji substancji szkodliwych dla środowiska. Głównym celem realizacji projektu jest ograniczenie strat ciepła i ekonomiczne wykorzystanie energii cieplnej poprzez termomodernizację do której należy: dociep. stropu pod nieogrzewanym strychem, stropodachu oraz ścian zewnętrznych obiektu (bez pomieszczeń świetlicy), wymiana okien w sali gimnastycznej oraz wymiana źródła ciepła. Szczegółowy zakres znajduje się w SW i C.2 Wn. oraz dok.projekt. Prace termomodernizacyjne planowane są na II i III kw.2018 r.nie później jednak niż do dnia 31.10.2018r. Projekt realizowany jest na obiekcie budowlanym składający się z pomieszczeń szkoły podstawowej, sali gimnastycznej, biblioteki i świetlicy wiejskiej. (Polish)
    0 references

    Identifiers

    RPKP.03.03.00-04-0067/16
    0 references